Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production restored at well M-66 in Azerbaijan

27 Jul 2017 07:00

RNS Number : 2256M
Zenith Energy Ltd
27 July 2017
 

July 27, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Production restored at well M-66 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that production has successfully been restored at well M-66 in the Muradkhanli field.

 

Production History of well M-66

 

Well M-66 was drilled in 1978 with initial flow rates of 14 BOPD. Acid fracturing, performed shortly after completion, increased production to 284 BOPD. In 1999 well M-66 became shut in.

 

CTU Well Interventions

 

Well M-66 has been cleaned out to a depth of 3011 meters with a coiled tubing unit (CTU) using nitrogen. This procedure has restored production and achieved a flow rate of 15 BOPD. 150 barrels of oil which had accumulated in the wellbore were also recovered during the well intervention.

 

This operation is part of a larger, systematic programme towards economically maximising production at non-producing and underperforming wells across Zenith's 642.4 km2 contract area.

 

Team A, comprised of Zenith's field personnel operating the Company's workover rig, together with Team C, comprised of Smape Srl contractors operating a CTU, will now move to the Zardab field to engage in a series of high-impact workovers. A number of wells in this field produced in excess of 500 BOPD for a short period of time before they became plugged-up with sand.

 

Wells M-45 and M-195 Update

The Company is awaiting delivery of electric submersible pumps (ESP's) for both these wells. Zenith will release an update when the pumps have been installed and the resulting flow rates have been determined.

 

Zenith Chief Executive Officer, Andrea Cattaneo, commented:

"I am pleased with this result. The recently arrived coiled tubing unit is now being employed as much as possible in all our well interventions. Our technical skillset has also been enhanced by the arrival from Canada of two workover specialists, a reservoir engineer and a drilling engineer. Our operational capabilities will further improve when we complete the acquisition of a new Chinese manufactured workover rig. The Company will make an announcement when this is completed and a delivery date is defined.

M-66 was one of the many wells selected for coiled tubing interventions. The small operational outlay relative to the significant increase achieved in production revenue from this well should not be overlooked.

It is clear that there is a vast amount of oil under the surface in the Muradkhanli field. It should, however, also be underlined that well workovers on old Soviet wells will deliver only progressive production increases as opposed to the exceptional flow rates made possible by successfully drilling new wells. As stated in previous announcements, we intend to begin drilling activities in 2018.

I look forward to our operations in the Zardab field, where some of the Company's most promising wells are located. It is important to note that no significant operations have been performed in this field during the last twenty years. I am confident that the use of a coiled tubing unit, combined with a strengthened operational team, will deliver strong results."

 

For further information, please contact:

Zenith Energy Ltd.

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

  

Abchurch (Financial PR/IR)

Tim Thompson

Telephone: +44 (0) 200 7398 7700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEFEDMFWSEFW
Date   Source Headline
5th Aug 20197:00 amRNSUpdate on Debt Financing
2nd Aug 20197:30 amRNSCompletion of Financing for Drilling Campaign
1st Aug 20197:00 amRNSFinancing of Drilling Campaign
31st Jul 20197:30 amRNSFiling of Quarterly Results and Operational Update
18th Jul 20197:00 amRNSCommencement of Well Deepening Operations
9th Jul 20197:00 amRNSDirector/PDMR Shareholding
4th Jul 20197:27 amRNSDirector/PDMR Shareholding
3rd Jul 20197:10 amRNSFiling of Annual Information Form
2nd Jul 20197:00 amRNSFiling of Audited Annual Results and 2019 CPR
19th Jun 20197:00 amRNSResult of AGM
29th May 20194:30 pmRNSNotice of AGM & Director/PDMR Shareholding
15th May 20197:00 amRNSDirector/PDMR Shareholding
14th May 20197:00 amRNSDirector/PDMR Shareholding
7th May 20197:00 amRNSDirector/PDMR Shareholding
3rd May 20194:40 pmRNSSecond Price Monitoring Extn
3rd May 20194:35 pmRNSPrice Monitoring Extension
3rd May 20197:00 amRNSIssue of Equity
25th Apr 20197:00 amRNSDirector/PDMR Shareholding
12th Apr 20197:00 amRNSDirector/PDMR Shareholding
8th Apr 20194:45 pmRNSConditional Approval of Canadian Financing
5th Apr 20194:30 pmRNSHolding(s) in Company
2nd Apr 20197:45 amRNSIssue of Equity
27th Mar 20197:00 amRNSMobilisation of Drilling Rig to well C-37
25th Mar 20194:30 pmRNSIssue of Notes
11th Mar 20197:00 amRNSFavourable renegotiation of Convertible Loan
25th Feb 20191:45 pmRNSDirector/PDMR Shareholding
21st Feb 20197:00 amRNSHolding(s) in Company
18th Feb 20197:00 amRNSFiling of Quarterly Results and Operational Update
8th Feb 20197:00 amRNSFinancing and Operational Update
23rd Jan 20197:00 amRNSPurchase of Drilling Equipment
11th Jan 20197:00 amRNSSuccessful Listing of Corporate Notes
7th Jan 20197:00 amRNSFinancing and Operational Update
23rd Nov 20187:30 amRNSOperational Update
20th Nov 20188:46 amRNSDirector/PDMR Shareholding
15th Nov 20187:00 amRNSFiling of Quarterly Results
12th Nov 20187:30 amRNSCompletion of Private Placement on Merkur Market
7th Nov 20189:00 amRNSADMISSION TRADING IN MERKUR MARKET, COMPLETION PP
2nd Nov 20187:00 amRNSBeginning of Comprehensive Reservoir Study
31st Oct 20186:30 pmRNSTotal Voting Rights
22nd Oct 20187:00 amRNSNew Geological Structure Identified in Well C-37
15th Oct 20187:00 amRNSCommencement of Operations in Well C-37
10th Oct 20187:00 amRNSZenith Receives "B+" with Positive Outlook Rating
2nd Oct 20187:00 amRNSIssue of CEO Salary Sacrifice Shares
27th Sep 20187:00 amRNSDirector/PDMR Shareholding
24th Sep 20187:00 amRNSDirector/PDMR Shareholding
5th Sep 20187:00 amRNSPurchase of Drilling Rig & Completion of Financing
15th Aug 20187:00 amRNSFiling of Quarterly Results
13th Aug 20187:02 amRNSAzerbaijan Operational Update
18th Jul 20187:00 amRNSDirector/PDMR Shareholding
16th Jul 20187:00 amRNSNew Operations Manager & Indonesia Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.