The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production restored at well M-66 in Azerbaijan

27 Jul 2017 07:00

RNS Number : 2256M
Zenith Energy Ltd
27 July 2017
 

July 27, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Production restored at well M-66 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that production has successfully been restored at well M-66 in the Muradkhanli field.

 

Production History of well M-66

 

Well M-66 was drilled in 1978 with initial flow rates of 14 BOPD. Acid fracturing, performed shortly after completion, increased production to 284 BOPD. In 1999 well M-66 became shut in.

 

CTU Well Interventions

 

Well M-66 has been cleaned out to a depth of 3011 meters with a coiled tubing unit (CTU) using nitrogen. This procedure has restored production and achieved a flow rate of 15 BOPD. 150 barrels of oil which had accumulated in the wellbore were also recovered during the well intervention.

 

This operation is part of a larger, systematic programme towards economically maximising production at non-producing and underperforming wells across Zenith's 642.4 km2 contract area.

 

Team A, comprised of Zenith's field personnel operating the Company's workover rig, together with Team C, comprised of Smape Srl contractors operating a CTU, will now move to the Zardab field to engage in a series of high-impact workovers. A number of wells in this field produced in excess of 500 BOPD for a short period of time before they became plugged-up with sand.

 

Wells M-45 and M-195 Update

The Company is awaiting delivery of electric submersible pumps (ESP's) for both these wells. Zenith will release an update when the pumps have been installed and the resulting flow rates have been determined.

 

Zenith Chief Executive Officer, Andrea Cattaneo, commented:

"I am pleased with this result. The recently arrived coiled tubing unit is now being employed as much as possible in all our well interventions. Our technical skillset has also been enhanced by the arrival from Canada of two workover specialists, a reservoir engineer and a drilling engineer. Our operational capabilities will further improve when we complete the acquisition of a new Chinese manufactured workover rig. The Company will make an announcement when this is completed and a delivery date is defined.

M-66 was one of the many wells selected for coiled tubing interventions. The small operational outlay relative to the significant increase achieved in production revenue from this well should not be overlooked.

It is clear that there is a vast amount of oil under the surface in the Muradkhanli field. It should, however, also be underlined that well workovers on old Soviet wells will deliver only progressive production increases as opposed to the exceptional flow rates made possible by successfully drilling new wells. As stated in previous announcements, we intend to begin drilling activities in 2018.

I look forward to our operations in the Zardab field, where some of the Company's most promising wells are located. It is important to note that no significant operations have been performed in this field during the last twenty years. I am confident that the use of a coiled tubing unit, combined with a strengthened operational team, will deliver strong results."

 

For further information, please contact:

Zenith Energy Ltd.

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

  

Abchurch (Financial PR/IR)

Tim Thompson

Telephone: +44 (0) 200 7398 7700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEFEDMFWSEFW
Date   Source Headline
16th Nov 20177:00 amRNSFiling of 2017 Second Quarter Results
8th Nov 20177:00 amRNSExercise of Warrants
2nd Nov 20177:00 amRNSExercise of Warrants
1st Nov 20177:00 amRNSSigning of Commitment Letter for new drilling rig
23rd Oct 20177:00 amRNSExercise of Warrants
20th Oct 20177:00 amRNSZardab Field Operational Update
19th Oct 20177:00 amRNSExercise of Warrants and Appointment of Broker
16th Oct 20172:00 pmRNSDirector/PDMR Shareholding
16th Oct 20177:00 amRNSProduction increased from well C-21 in Azerbaijan
12th Oct 20177:00 amRNSExercise of Warrants
10th Oct 20177:00 amRNSNew perforations increase production from well C21
6th Oct 20177:00 amRNSSuccessful perforation of well C-21 in Azerbaijan
28th Sep 20177:00 amRNSIssue of CEO salary sacrifice shares
27th Sep 20177:00 amRNSInvestor Conference Call
27th Sep 20177:00 amRNSCEO Exercises Stock Options
19th Sep 201711:39 amRNSInvestor Conference Call and New Company Website
11th Sep 20177:00 amRNSZenith issues equity to fund workover rig purchase
7th Sep 20177:00 amRNSSuccessful perforation of well C-26 in Azerbaijan
6th Sep 20177:00 amRNSAzerbaijan Field Rehabilitation Operational Update
30th Aug 20177:00 amRNSDirector/PDMR Shareholding
22nd Aug 201711:43 amRNSDirector/PDMR Shareholding
22nd Aug 20177:00 amRNSZenith completes ESP installation at well M-45
21st Aug 20177:00 amRNSZenith purchases Chinese oilfield equipment
15th Aug 20177:00 amRNSFiling of 2017 First Quarter Results
11th Aug 20177:00 amRNSProduction increased at well M-66 in Azerbaijan
2nd Aug 201711:28 amRNSIssue of Equity
2nd Aug 20177:00 amRNSIssue of Equity
27th Jul 20177:00 amRNSProduction restored at well M-66 in Azerbaijan
24th Jul 20177:00 amRNSAppointment of Non-Executive Director
14th Jul 20177:00 amRNSZenith Issues Equity to Fund Field Development
7th Jul 201712:35 pmRNSDirector/PDMR Shareholding
7th Jul 201711:00 amRNSDirector/PDMR Shareholding
6th Jul 20172:39 pmRNSDirector/PDMR Shareholding
5th Jul 20173:36 pmRNSDirector/PDMR Shareholding
3rd Jul 20177:00 amRNSTeam B strikes success at well M-45
30th Jun 20176:18 pmRNSReserve Update and Exercise of Warrants
28th Jun 20175:03 pmRNSZenith Announces 2017 Annual Consolidated Results
23rd Jun 20177:00 amRNSOperational Update on Wells M-195 and M-45
8th Jun 20177:00 amRNSWorkover rig operated by Team B moves to well M-45
5th Jun 20177:40 amRNSSuccess of sidetrack at well M-195 in Azerbaijan
25th May 20177:00 amRNSIssue of Equity
18th May 20177:00 amRNSAppointment of COO and Grant of Stock Options
11th May 201712:19 pmRNSDirector/PDMR Shareholding
2nd May 20177:00 amRNSTotal Voting Rights
21st Apr 20177:00 amRNSAppointment of new CFO
18th Apr 201712:43 pmRNSDirector/PDMR Shareholding
18th Apr 20177:00 amRNSTeam A Commences Workover Operations
18th Apr 20177:00 amRNSTeam B Commences Sidetrack Operations at M-195
13th Apr 20173:45 pmRNSHolding(s) in Company
12th Apr 20177:00 amRNSOption Agreement and Update on CEO Salary Proposal

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.