Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Test Results

9 Mar 2010 07:00

RNS Number : 2662I
Victoria Oil & Gas PLC
09 March 2010
 



9 March 2010

 

Victoria Oil & Gas Plc

 

("VOG" or the "Company")

 

Test results from Well La-105 at Logbaba Gas and Condensate Project, Cameroon

 

·; Well La-105 tests at rates in excess of 55 million cubic feet of natural gas and 1,000 barrels of condensate per day (together approximately 10,000 barrels of oil equivalent per day) between depths of 7,005 - 8,500 feet from Lower Logbaba and Upper Logbaba D sands

·; Production rates from these sands confirmed as being sufficient to satisfy industrial demand in Douala with Upper Logbaba A - C sands yet to be tested

·; Reassessment of independent reserve estimates for the field expected in Q2 2010

·; Exploration permit for Logbaba extended for a further six months until 20 August 2010

 

Victoria Oil & Gas Plc, (AIM: VOG), the oil and gas exploration and development company with assets in Cameroon and the FSU, is pleased to announce preliminary results from testing operations at Well La-105 at its Logbaba gas and condensate project ("Logbaba") in Douala, Cameroon.

 

Well La-105, the first well drilled by VOG at Logbaba, was completed to a depth of 8,700 feet in early January. Commencing on 22 February, multiple pay zones were tested over a period of two weeks at depths between 7,005 - 8,500 feet. Over the testing period, various zones of La-105 flowed at rates between 11 - 56 million standard cubic feet per day (MMscf/d) of natural gas and 210 - 1,000 barrels per day of condensate. Flowing wellhead pressures varied between 2,750 - 4,552 psi. The theoretical Absolute Open Flow (AOF) capacity for the well is 90 MMscf/d. The gas is sweet, with a high calorific value and the condensate has an API gravity of 47 degrees.

 

The test covered horizons of the Lower Logbaba formation, which had not been tested before, and the Upper Logbaba D sands. The Upper Logbaba A through C sands, although indicated as the best quality hydrocarbon-bearing sands encountered in the well logs, were not tested as the well indicated more than sufficient production capacity to meet initial gas demand of 8 MMscf/d. The Upper Logbaba A - C sands will be perforated and added to the completion interval when required for production.

 

Analysis of the pressure transient and production log data is underway and fluid pressure-volume-temperature (PVT) samples taken at the test separator are being sent to the laboratory for further study. When the Company has completed its full interpretation of the test results, including those from well La-106, and integrated the results of the passive seismic spectroscopy survey conducted last year with the new well data and the limited 2D reflection seismic shot over the field by Elf, it will pass its findings over to independent reserve auditors for a reassessment of the 104 billion cubic feet proven plus probable reserves estimate made in 2008. Completion of the VOG interpretation is anticipated by early Q2 2010, with the independent review estimated to take a further 4 - 6 weeks.

 

Chief Operating Officer Radwan Hadi said, "La-105 has much greater deliverability than we anticipated when compared to the previous Elf wells. Part of the reason for this is that we are using far more effective logging and completion technology than was available in the 1950s. There also appears to be additional productive potential in the well that could be realised by hydraulic fracture stimulation of some of the lower quality reservoir sands. We will need to acquire more data to allow us to design and implement a stimulation programme, but in the longer term this could add significantly to the Logbaba reserves."

 

An extension to the current Logbaba exploration permit has been granted by the Cameroon Ministry of Industry, Mines and Technological Development until 20 August 2010. This extension will allow the Company to complete the drilling and testing of well La-106 and submit the full field development programme.

 

Chairman Kevin Foo said, "We are witnessing the creation of an important gas utility business in Cameroon. The well test results have greatly exceeded our expectations for La-105. Our first well is more than capable of satisfying the initial industrial demand in Douala of 8 MMscf/d, for which we have already signed in-principle off take agreements at an initial price of $16 per thousand cubic feet. This has been achieved without having to open up the more prospective upper sands."

 

 

Victoria Oil & Gas Plc - Tel: +44 (0) 20 7921 8820

George Donne / Kevin Foo

 

Strand Hanson Limited - Tel: +44 (0) 20 7409 3494

Simon Raggett / Angela Peace

 

Fox-Davies Capital - Tel: +44 (0) 20 7936 5220

Daniel Fox-Davies / Oliver Stansfield

 

Conduit PR - Tel: +44 (0) 20 7429 6611

Jonathan Charles / Ed Portman

 

The information in this release has been reviewed by Radwan Hadi, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies. Mr. Hadi, Deputy Managing Director of Blackwatch Petroleum Services Limited and Chief Operating Officer of VOG, is a petroleum/reservoir engineer with over 30 years experience in oil and gas exploration and production.

 

Background Information on Victoria Oil & Gas Plc:

 

Victoria Oil & Gas is an independent oil and gas exploration and production company with projects in Africa and the FSU. The Company's principal assets are the Logbaba gas and condensate project in Cameroon and the West Medvezhye gas field in Siberia, Russia. Logbaba is located in Douala, the economic capital of Cameroon. The field was discovered in the 1950s and all four exploration wells encountered gas. VOG has signed in-principal agreements with industrial customers in Douala for around 8 MMscf/d of natural gas at a price of US$16 per thousand cubic feet.

 

West Medvezhye is situated in the prolific Yamal-Nenetsk hydrocarbon region in Siberia. An independent reserve audit estimated prospective resources for the field of over 1.1 billion barrels of oil equivalent.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJPMPTMBMMBFM
Date   Source Headline
28th Oct 20084:37 pmRNSPrice Monitoring Extension
28th Oct 20087:00 amRNSOption re Falcon
24th Oct 20084:50 pmRNSSecond Price Monitoring Extn
24th Oct 20084:38 pmRNSPrice Monitoring Extension
22nd Oct 20084:44 pmRNSSecond Price Monitoring Extn
22nd Oct 20084:37 pmRNSPrice Monitoring Extension
17th Oct 20081:10 pmRNSMerger Update
17th Oct 20081:00 pmRNSFurther re Possible Offer
14th Oct 20084:53 pmRNSSecond Price Monitoring Extn
14th Oct 20084:40 pmRNSPrice Monitoring Extension
10th Oct 20084:45 pmRNSSecond Price Monitoring Extn
10th Oct 20084:38 pmRNSPrice Monitoring Extension
9th Oct 20084:45 pmRNSSecond Price Monitoring Extn
9th Oct 20084:38 pmRNSPrice Monitoring Extension
8th Oct 20084:42 pmRNSSecond Price Monitoring Extn
8th Oct 20084:35 pmRNSPrice Monitoring Extension
8th Oct 200811:26 amRNSAdditional Listing
7th Oct 20084:43 pmRNSSecond Price Monitoring Extn
7th Oct 20084:40 pmRNSPrice Monitoring Extension
6th Oct 20084:47 pmRNSSecond Price Monitoring Extn
6th Oct 20084:39 pmRNSPrice Monitoring Extension
3rd Oct 20084:43 pmRNSSecond Price Monitoring Extn
3rd Oct 20084:37 pmRNSPrice Monitoring Extension
2nd Oct 20084:42 pmRNSSecond Price Monitoring Extn
2nd Oct 20084:38 pmRNSPrice Monitoring Extension
1st Oct 200810:09 amRNSUpdate on Kemerkol Legal Case
24th Sep 20084:42 pmRNSSecond Price Monitoring Extn
24th Sep 20084:35 pmRNSPrice Monitoring Extension
24th Sep 200812:59 pmRNSStatement re Possible Offer
23rd Sep 20084:41 pmRNSSecond Price Monitoring Extn
23rd Sep 20084:35 pmRNSPrice Monitoring Extension
23rd Sep 200812:05 pmRNSStatement re Possible Offer
22nd Sep 20084:37 pmRNSPrice Monitoring Extension
22nd Sep 20087:00 amRNSLoan Facility to Bramlin Ltd
22nd Sep 20087:00 amRNSLoan Facility
19th Sep 20084:48 pmRNSSecond Price Monitoring Extn
19th Sep 20084:37 pmRNSPrice Monitoring Extension
18th Sep 20084:40 pmRNSSecond Price Monitoring Extn
18th Sep 20084:35 pmRNSPrice Monitoring Extension
7th Aug 20084:41 pmRNSSecond Price Monitoring Extn
7th Aug 20084:35 pmRNSPrice Monitoring Extension
1st Jul 20087:00 amRNSUpdate on Projects in Russia
2nd Jun 20087:00 amRNSChange of Adviser
25th Apr 20087:01 amRNSVictoria Energy Central Asia
31st Mar 20088:43 amRNSDrilling Report
25th Mar 20081:33 pmRNSHolding(s) in Company
13th Mar 200810:06 amRNSAdditional Listing
28th Feb 20087:01 amRNSInterim Results
12th Feb 200811:36 amRNSHolding(s) in Company
8th Feb 200812:32 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.