Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production restored at well M-66 in Azerbaijan

27 Jul 2017 07:00

RNS Number : 2256M
Zenith Energy Ltd
27 July 2017
 

July 27, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Production restored at well M-66 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that production has successfully been restored at well M-66 in the Muradkhanli field.

 

Production History of well M-66

 

Well M-66 was drilled in 1978 with initial flow rates of 14 BOPD. Acid fracturing, performed shortly after completion, increased production to 284 BOPD. In 1999 well M-66 became shut in.

 

CTU Well Interventions

 

Well M-66 has been cleaned out to a depth of 3011 meters with a coiled tubing unit (CTU) using nitrogen. This procedure has restored production and achieved a flow rate of 15 BOPD. 150 barrels of oil which had accumulated in the wellbore were also recovered during the well intervention.

 

This operation is part of a larger, systematic programme towards economically maximising production at non-producing and underperforming wells across Zenith's 642.4 km2 contract area.

 

Team A, comprised of Zenith's field personnel operating the Company's workover rig, together with Team C, comprised of Smape Srl contractors operating a CTU, will now move to the Zardab field to engage in a series of high-impact workovers. A number of wells in this field produced in excess of 500 BOPD for a short period of time before they became plugged-up with sand.

 

Wells M-45 and M-195 Update

The Company is awaiting delivery of electric submersible pumps (ESP's) for both these wells. Zenith will release an update when the pumps have been installed and the resulting flow rates have been determined.

 

Zenith Chief Executive Officer, Andrea Cattaneo, commented:

"I am pleased with this result. The recently arrived coiled tubing unit is now being employed as much as possible in all our well interventions. Our technical skillset has also been enhanced by the arrival from Canada of two workover specialists, a reservoir engineer and a drilling engineer. Our operational capabilities will further improve when we complete the acquisition of a new Chinese manufactured workover rig. The Company will make an announcement when this is completed and a delivery date is defined.

M-66 was one of the many wells selected for coiled tubing interventions. The small operational outlay relative to the significant increase achieved in production revenue from this well should not be overlooked.

It is clear that there is a vast amount of oil under the surface in the Muradkhanli field. It should, however, also be underlined that well workovers on old Soviet wells will deliver only progressive production increases as opposed to the exceptional flow rates made possible by successfully drilling new wells. As stated in previous announcements, we intend to begin drilling activities in 2018.

I look forward to our operations in the Zardab field, where some of the Company's most promising wells are located. It is important to note that no significant operations have been performed in this field during the last twenty years. I am confident that the use of a coiled tubing unit, combined with a strengthened operational team, will deliver strong results."

 

For further information, please contact:

Zenith Energy Ltd.

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

  

Abchurch (Financial PR/IR)

Tim Thompson

Telephone: +44 (0) 200 7398 7700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEFEDMFWSEFW
Date   Source Headline
10th Apr 20177:40 amRNSTeam A Operational Update, Azerbaijan
10th Apr 20177:00 amRNSUpdate - Convertible Notes and Admission of Shares
3rd Apr 20172:18 pmRNSHolding(s) in Company
3rd Apr 20177:00 amRNSZenith Announces Change of Auditor
23rd Mar 20174:30 pmRNSHolding(s) in Company
22nd Mar 20177:00 amRNSAppointment of Director
21st Mar 20171:30 pmRNSConversion of Sterling Denominated Loan Note
16th Mar 201711:44 amRNSHolding(s) in Company
16th Mar 20177:00 amRNSAppointment of Joint Broker and Azerbaijan Update
14th Mar 20177:00 amRNSUpdate on Previous Debt for Equity Announcement
6th Mar 20177:00 amRNSInterim Update on Workover of Well M-195
1st Mar 20177:44 amRNSZenith Announces 3rd Quarter Results
1st Mar 20177:00 amRNSZenith Announces Settlement of Debt for Shares
22nd Feb 20177:00 amRNSDirector Exercises Stock Options
20th Feb 20177:45 amRNSZenith Divests Argentine Operations
10th Feb 20177:00 amRNSSudden Passing Of Director
9th Feb 20177:00 amRNSWorkover Rig Begins Operations At Well M-195
8th Feb 201712:50 pmRNSHolding(s) in Company
31st Jan 20177:00 amRNSUpdate on Regulatory Matters
30th Jan 20177:40 amRNSZenith Issues Equity
30th Jan 20177:00 amRNSZenith Further Reduces Debt
25th Jan 20177:00 amRNSCEO Foregoes Salary in Lieu of Equity at Premium
24th Jan 20177:00 amRNSZenith Commences Workover Programme in Azerbaijan
23rd Jan 201710:01 amRNSAGM RESULTS AND ADOPTION OF ADVANCE NOTICE POLICY
23rd Jan 20177:00 amRNSAGM Results and Adoption of Advance Notice Policy
19th Jan 20177:40 amRNSZenith Energy Align Research note release
18th Jan 201710:30 amRNSHolding(s) in Company
13th Jan 20173:40 pmRNSDirector/PDMR Shareholding
11th Jan 20177:00 amRNSAdmission to Official List LSE and Placing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.