Less Ads, More Data, More Tools Register for FREE

Pin to quick picksURU Metals Limited Regulatory News (URU)

Share Price Information for URU Metals Limited (URU)

Share Price is delayed by 15 minutes
Get Live Data
5.85    0.00 (0.00%)
Bid:
5.70
Ask:
6.00
Spread: 0.30 (5.263%)
Market Cap: £5.67m
URU Live PriceLast checked at - London Stock Exchange

Intraday URU Metals Limited Share Chart

Drilling Update

29 Jan 2008 07:00

Niger Uranium Limited29 January 2008 For Immediate Release 29 January 2008 Niger Uranium Limited ("Niger Uranium" or "the Company") 2008 Exploration Drilling Campaign has commenced on Niger Licenses Results of surface rock-chip samples - U3O8 grades of up to 0.98% €2,500 metre Phase 1 drilling and trenching programme commenced on 18 (eighteen) targets within the Irhazer and In Gall licenses. Drilling to be completed by March 2008. •Drilling initially focusing on the more southerly targets where a number of surface grab samples and geological mapping indicate strike extensive stratiform mineralization, exposed at surface. The target is a Large Open-Pittable resource. U3O8 by XRF for 13 surface samples from these targets range from 45 to 880 ppm (0.088 %). •Groundwork on the northerly, structurally controlled targets is underway. Mapping, ground magnetics and track-etch radon detection work will commence in early February. U3O8 by XRF for 13 surface samples from these targets range from 45 to 9,829 ppm (0.98 %) - multi-element analyses on these samples revealed up to 1% Copper. These results confirm the highly prospective character of these targets. •A significant dataset was received from Areva, containing large amounts of historic data for Niger Uranium license areas and surrounding areas. This data is currently being catalogued and interpreted and will assist with target generation and help fast-track the exploration programme. •Work on the southerly targets at Irhazer and In Gall is unaffected by the localized security problems experienced elsewhere in northern Niger but the situation is being carefully monitored. An independent risk assessment is underway. Niger Uranium has commenced a preliminary 2,500 metre drilling programme on itstargets within the Irhazer and In Gall licenses in Niger. 352 metres of tri-conedrilling have been completed to date. Radiometric probing is underway. Phase 2which currently consists of 7,500 drilled metres will commence April 2008. During mapping carried out late 2007 to assist with borehole planning, twentysix surface samples were collected. These samples were analysed at SGS Lakefieldof Johannesburg in early January 2008 and the results for U3O8 range from 45 to9,829 ppm (0.98 %). Results for all samples are set out in Table 1 below. Thelocation of the grab samples in relation to the Niger Uranium licenses anduranium deposits in the area is shown in Figure 1. Table 1: SGS Lakefield results for rock-ship samples Target SampleID utm easting utm northing U3O8 (ppm) Cu (ppm) 17 ING-H17/01 282545 1856276 587 60 17 ING-H17/02 284066 1855084 191 70 17 ING-H17/03 284066 1855084 45 10 12 ING-H12/04 306513 1853946 267 210 12 ING-H12/05 306552 1853892 612 70 18 ING-H18/06 314842 1886049 4967 1590 18 ING-H18/07 314844 1886043 1524 810 10 ING-H10/08 308636 1884910 47 50 10 ING-H10/09 308567 1885074 399 150 10 ING-H10/10 308482 1884963 567 310 10 ING-H10/11 308496 1884951 250 110 9 ING-H09/12 294459 1881465 9829 > 10000 13 ING-H13/13 275978 1870274 255 40 13 ING-H13/14 275931 1870270 166 160 13 ING-H13/15 275904 1870211 194 20 13 ING-H13/16 275853 1870239 137 30 13 ING-H13/17 275821 1870221 107 30 13 ING-H13/18 275757 1870222 123 30 13 ING-H13/19 273208 1871151 880 1370 13 ING-H13/20 271970 1874234 117 530 8 ING-H08/21 281295 1877545 127 60 9 ING-H09/22 294031 1881057 128 750 9 ING-H09/23 294036 1881063 453 480 7 IRZ-H07/24 308753 1921772 191 640 7 IRZ-H07/25 308642 1921683 172 470 7 IRZ-H07/26 308565 1921603 1059 1140 Notes: (i) "UTM" means universal transverse mercator; and (ii) "ppm" means parts per million. Of significant interest are the values of between 117 and 880 ppm U3O8 forsamples from extensive exposed siltstone and sandstone layers at targets 12, 13and 17. The strike length of the mineralized layer at these targets isconsiderable; 20 kilometres at target 17. The company believes there to bepotential for a large, open pittable low grade resource. Systematic drilling andtrenching across the mineralized layer has commenced. Targets 8, 9, 10 and 18 are structurally controlled domes and basinal featuresalong the Teguiddan-Adrar Fault. Grab samples from these targets returned valuesof up 0.98 % U3O8 and up to 1% copper, the reportable limit for the analyticalmethod used. These results emphasize the highly prospective nature of the majorstructures within the license areas. Drilling will commence at these targets inFebruary following drilling of the southern targets 12, 13 and 17. Groundmagnetic surveys and track-etch radon detection work will be used to assist infinal target generation. No drilling has yet commended at the Kamas and Dabala license areas. Qualified Person The information contained in this announcement has been reviewed by Keith Kenyon(MSc. AUS IMM), Geochemical Consultant to Niger Uranium. He is the QualifiedPerson overseeing the geochemical exploration on the In Gall-Irhazer licences.Mr. Kenyon has 36 years experience in gold and uranium exploration andgeochemistry and he is undertaking to act as a Qualified Person for the purposesof this announcement. The chemical analyses were undertaken by SGS Minerals, Southern Africa; 58Melvill Street, Booysens, Johannesburg, 2091, Tel. +27 (0)11 680-3466. This isa properly equipped, fully accredited laboratory undertaking analyses and assaysfor the mining industry. Contacts: Niger Uranium Limited Tel: + 27 82 404 36 37Ian Stalker, Executive Deputy Chairman andChief Executive OfficerBeaumont Cornish Limited Tel: + 44 (0) 20 7628 3396Roland Cornish / Michael CornishHaywood Securities (UK) Limited Tel+ 44 (0) 20 7031 8011Thomas BeattieFinancial Dynamics Tel + (0) 20 7831 3113Ben Brewerton ENDS Figure 1: Location of rock-chip (grab) samples within the In Gall and Irhazerpermits, and surrounding uranium deposits. XRF U3O8values are shown. No grabsamples were collected from Targets 1-6 as these are targets are not exposed atsurface. Paste the following link into your web browser to download the PDF related to this announcement: http://www.rns-pdf.londonstockexchange.com/rns/7173m_-2008-1-28.pdf This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Dec 20157:00 amRNSInterim Results
30th Oct 20155:05 pmRNSPlacing
30th Sep 201512:30 pmRNSFinal Results
11th Sep 20153:02 pmRNSAppointment of adviser and issue of equity
1st Apr 20154:15 pmRNSDirector/PDMR Shareholding
10th Feb 201512:14 pmRNSHolding(s) in Company
28th Jan 20157:00 amRNSUpdate on Narke Project Environmental Study
30th Dec 20146:36 pmRNSHalf Yearly Report
29th Dec 20142:43 pmRNSInterim results date and price movement
15th Oct 20146:29 pmRNSReplacement: Final Results
6th Oct 20145:30 pmRNSDirector Share Purchase
30th Sep 20141:02 pmRNSFinal Results
15th Jul 20147:00 amRNSAppointment of Environmental Consultants at Närke
26th Jun 20147:00 amRNSDirector Shareholding
2nd Jun 20147:00 amRNSSenior management appointment
30th May 20147:00 amRNSApplication for admission and total voting rights
23rd May 20147:00 amRNSGrant of options
22nd May 20147:00 amRNSChange of Adviser
19th May 20145:44 pmRNSHolding(s) in Company
2nd May 20147:00 amRNSPlacing
24th Apr 20147:00 amRNSIssue of Equity
11th Apr 20147:00 amRNSCloses deal on the Zebediela Project
10th Feb 20144:08 pmRNSAppointment of Joint Broker
27th Jan 20148:39 amRNSCompletes Due Diligence on the Zebediela Project
18th Dec 20137:00 amRNSDirectorate Change
11th Dec 20137:00 amRNSEnd of Arbitration at Zebediela Nickel Project
25th Nov 20137:30 amRNSHalf Yearly Report
25th Nov 20137:00 amRNSEnters into agreement to Acquire 100% in SAN
2nd Oct 20137:00 amRNSFirst Analytical Results for Närke
5th Sep 20137:00 amRNSResult of CPR Report for Narke Project
27th Aug 20137:00 amRNSResult of AGM
8th Aug 20137:00 amRNSNotice of AGM
23rd Jul 20137:00 amRNSFinal Results
4th Jul 20137:00 amRNSTotal Voting Rights
26th Jun 20137:00 amRNSURU Files NI 43-101 for its Nueltin Lake Project
11th Jun 20137:00 amRNSShare Issuance Update
23rd May 20137:00 amRNSExpands into Sweden
5th Apr 20137:00 amRNSDisposal of UrAmerica PLC and Appoints Auditors
28th Feb 20132:09 pmRNSGrant of Options
21st Feb 20137:00 amRNSChange of Adviser
6th Feb 201312:51 pmRNSInterview about the Nueltin Lake Project
6th Feb 20137:00 amRNSOption Agreement over Nueltin Lake Project
17th Jan 20134:20 pmRNSChange of Administrative Office & CFO
21st Dec 20123:01 pmRNSHalf Yearly Report
29th Oct 20127:30 amRNSResult of AGM & Change of Adviser
2nd Oct 20127:00 amRNSNotice of AGM
21st Sep 20127:00 amRNSDirectorate Changes
13th Sep 201210:00 amRNSAnnual Financial Report
6th Aug 20127:00 amRNSArbitration Proceedings
31st Jul 20127:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.