The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.125
Bid: 0.12
Ask: 0.13
Change: 0.00 (0.00%)
Spread: 0.01 (8.333%)
Open: 0.125
High: 0.125
Low: 0.125
Prev. Close: 0.125
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Storuman Tonnage/Grade Estimate

17 Nov 2009 07:00

RNS Number : 5910C
Tertiary Minerals PLC
17 November 2009
 



TERTIARY MINERALS PLC

www.tertiaryminerals.com

 17 November 2009

 
STORUMAN TONNAGE/GRADE ESTIMATE
 
·; Independent Review Confirms Excellent Geological Continuity For Storuman Fluorspar Mineralisation
·; Potential For At Least 3 Million Tonnes Of Contained Fluorspar
 
·; Tonnage Estimate Within Drill Tested Area Almost Double Historical Estimates
 
 

 

Tertiary Minerals plc ("Tertiary" or "the Company") is pleased to advise that independent consultant Scott Wilson Ltd ("Scott Wilson") has reported on its review of the fluorspar mineralisation at the Company's Storuman project in Sweden. This is an essential component of the Scoping Study currently in progress.

The review considered the results of 39 drill holes completed by Gränges Exploration in the 1970s contained within a surface area of 2.1km by 1km (approx. 250m drill spacing), and 10 confirmatory drill holes completed in 2008 by Tertiary, mostly within the same area.

Scott Wilson has made an estimate of the tonnage and grade of mineralisation in the range of:

28 - 31 million tonnes grading 11.2-12.3% Fluorspar (CaF2) (see footnotes 1-4).

This estimate suggests potential for over 3 million tonnes of contained fluorspar. This is nearly double that contained in a historical estimate of 15.6 million tonnes grading 12.2% CaF2 reported by Gränges in the 1970at the same cut-off grade. Whilst this estimate is part of the public historical record and calculated according to norms applicable at that time, the 1970s estimate does not conform to existing recognised reporting codes.

The available Gränges drill assay records could not be verified to the high level of confidence required to estimate a "Mineral Resource" under the JORC Code (neither original assay certificates nor detailed lithological logs could be traced)

However, Scott Wilson considers that the drilling to date has confirmed the uniform style and lateral continuity of the two known fluorspar mineralised horizons and it is the Company's expectation that a large part of Scott Wilson tonnage can be converted into a JORC Mineral Resource by further drilling within the area of the 1970s drill grid. 

Furthermore, the Company believes that there is considerable potential for additional tonnage beyond the existing drill grid as the flat lying mineralisation remains open in three horizontal directions away from its outcrop.

When the current programme of metallurgical testwork is completed Scott Wilson will carry out a conceptual mine design, a preliminary economic evaluation of the project and complete the Scoping Study. 

Footnotes;

 

1. JORC is the Australasian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining & Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.
 
2. The tonnage and grade range is estimated by an Inverse Distance Squared block model at a cut off grade of 8% CaF2utilising lithological data from both the Tertiary and Gränges drill holes and fluorite grade data from just the Tertiary holes.
 
3. As required under Clause 18 of the 2004 JORC Code (Reporting of Exploration Results), the following statement is made regarding the Scott Wilson Storuman tonnage/grade range estimate: “The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource”.
4. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

Further info:

Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203

Jonathan Wright, Seymour Pierce Limited. Tel: +44(0)20-7107-8000

Background

Fluorspar is the commercial name for the industrial mineral fluorite (calcium fluoride - chemical formula CaF2). It is the main industrial source of fluorine for the manufacture of hydrofluoric acid and derivative fluorine chemicals including refrigerants, PTFE (Teflon) and aluminium hydrofluoride, a flux used in the reduction of alumina to aluminium. It is also used as a flux in steel making, in the ceramics industry and in the manufacture of nuclear fuel (uranium hexafluoride).

In 2008, Fluorspar consumers, several of which are based in Europe, faced critical supply shortages as traditional supplies from China were diverted to meet growing Chinese domestic demand. China has imposed export quotas and export taxes to discourage export and thus ensure domestic supplies. Whilst the market demand eased in during the recession in late 2008 and 2009 the long term outlook is for continuing tightness in supply

Tertiary's scoping study was initiated in late 2008 to follow up drilling results which confirmed the potential for a very large deposit of fluorspar on the company's 100% owned exploration licences at Storuman. The deposit is flat lying and has been indicated by drilling to occur over an area of at least 2.1km by 1km. It is located in an area with well established infrastructure adjacent to a sealed highway 20km from the regional town of Storuman. Storuman is connected by road and rail to the city and port of Umeå on the Gulf of Bothnia. In the other direction the highway leads to the port city of Mo-i-Rana in Norway.

A conceptual target for the Company is a mining operation producing at least 100,000 tonnes per annum of acid grade fluorspar. The world market for fluorspar is just over 5 million tonnes per annum of which 65% is for acid grade fluorspar.

The scoping study to evaluate the technical and economic viability of developing the Storuman fluorspar deposit was awarded to Scott Wilson Ltd, an international design and engineering consultancy, which will be responsible for modelling the mineralisation, conceptual mine and process plant design, infrastructure, capital and operating costs estimation and financial modelling. Metallurgical testwork is being carried out by SGS Lakefield in Canada in consultation with the Company's metallurgical consultant, Delta Minerals, which will also provide a conceptual mineral processing flowsheet on which the process plant design will be based. URS Nordic AB, a wholly owned subsidiary of URS Corporation, has provided advice to Tertiary Minerals plc on the environmental and social permitting process for the Storuman mine development for inclusion in the Scoping Study.


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUGCAGUPBGQQ
Date   Source Headline
18th Aug 20217:00 amRNSExploration Update – Brunton Pass Copper Project
2nd Aug 20217:00 amRNSOption Agreement – Zambian Copper Prospects
27th Jul 20217:00 amRNSExploration Update – Pyramid Silver-Gold Project
28th Jun 20215:06 pmRNSKalkkinen Project
28th Jun 20219:57 amRNSGrant of Warrants
3rd Jun 20217:00 amRNSPyramid Silver-Gold Project Update
26th May 20218:43 amRNSHalf-Yearly Report 2021
18th May 20217:00 amRNSFormation of Zambian Subsidiary
31st Mar 20217:00 amRNSTotal Voting Rights
26th Mar 20217:00 amRNSLucky Project Drill Results
24th Mar 202112:17 pmRNSResult of General Meeting
17th Mar 20217:00 amRNSDirector / PDMR Shareholding
10th Mar 20217:00 amRNSPyramid Gold-Silver Project – Exploration Update
4th Mar 20217:00 amRNSNotice of General Meeting
26th Feb 20217:00 amRNSTotal Voting Rights
24th Feb 20213:40 pmRNSIssue of Equity and Total Voting Rights
22nd Feb 20217:00 amRNSLucky Project Drilling
19th Feb 20214:40 pmRNSSecond Price Monitoring Extn
19th Feb 20214:35 pmRNSPrice Monitoring Extension
19th Feb 20217:00 amRNSHolding(s) in Company
16th Feb 20217:00 amRNSPaymaster Polymetallic Project- Exploration Update
10th Feb 20219:10 amRNSIssue of Equity and Total Voting Rights
8th Feb 20213:58 pmRNSWarrant Exercise
3rd Feb 20213:32 pmRNSIssue of Equity and Total Voting Rights
3rd Feb 20217:00 amRNSMt Tobin Project - Exploration Update
28th Jan 20214:21 pmRNSResult of AGM
26th Jan 20213:25 pmRNSPlacing to Raise £450,000 and TVR
21st Jan 20213:49 pmRNSIssue of Equity
21st Jan 20217:00 amRNSKalkkinen data sale for E46 shares & royalty
18th Jan 20217:00 amRNSNew Copper Exploration Project, Brunton Pass, USA
14th Jan 20213:35 pmRNSNew Website
11th Jan 20217:00 amRNSProject Updates - Exploration Results
23rd Dec 20207:00 amRNSPublication of Annual Accounts, Notice of AGM
16th Dec 20207:00 amRNSAppointment of Non-executive Director
11th Dec 20203:45 pmRNSAudited Results for the year to 30 September 2020
3rd Dec 20203:28 pmRNSKaaresselkä Gold Royalty
6th Oct 20202:20 pmRNSKaaresselka Gold Royalty
6th Oct 20209:21 amRNSDirector Shareholding
30th Sep 20207:00 amRNSProject Updates
10th Sep 202011:29 amRNSResult of General Meeting
3rd Sep 20207:00 amRNSKaaresselkä Gold Royalty
1st Sep 202010:03 amRNSTotal Voting Rights
24th Aug 20207:00 amRNSBuy-back of Deferred Shares, Notice of GM
31st Jul 20201:17 pmRNSDirector Dealing, Issue of Equity and TVR
27th Jul 20207:00 amRNSMt Tobin Project Update
20th Jul 20207:00 amRNSProject Updates
3rd Jul 20207:00 amRNSIssue of Equity
30th Jun 20204:40 pmRNSSecond Price Monitoring Extn
30th Jun 20204:35 pmRNSPrice Monitoring Extension
29th May 20201:15 pmRNSHalf-Yearly Report 2020

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.