Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.023
Bid: 0.022
Ask: 0.024
Change: -0.0025 (-9.80%)
Spread: 0.002 (9.091%)
Open: 0.0235
High: 0.0235
Low: 0.023
Prev. Close: 0.0255
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lidsey Oil Field Update

2 Jul 2014 14:00

RNS Number : 2355L
UK Oil & Gas Investments PLC
02 July 2014
 



 

For Immediate Release

2 July 2014

 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Lidsey Oil Field Update

 

UK Oil & Gas Investments PLC (AIM: UKOG) announces a 230% increase in oil production from the conventional Lidsey Oil Field ("Lidsey"), near Bognor Regis south of London, from 34 barrels of oil per day ("bopd") in May 2014 to a current rate of 113 bopd of 34 API oil after a successful recompletion programme on the Lidsey-1 well.

 

The operators of Lidsey, Angus Energy Limited ("Angus Energy") have advised that an 80-foot section of the Greater Oolite reservoir was perforated using tubing conveyed (TCP) guns, at 4 perforations per foot, using Paradigm Connect charges between 3,271 feet and 3,351 feet at 16:00 hours on Sunday, 22 June 2014. Of the 80 feet of perforations shot, 19 feet were opening up new reservoir and 61 feet were re-perforations.

 

The Lidsey-1 well was put back to pump at half speed to clean-up the well at 15:30 hours on Wednesday, 25 June 2014. After an initial restricted 5 day clean-up of programme, the Lidsey-1 well produced at an average restricted rate of 47 bopd with the pump jack running at half speed. On 30 June 2014, the pump was increased to full speed resulting in a higher production rate of 113 bopd.

 

David Lenigas, UKOG's Chairman commented:

 

"This is an excellent result for Lidsey. Each phase of well workovers on the Lidsey-1 well has been successful since the workover programmes started on the field at the end of last year. UKOG looks forward to the drilling of the proposed new Lidsey-2 well later this year, which is designed to access the crest of the Greater Oolite reservoir and the majority of Lidsey's Oil in-Place."

 

"UKOG also looks forward to a very active programme over the coming 6 months with our partners Angus Energy here in the UK, especially with the drilling of the Horse Hill-1 well near Gatwick later this month and the drilling of the proposed Brockham side-track well in the same geographical area once final approvals have been granted."

 

 

Lidsey Oil Field (70% owned and operated by Angus Energy):

(UKOG owns 6% of Angus Energy)

 

The Lidsey Oil Field ("Lidsey"), is a long standing producing oil field in the Weald Basin near Bognor Regis, and is held under United Kingdom Production Licence PL 241.

 

Lidsey has a fully permitted and operation 2,000-barrel storage facility and its oil is regularly trucked and sold to the Perenco Oil Refinery.

 

On 13 March 2014, UKOG announced the conclusions of the independent reserve and resource reports ("CPRs") prepared by RPS Energy Consultants Limited ("RPS") for both the Lidsey and Brockham Fields in the Weald Basin, a copy of which is available from the Company's website at www.ukogplc.com

 

Glossary:

API

American Petroleum Institute measure of the gravity of oil

bopd

Barrels of oil per day

 

 

-ENDS-

 

For further information, please contact:

 

UK Oil& Gas Investments PLC

David Lenigas / Donald Strang

Tel: 020 7440 0640

Beaumont Cornish (Nominated Adviser)

Roland Cornish / Michael Cornish

Tel: 020 7628 3396

Hume Capital Securities PLC (Corporate Broker)

David Lawman

Tel: 020 7101 7070

Square 1 Consulting (Public Relations)

David Bick/Mark Longson

 

Tel: 020 7929 5599

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSAFEEFLSESW
Date   Source Headline
28th Apr 20209:00 amRNSPrice Monitoring Extension
28th Apr 20207:00 amRNSOperating Cost Reductions & £1.275m Funding
22nd Apr 202011:54 amRNSLoan Balance Reduction
8th Apr 20204:02 pmRNSHolding(s) in Company
1st Apr 20208:45 amRNSFinal Deferred Consideration Paid to Tellurian
31st Mar 202011:29 amRNSLoan Balance Reduction
23rd Mar 20207:00 amRNSArreton - Planning Application Submitted
20th Mar 202011:06 amRNSSecond Price Monitoring Extn
20th Mar 202011:00 amRNSPrice Monitoring Extension
19th Mar 20204:54 pmRNSLoan Balance Reduction
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:00 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Granted Long-Term Production Consent
12th Mar 20204:44 pmRNSSecond Price Monitoring Extn
12th Mar 20204:37 pmRNSPrice Monitoring Extension
9th Mar 202010:00 amRNSDry Oil Flows to Surface- Water Shut-Off Programme
5th Mar 20207:49 amRNSLoan Balance Reduction
26th Feb 20203:19 pmRNSLoan Balance Reduction
19th Feb 202012:30 pmRNSHH-2z Water Shut Off Intervention Commences
17th Feb 20207:00 amRNSLoan Balance Reduction
12th Feb 202012:57 pmRNSResult of General Meeting & Loan Update
3rd Feb 20204:25 pmRNSLoan Balance Reduction
31st Jan 20204:40 pmRNSSecond Price Monitoring Extn
31st Jan 20204:35 pmRNSPrice Monitoring Extension
28th Jan 20207:00 amRNSHorse Hill & Loxley Update - Notice of GM
13th Jan 20203:25 pmRNSLoan Balance Reduction
7th Jan 202011:09 amRNSHolding(s) in Company
2nd Jan 20203:55 pmRNSIssue of Shares
30th Dec 201912:47 pmRNSLoan Balance Reduction
23rd Dec 20197:00 amRNSHH-1 and HH-2z Extended Well Test Update
2nd Dec 20197:00 amRNSResult of Placing
29th Nov 20193:35 pmRNSLoan Balance Reduction
27th Nov 20197:00 amRNSHH-2z Completed - Horse Hill
22nd Nov 20194:36 pmRNSLoan Balance Reduction
15th Nov 20191:04 pmRNSLoan Balance Reduction
12th Nov 20197:00 amRNSHH-2z Horizontal Drilling Completed
7th Nov 20194:33 pmRNSLoan Balance Reduction
4th Nov 20197:00 amRNSHorse Hill Oil Field: HH-2z Horizontal Update
22nd Oct 20197:00 amRNSHH-2 Pilot Completed & HH-2z Horizontal Underway
15th Oct 20199:00 amRNSSuccessful Completion of HH-2 Coring Operations
11th Oct 20198:56 amRNSCoring Operations Underway at Horse Hill
9th Oct 20194:05 pmRNSFurther Loan Balance Reduction
9th Oct 20197:31 amRNSHorse Hill-1 Kimmeridge "Sim-Ops" Flow Test Update
8th Oct 20197:00 amRNSDrilling Update - Horse Hill
30th Sep 20197:01 amRNSHH-2/2z Drilling Commences ("Spud") at Horse Hill
30th Sep 20197:00 amRNSGrant of Options and Share Incentive Plan
27th Sep 20193:58 pmRNSLoan Conversion
24th Sep 20197:00 amRNSRig Arrival at Horse Hill
16th Sep 201911:33 amRNSLoan Conversion
12th Sep 20197:00 amRNSDrilling and Testing Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.