The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.10
Bid: 1.00
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.10 (10.00%)
Open: 1.05
High: 1.05
Low: 1.05
Prev. Close: 1.05
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Tailings sampling at Kalengwa

20 Aug 2019 12:42

RNS Number : 6637J
Xtract Resources plc
20 August 2019
 

 

 

For immediate release

20 August 2019

 

Xtract Resources Plc

("Xtract" or the "Company")

Tailings sampling at Kalengwa Copper Project Zambia ("Kalengwa")

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to announce assay results from preliminary sampling of mine tailings at the Kalengwa Copper Project Zambia ("Kalengwa").

 

Highlights

 

·; Preliminary sampling by Xtract within the Kalengwa mine tailings dumps yields an average grade of 1.03% Cu, 4.44ppm Ag

·; Xtract's sampling supports previously reported tailings grades

·; Kalengwa Mine operated in the 1970's and was one of the highest grade copper deposits in Zambia

·; Further systematic sampling planned to more accurately define the tailings resource, while metallurgical recovery test work is under way

 

Colin Bird, Executive Chairman said: "This is a very pleasing result confirming copper grades in tailings over a large sample population, similar to results reported in archive information. We are currently undertaking metallurgical test work aimed at assessing the optimal method of copper recovery through mineral processing, upgrading or separation at site. Work is continuing at Kalengwa to enhance local infrastructure to facilitate the planned operation.

 

We intend in the near term to undertake drilling to assess primary ore potential to the north and south of the former open pit."

 

Sampling programme

Historic mining and processing operations at the high-grade Kalengwa copper mine generated tailings which were contained initially in a tailings storage facility, reportedly 6-8m deep, while later tailings were deposited directly into an adjacent swamp. According to a 2013 report by a previous site operator, Lunga Resources Limited, periods of poor concentrator recovery at the mine resulted in relatively high-grade copper material being sent to tailings.

 

In July 2019 the Company undertook a preliminary confirmatory sampling programme along three hand-dug trenches across the tailings dumps. Two trenches were opened within the main tailings facility, while the third was within the swamp area, for a total of 420m. Trench depths ranged from 1.0m to 3.5m. 93 samples were collected, approximately every 5m along the trenches, by sampling vertical channels from top to bottom at each location. The sampling was planned to represent average sample values over a period of time during the historic mining operation. Sample weight was generally 2-3kg.

 

All samples were submitted for analysis to the SGS Kalulushi geochemical laboratory in Zambia. The laboratory is accredited to ISO/IEC 17025 standard for copper analysis.

 

Analytical results received for copper and silver yielded an average grade of 1.03% Cu, 4.44ppm Ag for all samples, with copper values ranging from 0.59% to 2.48%. Average grades were consistent through all three trenches although higher grade zones were delineated within each trench. Encouragingly, results overall support the copper grades reported in the 2013 resource estimate.

 

Further systematic sampling will be required to more accurately define the tailings resource, while test work has already commenced to define the optimum copper/silver recovery route for a new processing operation.

 

There is a historic tailings resource, which was reported in 2013 but is not compliant with a recognised standard and which has not been subsequently updated or verified ("Non-JORC compliant Resource"), of  approximately 2Mt averaging 1.015% Cu, giving total copper content of 20,300 tonnes, with some by-product silver (Source: Lunga Resources Limited, Kalengwa-Jikambo Summary Report, 2013).

 

Kalengwa Project

Kalengwa is located in the North-western province of Zambia 800 km north-west of Lusaka and 400 km south-west of Kitwe. Xtract's partner, KPZ, has been awarded a large-scale exploration permit 24401-HQ-LEL, which was issued on 2 April 2019 and is valid for an initial period of 4 years.

 

The very high-grade Kalengwa Copper Mine was owned and managed by Roan Consolidated Mines Ltd. from 1970 to 1982. Total production of 1.9 Mt of 9.44% Cu and 50 g/t Ag was achieved from open pit mining, resulting in circa 15,000 tonnes of copper production per annum over 12 years.

 

On 15 July 2019 the Company announced that it had concluded a Memorandum of Agreement ("Agreement") with KPZ International Ltd. ("KPZ") for Xtract to act as contractor for the Kalengwa Processing project on the large-scale exploration license number 24401-HQ-LEL ("Licence") located in the Central part of The Republic of Zambia ("Kalengwa Project").

 

Further details are available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation No. 596/2014 on market abuse. The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Colin Rowbury 

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

Qualified Person:

Geological information in this announcement relating to the licence area has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and a qualified person under the AIM Rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"Ag"

Silver

 

"Cu"

Copper

 

"g/t"

gram per metric tonne

 

"grade"

 

 

relative quantity or the percentage of ore mineral or metal content in an ore body 

 

"ppm"

Parts per million (the same as grams per tonne g/t).

 

"tailings"

Reject products from a mineral treatment plant

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLPMMBTMBJTBLL
Date   Source Headline
28th Sep 20217:00 amRNSBushranger Assay Results and Drilling Update
22nd Sep 20217:00 amRNSFurther Bushranger Drilling Programme Update
20th Sep 20213:32 pmRNSEureka Phase 2 Drilling Final Assay Results
14th Sep 202111:43 amRNSFurther Drilling Progress Update at Bushranger
14th Sep 20217:00 amRNSEureka Copper Project - Phase 2 drilling update
2nd Sep 20211:22 pmRNSFurther drilling progress update at Bushranger
23rd Aug 20212:59 pmRNSDirector/PDMR Shareholding
20th Aug 202110:55 amRNSDirectorate Change
19th Aug 202112:49 pmRNSFurther drilling progress update at Bushranger
12th Aug 20217:00 amRNSBushranger drilling update and licence renewal
4th Aug 20212:11 pmRNSDirectorate Change
2nd Aug 20219:00 amRNSBushranger phase two drilling update
29th Jul 202111:39 amRNSPhase Two Drilling Update at Bushranger
26th Jul 202110:30 amRNSBushranger conceptual open pit mining study
16th Jul 202111:47 amRNSPhase two drilling commences at Bushranger
13th Jul 20217:00 amRNSBushranger Project Footrot Prospect Update
12th Jul 20217:00 amRNSBushranger Project Phase Two Drill Planning
2nd Jul 20213:02 pmRNSManica alluvial gold & corporate update
30th Jun 20215:50 pmRNSTotal Voting Rights
28th Jun 202111:06 amRNSFinal Results
22nd Jun 20212:35 pmRNSBushranger Copper-Gold Project Drill Assay Results
21st Jun 20216:15 pmRNSExercise of warrants
1st Jun 20217:00 amRNSTotal Voting Rights
26th May 20217:00 amRNSBushranger Project - Further Drill Assay Results
21st May 20214:15 pmRNSExercise of warrants
17th May 20217:00 amRNSIP Survey Initial Results at Racecourse Prospect
5th May 20217:00 amRNSEureka Copper Project - Phase 2 drilling update
19th Apr 20213:07 pmRNSDirector/PDMR Shareholding
19th Apr 20217:00 amRNSPlacing to fund Bushranger phase 2 drilling
6th Apr 202111:37 amRNSCompletion of phase one drilling at Bushranger
31st Mar 20217:00 amRNSGeophysical surveying at Bushranger
29th Mar 20219:54 amRNSReconnaissance Drilling Results Kalengwa
26th Mar 20214:59 pmRNSManica Alluvial Gold & Corporate Update
24th Mar 20212:48 pmRNSDrilling Update Bushranger Project
23rd Mar 202110:56 amRNSDrilling Update Bushranger Project
19th Mar 20217:00 amRNSFirst drill assay results - Bushranger Project
17th Mar 20219:27 amRNSIssue of Equity
11th Mar 202112:47 pmRNSBushranger Project Drill Progress Update
4th Mar 20214:30 pmRNSIssue of Equity
3rd Mar 20219:05 amRNSSecond Price Monitoring Extn
3rd Mar 20219:00 amRNSPrice Monitoring Extension
2nd Mar 20212:06 pmRNSSecond Price Monitoring Extn
2nd Mar 20212:00 pmRNSPrice Monitoring Extension
1st Mar 20215:30 pmRNSTotal Voting Rights
1st Mar 20215:21 pmRNSBushranger Project Further Drilling Update
25th Feb 20212:06 pmRNSSecond Price Monitoring Extn
25th Feb 20212:01 pmRNSPrice Monitoring Extension
25th Feb 20219:55 amRNSDirector/PDMR Shareholding
24th Feb 20214:34 pmRNSAward of Share Options
23rd Feb 20214:45 pmRNSBushranger Project completion of third drill hole

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.