Less Ads, More Data, More Tools Register for FREE

Pin to quick picksURU Metals Limited Regulatory News (URU)

Share Price Information for URU Metals Limited (URU)

Share Price is delayed by 15 minutes
Get Live Data
5.85    0.00 (0.00%)
Bid:
5.70
Ask:
6.00
Spread: 0.30 (5.263%)
Market Cap: £5.67m
URU Live PriceLast checked at - London Stock Exchange

Intraday URU Metals Limited Share Chart

Drilling Update

29 Jan 2008 07:00

Niger Uranium Limited29 January 2008 For Immediate Release 29 January 2008 Niger Uranium Limited ("Niger Uranium" or "the Company") 2008 Exploration Drilling Campaign has commenced on Niger Licenses Results of surface rock-chip samples - U3O8 grades of up to 0.98% €2,500 metre Phase 1 drilling and trenching programme commenced on 18 (eighteen) targets within the Irhazer and In Gall licenses. Drilling to be completed by March 2008. •Drilling initially focusing on the more southerly targets where a number of surface grab samples and geological mapping indicate strike extensive stratiform mineralization, exposed at surface. The target is a Large Open-Pittable resource. U3O8 by XRF for 13 surface samples from these targets range from 45 to 880 ppm (0.088 %). •Groundwork on the northerly, structurally controlled targets is underway. Mapping, ground magnetics and track-etch radon detection work will commence in early February. U3O8 by XRF for 13 surface samples from these targets range from 45 to 9,829 ppm (0.98 %) - multi-element analyses on these samples revealed up to 1% Copper. These results confirm the highly prospective character of these targets. •A significant dataset was received from Areva, containing large amounts of historic data for Niger Uranium license areas and surrounding areas. This data is currently being catalogued and interpreted and will assist with target generation and help fast-track the exploration programme. •Work on the southerly targets at Irhazer and In Gall is unaffected by the localized security problems experienced elsewhere in northern Niger but the situation is being carefully monitored. An independent risk assessment is underway. Niger Uranium has commenced a preliminary 2,500 metre drilling programme on itstargets within the Irhazer and In Gall licenses in Niger. 352 metres of tri-conedrilling have been completed to date. Radiometric probing is underway. Phase 2which currently consists of 7,500 drilled metres will commence April 2008. During mapping carried out late 2007 to assist with borehole planning, twentysix surface samples were collected. These samples were analysed at SGS Lakefieldof Johannesburg in early January 2008 and the results for U3O8 range from 45 to9,829 ppm (0.98 %). Results for all samples are set out in Table 1 below. Thelocation of the grab samples in relation to the Niger Uranium licenses anduranium deposits in the area is shown in Figure 1. Table 1: SGS Lakefield results for rock-ship samples Target SampleID utm easting utm northing U3O8 (ppm) Cu (ppm) 17 ING-H17/01 282545 1856276 587 60 17 ING-H17/02 284066 1855084 191 70 17 ING-H17/03 284066 1855084 45 10 12 ING-H12/04 306513 1853946 267 210 12 ING-H12/05 306552 1853892 612 70 18 ING-H18/06 314842 1886049 4967 1590 18 ING-H18/07 314844 1886043 1524 810 10 ING-H10/08 308636 1884910 47 50 10 ING-H10/09 308567 1885074 399 150 10 ING-H10/10 308482 1884963 567 310 10 ING-H10/11 308496 1884951 250 110 9 ING-H09/12 294459 1881465 9829 > 10000 13 ING-H13/13 275978 1870274 255 40 13 ING-H13/14 275931 1870270 166 160 13 ING-H13/15 275904 1870211 194 20 13 ING-H13/16 275853 1870239 137 30 13 ING-H13/17 275821 1870221 107 30 13 ING-H13/18 275757 1870222 123 30 13 ING-H13/19 273208 1871151 880 1370 13 ING-H13/20 271970 1874234 117 530 8 ING-H08/21 281295 1877545 127 60 9 ING-H09/22 294031 1881057 128 750 9 ING-H09/23 294036 1881063 453 480 7 IRZ-H07/24 308753 1921772 191 640 7 IRZ-H07/25 308642 1921683 172 470 7 IRZ-H07/26 308565 1921603 1059 1140 Notes: (i) "UTM" means universal transverse mercator; and (ii) "ppm" means parts per million. Of significant interest are the values of between 117 and 880 ppm U3O8 forsamples from extensive exposed siltstone and sandstone layers at targets 12, 13and 17. The strike length of the mineralized layer at these targets isconsiderable; 20 kilometres at target 17. The company believes there to bepotential for a large, open pittable low grade resource. Systematic drilling andtrenching across the mineralized layer has commenced. Targets 8, 9, 10 and 18 are structurally controlled domes and basinal featuresalong the Teguiddan-Adrar Fault. Grab samples from these targets returned valuesof up 0.98 % U3O8 and up to 1% copper, the reportable limit for the analyticalmethod used. These results emphasize the highly prospective nature of the majorstructures within the license areas. Drilling will commence at these targets inFebruary following drilling of the southern targets 12, 13 and 17. Groundmagnetic surveys and track-etch radon detection work will be used to assist infinal target generation. No drilling has yet commended at the Kamas and Dabala license areas. Qualified Person The information contained in this announcement has been reviewed by Keith Kenyon(MSc. AUS IMM), Geochemical Consultant to Niger Uranium. He is the QualifiedPerson overseeing the geochemical exploration on the In Gall-Irhazer licences.Mr. Kenyon has 36 years experience in gold and uranium exploration andgeochemistry and he is undertaking to act as a Qualified Person for the purposesof this announcement. The chemical analyses were undertaken by SGS Minerals, Southern Africa; 58Melvill Street, Booysens, Johannesburg, 2091, Tel. +27 (0)11 680-3466. This isa properly equipped, fully accredited laboratory undertaking analyses and assaysfor the mining industry. Contacts: Niger Uranium Limited Tel: + 27 82 404 36 37Ian Stalker, Executive Deputy Chairman andChief Executive OfficerBeaumont Cornish Limited Tel: + 44 (0) 20 7628 3396Roland Cornish / Michael CornishHaywood Securities (UK) Limited Tel+ 44 (0) 20 7031 8011Thomas BeattieFinancial Dynamics Tel + (0) 20 7831 3113Ben Brewerton ENDS Figure 1: Location of rock-chip (grab) samples within the In Gall and Irhazerpermits, and surrounding uranium deposits. XRF U3O8values are shown. No grabsamples were collected from Targets 1-6 as these are targets are not exposed atsurface. Paste the following link into your web browser to download the PDF related to this announcement: http://www.rns-pdf.londonstockexchange.com/rns/7173m_-2008-1-28.pdf This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Apr 20224:35 pmRNSPrice Monitoring Extension
12th Apr 20227:00 amRNSDrilling results from ZEB Nickel Corp
8th Apr 20224:40 pmRNSSecond Price Monitoring Extn
8th Apr 20224:36 pmRNSPrice Monitoring Extension
7th Apr 20224:40 pmRNSSecond Price Monitoring Extn
7th Apr 20224:35 pmRNSPrice Monitoring Extension
6th Apr 20224:41 pmRNSSecond Price Monitoring Extn
6th Apr 20224:36 pmRNSPrice Monitoring Extension
16th Mar 202211:05 amRNSSecond Price Monitoring Extn
16th Mar 202211:00 amRNSPrice Monitoring Extension
15th Mar 202211:05 amRNSSecond Price Monitoring Extn
15th Mar 202211:00 amRNSPrice Monitoring Extension
15th Mar 20227:00 amRNSDrilling results from ZEB Nickel Corp
14th Mar 20224:41 pmRNSSecond Price Monitoring Extn
14th Mar 20224:36 pmRNSPrice Monitoring Extension
8th Mar 20222:05 pmRNSSecond Price Monitoring Extn
8th Mar 20222:00 pmRNSPrice Monitoring Extension
7th Mar 202211:06 amRNSSecond Price Monitoring Extn
7th Mar 202211:00 amRNSPrice Monitoring Extension
27th Jan 20227:00 amRNSResults of shareholder analysis
19th Jan 20226:30 pmRNSPCA Dealing & Holdings in the Company
19th Jan 20227:55 amRNSZeb Nickel Corp. announces trading on OTCQB
31st Dec 20217:00 amRNSInterim Results
22nd Dec 20215:11 pmRNSLoan Facility
1st Dec 20213:05 pmRNSPCA Dealing & Holdings in the Company
30th Nov 20217:00 amRNSAppointment to Board of Zeb Nickel Corp
30th Sep 20215:35 pmRNSFinal Results
20th Sep 20217:00 amRNSProspecting Right Application Update
13th Sep 20211:00 pmRNSZeb Nickel Corp to commence drilling at Zebediela
13th Sep 20217:00 amRNSApplication for new Prospecting Right Accepted
10th Sep 20214:40 pmRNSSecond Price Monitoring Extn
10th Sep 20214:35 pmRNSPrice Monitoring Extension
10th Aug 20212:50 pmRNSZEB Nickel Corp. Resumption of trading
3rd Aug 20217:00 amRNSCompletion of Zebediela Nickel Project Disposal
27th Jul 20211:42 pmRNSDisposal of the Company’s Zebediela Nickel Project
8th Jul 20214:56 pmRNSResults of shareholder analysis
27th May 20212:05 pmRNSSecond Price Monitoring Extn
27th May 20212:00 pmRNSPrice Monitoring Extension
26th May 20216:02 pmRNSIncrease and Extension of Convertible Loan Note
13th May 202111:05 amRNSSecond Price Monitoring Extn
13th May 202111:00 amRNSPrice Monitoring Extension
13th May 202110:00 amRNSResponse to Share Price Movement
4th May 20217:00 amRNSExisting Convertible Loan Note Amendment
13th Apr 20211:28 pmRNSResults of shareholder analysis
1st Apr 20214:42 pmRNSResult of AGM
9th Mar 20214:41 pmRNSSecond Price Monitoring Extn
9th Mar 20214:36 pmRNSPrice Monitoring Extension
9th Mar 20212:05 pmRNSSecond Price Monitoring Extn
9th Mar 20212:00 pmRNSPrice Monitoring Extension
3rd Mar 20217:00 amRNSProposed Disposal of Zebediela & Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.