We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTower Resources Regulatory News (TRP)

Share Price Information for Tower Resources (TRP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.02
Bid: 0.019
Ask: 0.021
Change: 0.00 (0.00%)
Spread: 0.002 (10.526%)
Open: 0.02
High: 0.02
Low: 0.02
Prev. Close: 0.02
TRP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update - Cameroon

10 Oct 2017 07:00

RNS Number : 1286T
Tower Resources PLC
10 October 2017
 

10 October 2017

 

Tower Resources plc

Operational Update - Cameroon

 

Tower Resources plc (the "Company" or "Tower" (TRP.L, TRP LN)), the AIM-listed oil and gas company with a focus on Africa, is pleased to provide an update on the status of the Thali block in Cameroon.

 

Following a Technical Committee Meeting and Operating Committee Meeting between Tower, the Cameroon Ministry of Mines, Industry & Technological Development ("MINMIDT") and the Société Nationale des Hydrocarbures ("SNH") held in Douala on 3 October 2017, Tower, MINMIDT and SNH have agreed on the following next steps in support of the PSC work commitments:

 

· To conduct reprocessing of the existing 3D seismic data and conduct specific specialist studies such as attribute analysis, including AVO and pore pressure prediction, and coherency cubes on that data;

 

· To continue with the geological and geophysical interpretations, using that reprocessed data, to refine and high-grade the prospect inventory on the Thali PSC block, to mature the drillable prospects;

 

· To investigate rig availability with appropriate technical specifications; and

 

· Based on this work, Tower aims to provide SNH with a prospect inventory and prioritisation during Q2 2018, and will agree with SNH a location for the first new well on the block.

 

In respect of acquisition of new seismic data on the block, Tower, will continue to search for a suitable seismic contractor; it being understood that the actual acquisition of new data may need to be deferred.

 

The budget for the planned work activities for 2017 and 2018 has been agreed. Tower, SNH and MINMIDT have agreed to meet in six months to evaluate the progress of the operations. Based on this progress the parties may contemplate an eventual extension of the initial period of the Exploration Phase to allow the fulfilment of all contractual obligations for the period.

 

Jeremy Asher, Chairman & CEO, commented:

 

"We are very pleased to have confirmed our next steps on the Thali license, including the reprocessing of existing 3D data, with a view to finalising priorities for drilling in 2018. We are also grateful to SNH and MINMIDT for their flexibility and support. By deferring the acquisition of new 3D data in favour of reprocessing existing 3D data we can save time and money in the near term, and move faster towards sourcing a rig in the currently depressed rig market. This not only accelerates our progress towards a well, but also makes the cost of our work programme over the coming year much more affordable, even taking into consideration the last portion of the signature bonus which is now falling due. With contingent Oil-In-Place estimated at 39 million barrels (Pmean, gross) already discovered on the block, we are keen to take advantage of the low cost of rigs in the current market and to begin drilling to reach a commercial scale for development of this high-quality near-field block as soon as possible."

 

 

 

Contacts

Tower Resources plc

Jeremy Asher (Chairman and CEO)Andrew Matharu (VP - Corporate Affairs)+44 20 7540 662 185

 

Peel Hunt LLP (Nominated Adviser and Broker)

Richard Crichton/Ross Allister+44 20 7418 8900

 

 

Notes:

 

Tower Resources Cameroon S.A, a wholly-owned subsidiary of Tower Resources plc, holds a 100% interest in the shallow water Thali (formerly known as "Dissoni") Production Sharing Contract (PSC), in the Rio del Rey basin, offshore Cameroon. Tower was awarded the PSC on 15 September 2015 for an Initial Exploration Period of 3 years.

The Thali PSC covers an area of 119.2 km², with water depths ranging from 8 to 48 metres, and lies in the prolific Rio del Rey basin, in the eastern part of the Niger Delta. The Rio del Rey basin has, to date, produced over one billion barrels of oil and has estimated remaining reserves of 1.2 billion boe, primarily within depths of less than 2,000 metres. The Rio del Rey is a sub-basin of the Niger Delta, an area in which over 34.5 billion barrels of oil has been discovered, with 2.5 billion boe attributed to the Cameroonian section. The Thali Block has the potential to hold up to four distinct play systems, including the established play in which three discovery wells, one gas (Rumpi-1), one oil and gas (Njonji-2) and one oil (Njonji-1), have already been drilled. The current contingent Oil-In-Place estimate for the Njonji discovery is 39 million barrels (Pmean, gross) with an estimated 7 to 15 million barrels of recoverable oil. These are currently viewed as sub-commercial discoveries, but once better seismic imaging has been achieved Tower sees potential to add incremental oil reserves to achieve commerciality. There is also significant potential to develop prospects at deeper levels, in both structural and stratigraphic traps, once better imaging has been achieved. 

In accordance with the guidelines for the AIM market of the London Stock Exchange, Dr Mark Enfield, BSc, PhD, FGS, Advisor to the Board of Tower Resources plc, who has over 30 years' experience in the oil & gas industry, is the qualified person that has reviewed and approved the technical content of this announcement.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGGBPUUPMGBB
Date   Source Headline
28th Mar 20247:00 amRNSTotal Voting Rights and Broker Update
29th Feb 20247:00 amRNSTotal Voting Rights
16th Feb 20247:00 amRNSGrant of Options under Long Term Incentive Plan
15th Feb 20247:00 amRNSRepayment of EECP Facility and Subscription
9th Feb 20247:00 amRNSShare Issuance to EECP
8th Feb 20247:00 amRNSExtension of Period of Thali License in Cameroon
31st Jan 20244:50 pmRNSTotal Voting Rights
4th Jan 20247:30 amRNSIssue of Warrants to Directors
4th Jan 20247:00 amRNSShare Issuance to EECP
29th Dec 20237:00 amRNSTotal Voting Rights
21st Dec 20232:12 pmRNSSP Angel Analyst Interview
20th Dec 20239:19 amRNSChairman and CEO Interview
18th Dec 20237:30 amRNSCompletion of Subscription
18th Dec 20237:00 amRNSRig Contract and Proposed Subscription
7th Dec 20237:30 amRNSSP Angel Analyst Research Report
7th Dec 20237:00 amRNSShare Issuance to EECP
30th Nov 20237:00 amRNSTotal Voting Rights
8th Nov 20237:00 amRNSShare Issuance to EECP
31st Oct 20237:00 amRNSTotal Voting Rights
11th Oct 20237:00 amRNSAfrica Oil Week – Technical Presentation
4th Oct 20237:00 amRNSShare Issuance to EECP
2nd Oct 20237:00 amRNSChairman and CEO Interview
2nd Oct 20237:00 amRNSIssue of Warrants to Directors
29th Sep 20237:00 amRNSInterim Results to 30 June 2023
17th Jul 20234:18 pmRNSReplacement Results of Annual General Meeting
17th Jul 20231:53 pmRNSResults of Annual General Meeting
3rd Jul 20237:00 amRNSIssue of Warrants to Directors
23rd Jun 202312:50 pmRNSPosting of Annual Report and Notice of Meeting
19th Jun 20237:00 amRNSPreliminary Results to 31 December 2022
16th Jun 20237:00 amRNSNamibia Technical Update
31st May 20237:00 amRNSTotal Voting Rights
30th May 20231:35 pmRNSHoldings in Company
30th May 20231:32 pmRNSNew interview with Chairman and CEO Jeremy Asher
16th May 20237:45 amRNSPlacing and Subscription to raise £2.3 million
2nd May 20237:00 amRNSIssue of Warrants to Directors
28th Apr 20237:00 amRNSTotal Voting Rights
27th Apr 20237:00 amRNSCameroon Update
30th Mar 20237:00 amRNSShare Issuance to EECP
15th Feb 20237:00 amRNSIssue of Warrants to Directors
31st Jan 20237:00 amRNSTotal Voting Rights
16th Jan 20237:00 amRNSInstitutional Placing of up to US$6 million
21st Nov 20227:00 amRNSCameroon Financing Update
6th Oct 20227:00 amRNSCorporate and Technical Presentations
3rd Oct 20227:00 amRNSIssue of Warrants to Directors
30th Sep 20227:00 amRNSInterim Results to 30 June 2022
30th Sep 20227:00 amRNSTotal Voting Rights
31st Aug 20227:00 amRNSTotal Voting Rights
30th Aug 20227:00 amRNSIssue of share in lieu of fees to Bedrock Drilling
16th Aug 20227:00 amRNSGrant of Options under Annual LTIP
2nd Aug 202211:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.