9 Mar 2010 07:00

RNS Number : 2662I
Victoria Oil & Gas PLC
09 March 2010
 



9 March 2010

 

Victoria Oil & Gas Plc

 

("VOG" or the "Company")

 

Test results from Well La-105 at Logbaba Gas and Condensate Project, Cameroon

 

·; Well La-105 tests at rates in excess of 55 million cubic feet of natural gas and 1,000 barrels of condensate per day (together approximately 10,000 barrels of oil equivalent per day) between depths of 7,005 - 8,500 feet from Lower Logbaba and Upper Logbaba D sands

·; Production rates from these sands confirmed as being sufficient to satisfy industrial demand in Douala with Upper Logbaba A - C sands yet to be tested

·; Reassessment of independent reserve estimates for the field expected in Q2 2010

·; Exploration permit for Logbaba extended for a further six months until 20 August 2010

 

Victoria Oil & Gas Plc, (AIM: VOG), the oil and gas exploration and development company with assets in Cameroon and the FSU, is pleased to announce preliminary results from testing operations at Well La-105 at its Logbaba gas and condensate project ("Logbaba") in Douala, Cameroon.

 

Well La-105, the first well drilled by VOG at Logbaba, was completed to a depth of 8,700 feet in early January. Commencing on 22 February, multiple pay zones were tested over a period of two weeks at depths between 7,005 - 8,500 feet. Over the testing period, various zones of La-105 flowed at rates between 11 - 56 million standard cubic feet per day (MMscf/d) of natural gas and 210 - 1,000 barrels per day of condensate. Flowing wellhead pressures varied between 2,750 - 4,552 psi. The theoretical Absolute Open Flow (AOF) capacity for the well is 90 MMscf/d. The gas is sweet, with a high calorific value and the condensate has an API gravity of 47 degrees.

 

The test covered horizons of the Lower Logbaba formation, which had not been tested before, and the Upper Logbaba D sands. The Upper Logbaba A through C sands, although indicated as the best quality hydrocarbon-bearing sands encountered in the well logs, were not tested as the well indicated more than sufficient production capacity to meet initial gas demand of 8 MMscf/d. The Upper Logbaba A - C sands will be perforated and added to the completion interval when required for production.

 

Analysis of the pressure transient and production log data is underway and fluid pressure-volume-temperature (PVT) samples taken at the test separator are being sent to the laboratory for further study. When the Company has completed its full interpretation of the test results, including those from well La-106, and integrated the results of the passive seismic spectroscopy survey conducted last year with the new well data and the limited 2D reflection seismic shot over the field by Elf, it will pass its findings over to independent reserve auditors for a reassessment of the 104 billion cubic feet proven plus probable reserves estimate made in 2008. Completion of the VOG interpretation is anticipated by early Q2 2010, with the independent review estimated to take a further 4 - 6 weeks.

 

Chief Operating Officer Radwan Hadi said, "La-105 has much greater deliverability than we anticipated when compared to the previous Elf wells. Part of the reason for this is that we are using far more effective logging and completion technology than was available in the 1950s. There also appears to be additional productive potential in the well that could be realised by hydraulic fracture stimulation of some of the lower quality reservoir sands. We will need to acquire more data to allow us to design and implement a stimulation programme, but in the longer term this could add significantly to the Logbaba reserves."

 

An extension to the current Logbaba exploration permit has been granted by the Cameroon Ministry of Industry, Mines and Technological Development until 20 August 2010. This extension will allow the Company to complete the drilling and testing of well La-106 and submit the full field development programme.

 

Chairman Kevin Foo said, "We are witnessing the creation of an important gas utility business in Cameroon. The well test results have greatly exceeded our expectations for La-105. Our first well is more than capable of satisfying the initial industrial demand in Douala of 8 MMscf/d, for which we have already signed in-principle off take agreements at an initial price of $16 per thousand cubic feet. This has been achieved without having to open up the more prospective upper sands."

 

 

Victoria Oil & Gas Plc - Tel: +44 (0) 20 7921 8820

George Donne / Kevin Foo

 

Strand Hanson Limited - Tel: +44 (0) 20 7409 3494

Simon Raggett / Angela Peace

 

Fox-Davies Capital - Tel: +44 (0) 20 7936 5220

Daniel Fox-Davies / Oliver Stansfield

 

Conduit PR - Tel: +44 (0) 20 7429 6611

Jonathan Charles / Ed Portman

 

The information in this release has been reviewed by Radwan Hadi, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies. Mr. Hadi, Deputy Managing Director of Blackwatch Petroleum Services Limited and Chief Operating Officer of VOG, is a petroleum/reservoir engineer with over 30 years experience in oil and gas exploration and production.

 

Background Information on Victoria Oil & Gas Plc:

 

Victoria Oil & Gas is an independent oil and gas exploration and production company with projects in Africa and the FSU. The Company's principal assets are the Logbaba gas and condensate project in Cameroon and the West Medvezhye gas field in Siberia, Russia. Logbaba is located in Douala, the economic capital of Cameroon. The field was discovered in the 1950s and all four exploration wells encountered gas. VOG has signed in-principal agreements with industrial customers in Douala for around 8 MMscf/d of natural gas at a price of US$16 per thousand cubic feet.

 

West Medvezhye is situated in the prolific Yamal-Nenetsk hydrocarbon region in Siberia. An independent reserve audit estimated prospective resources for the field of over 1.1 billion barrels of oil equivalent.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJPMPTMBMMBFM
Date   Source Headline
18th Dec 200610:13 amRNSHolding(s) in Company
13th Dec 20063:22 pmRNSTotal Voting Rights
12th Dec 20061:51 pmRNSHolding(s) in Company
12th Dec 20061:49 pmRNSHolding(s) in Company
7th Dec 20067:01 amRNSListing/Director Shareholding
4th Dec 20067:01 amRNSDrilling Report
29th Nov 20064:16 pmRNSNotice of AGM - replacement
29th Nov 20067:01 amRNSNotice of AGM
23rd Nov 200612:14 pmRNSFinal Results
6th Nov 20067:01 amRNSHolding(s) in Company
24th Oct 200612:31 pmRNSHolding(s) in Company
19th Oct 200612:57 pmRNSHolding(s) in Company
18th Oct 20067:01 amRNSIssue of Equity
12th Oct 20067:01 amRNSDrilling Report
4th Oct 20067:20 amRNSDrilling Report
15th Sep 20067:00 amRNSDrilling Report
13th Sep 20068:53 amRNSFramework Agreement
7th Sep 20063:53 pmRNSStmnt re Share Price Movement
4th Aug 200612:50 pmRNSAdditional Listing
24th Jul 20069:42 amRNSDrilling Report
3rd Jul 20061:56 pmRNSHolding(s) in Company
3rd Jul 200611:02 amRNSHolding(s) in Company
3rd Jul 200610:56 amRNSHolding(s) in Company
29th Jun 20067:55 amRNSDrilling Report
26th Jun 20061:30 pmRNSHolding(s) in Company
21st Jun 20062:40 pmRNSHolding(s) in Company
13th Jun 20061:25 pmRNSHolding(s) in Company
6th Jun 200610:16 amRNSHolding(s) in Company
31st May 20067:01 amRNSProject Update
15th May 20067:02 amRNSDrilling Report
4th May 20067:01 amRNSAppointment of Joint Broker
27th Apr 200611:33 amRNSHolding(s) in Company
27th Apr 20067:02 amRNSChange of Adviser
13th Apr 20069:15 amRNSHolding(s) in Company
6th Apr 20062:01 pmRNSResult of EGM
27th Mar 200612:24 pmRNSDevelopment Update
13th Mar 20067:01 amRNSExtraordinary General Meeting
8th Mar 20067:02 amRNSKemerkol Update
6th Mar 20067:01 amRNSListing/Director Shareholding
24th Feb 200610:56 amRNSInterim Results
9th Feb 200611:29 amRNSAdditional Listing
31st Jan 20061:12 pmRNSHolding(s) in Company
25th Jan 20068:00 amRNSAdditional Listing
25th Jan 20067:01 amRNSUpdated Feasibility Study
29th Dec 20057:00 amRNSIssue of Equity
22nd Dec 20057:01 amRNSAcqusition Update
19th Dec 20057:00 amRNSIssue of Equity
9th Dec 20051:48 pmRNSUpdate re financing
2nd Dec 20051:34 pmRNSStatement re. Press Comment
1st Dec 20057:01 amRNSProject Portfolio Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.