We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushranger Project completion of third drill hole

23 Feb 2021 16:45

RNS Number : 0930Q
Xtract Resources plc
23 February 2021
 

 

For immediate release

23 February 2021

 

Xtract Resources Plc

("Xtract" or the "Company")

Bushranger Copper/ Gold Project - Completion of Third Hole of Drilling Programme

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to provide information on completion of the third hole of the Phase One diamond drilling programme at the Racecourse Mineral Resource on the Bushranger porphyry copper-gold exploration project located in the Lachlan Fold Belt ("LFB"), New South Wales, Australia.

 

Highlights

 

· Angled hole BRDD-21-003, the third hole of the planned drilling programme, was completed at 975.5m, having drilled through the altered and mineralised porphyry system from 240m to the base of hole.

· Chalcopyrite copper mineralisation was first observed at 119m and became more persistent from 240m, with the best mineralised interval coinciding with the central alteration zone over a 227m length from 598m to 825m.

· The core will now be logged, split and sampled in preparation for laboratory analysis for copper, gold and other elements.

· The drill rig will be moved to drill the fourth hole of the programme to test the deposit further to the west and down-plunge.

 

Colin Bird, Executive Chairman said: "We are very pleased with the most recent hole and are gaining considerable insight into the geometry and extent of the mineralised system at the Racecourse deposit. The copper-bearing interval in this hole was considerably longer than anticipated, suggesting the possibility that the deposit may be significantly larger than first thought. We await assay results and, in the meantime, the drill rig will be moved to drill the fourth hole of the programme to the west and down-plunge of the previous holes."

 

 

Drilling Summary

Hole BRDD-21-003, the third hole of the Phase One Drilling Programme at the Racecourse Mineral Resource on the Bushranger Project, was drilled to test the width and grade of the porphyry mineralisation higher in the deposit than the previous two holes in order to assist in defining the 3-dimensional shape and orientation of the porphyry system. The hole was drilled at -60 degrees towards the north-northwest to a finishing depth of 975.5m.

 

A summary log of the hole is as follows:

 

0 - 119m Unaltered and unmineralised andesitic to basic volcanics interlayered with andesitic sandstone and siltstone

119 - 123m Shear/Breccia zone with quartz-pyrite alteration and minor sphalerite and chalcopyrite

123 - 188m Unaltered volcanics

188 - 198m Quartz-pyrite-pyrrhotite alteration zone with minor chalcopyrite

198 - 240m Unaltered volcanics

240 - 495m Volcanic rocks - outer alteration zone of porphyry copper system with pyrite and lesser chalcopyrite-sphalerite mineralisation as veinlets and stringers

495 - 570m Intermediate volcanic alteration zone with pyrite-pyrrhotite-chalcopyrite both disseminated and hosted in veinlets/stringers

570 - 598m Porphyritic intrusion - pyrite-pyrrhotite-chalcopyrite both disseminated and hosted in veinlets/stringers

598 - 825m Central volcanic (potassic) alteration zone with pyrite-pyrrhotite and stronger chalcopyrite mineralisation, both disseminated and hosted in veinlets/stringers

825 - 890m Intermediate to outer volcanic alteration zone with continuing pyrite-pyrrhotite-chalcopyrite, similar in style to the earlier zones

890 - 975.5m Outer porphyry alteration zone. Continuing pyrite-pyrrhotite-chalcopyrite, both disseminated and hosted in veinlets/stringers. Sphalerite-galena occurs in places, also hosted in veinlets/stringers. Mineralisation diminishes towards the base of the hole

 

End of hole at 975.5m

 

 

Further information is available from the Company's website which details the Company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation No. 596/2014 on market abuse. The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"albite"

A plagioclase felspar mineral with less than 10% anorthite content

"alteration zone"

 

A zone exhibiting change in mineralogical composition of a rock commonly brought about by reactions with hydrothermal solutions

"andesitic"

 

Of an igneous rock with 52% to 66% silica

"Au"

Gold

 

"biotite"

 

A brown-coloured iron rich mica

"breccia"

 

Rock fragmented into angular components

"chalcopyrite"

A copper-iron sulphide mineral, CuFeS2, often found in copper ores

"Cu"

Copper

 

"disseminated"

Mineralization distributed throughout a rock

"exploration"

Method by which ore deposits are evaluated

 

 

"galena"

 

Lead sulphide mineral, PbS

"mineralisation"

Process of formation and concentration of elements and their chemical compounds within a mass or body of rock

"porphyry"

A deposit of disseminated copper minerals in or around a large body of intrusive rock

 

"pyrite"

 

Iron sulphide mineral, FeS2

"pyrrhotite"

 

An iron sulphide mineral, Fe1-XS, often magnetic

"quartz"

 

A mineral composed of silicon dioxide, SiO2

"sphalerite"

 

Zinc sulphide mineral, ZnS

"stringer"

A narrow vein or irregular filament of mineral traversing rock mass of different composition

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCEAKADAADFEFA
Date   Source Headline
3rd Apr 20241:00 pmRNSZambian Exploration Licence Joint Venture
23rd Feb 20249:00 amRNSCompletion of Disposal of Manica Gold Project
16th Feb 20249:05 amRNSDisposal of Manica Gold Project
13th Feb 20241:15 pmRNSResult of Meeting
8th Feb 20247:00 amRNSUpdate on Zambian Copper Joint Venture & Strategy
24th Jan 202411:00 amRNSProposed disposal of Manica Gold Project
6th Nov 202311:30 amRNSBushranger pit optimisation & financial study
23rd Oct 20231:32 pmRNSManica Q2 2023 Gold Production Update
29th Sep 202311:10 amRNSHalf-year Report
24th Aug 20239:24 amRNSZambian exploration licences joint venture
28th Jul 20236:00 pmRNSResult of AGM
20th Jul 20239:05 amRNSBushranger Pre-Concentration Test Results
6th Jul 20237:00 amRNSManica Q1 2023 Gold Production Update
5th Jul 202310:28 amRNSNotice of AGM
29th Jun 20234:16 pmRNSFinal Results
20th Jun 202312:55 pmRNSAccounts and Annual General Meeting update
6th Apr 20237:00 amRNSFourth quarter 2022 production update
30th Mar 20237:00 amRNSChange of auditor
7th Mar 20234:35 pmRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSUpdate on Open Pit Mining Study for Bushranger
26th Jan 20237:00 amRNSKakuyu Copper Project Zambia update
23rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20234:35 pmRNSPrice Monitoring Extension
13th Jan 20239:44 amRNSDirector/PDMR Shareholding
9th Jan 20231:25 pmRNSThird quarter 2022 production update
19th Dec 202211:42 amRNSAscot Prospect Maiden Mineral Resource
15th Dec 20223:53 pmRNSKakuyu copper project Zambia
8th Dec 20224:08 pmRNSHolding(s) in Company
5th Dec 202210:32 amRNSTotal Voting Rights
23rd Nov 202211:05 amRNSSecond Price Monitoring Extn
23rd Nov 202211:00 amRNSPrice Monitoring Extension
23rd Nov 20227:00 amRNSRacecourse Prospect Updated Mineral Resource
22nd Nov 202212:21 pmRNSApplication update
4th Nov 202210:43 amRNSAward of share options and settlement shares
6th Oct 202211:00 amRNSAscot Prospect final assay results
30th Sep 202210:52 amRNSHalf-year Report
30th Sep 20227:00 amRNSProduction update
24th Aug 202210:20 amRNSResult of AGM
15th Aug 20221:05 pmRNSBushranger results of metallurgical test work
8th Aug 20224:40 pmRNSSecond Price Monitoring Extn
8th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20222:06 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20229:13 amRNSBushranger completion of phase two drilling
29th Jul 202211:37 amRNSNotice of AGM
27th Jul 202212:14 pmRNSBushranger assay results and drilling update
21st Jul 20227:00 amRNSFair Bride Update
7th Jul 202212:18 pmRNSBushranger assay results and drilling update
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.