Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Uranium Exploration Update

24 Sep 2024 07:00

RNS Number : 2781F
Thor Energy PLC
24 September 2024
 

24 September 2024

Thor Energy PLC

 

("Thor" or the "Company")

 

Uranium Exploration Update: Drill Preparations Underway

Wedding Bell and Radium Mountain Projects, USA

 

The directors of Thor Energy Plc ("Thor") (AIM, ASX: THR, OTCQB: THORF) are pleased to provide a drilling update on the Company's 100% owned Wedding Bell and Radium Mountain Projects, located in the uranium-vanadium mining district of the Uravan Mineral Belt, southwest Colorado, USA.

Highlights:

§ On-ground drill site preparations are now underway for our 2024 drilling programs at Rim Rock and Groundhog mine areas, with drilling scheduled to commence in early October (Figure 1).

§ The reverse circulation program includes infill and extension holes following up on Thor's successful 2022 and 2023 program, with the objective of completing a JORC mineral resource estimation.

§ At Groundhog, infill drilling will be centred around high-grade uranium and vanadium mineralisation intercepted in 23WBRA020 (ASX/AIM: 29 February 2024), with extension holes up to 300m to the north and east (Figure 2). 

23WBR020: 4.9m @ 1199ppm (0.12%) U3O8 and 6306ppm (0.63%) V2O5 from 82m,

Including, 0.6m @ 6250ppm (0.63%) U3O8 and 30348ppm (3.0%) V2O5 from 82.6m

§ At Rim Rock, infill drilling will be centred around 23WBRA011, 23WBRA012 and 23WBRA016 (ASX/AIM: 29 February 2024), with exension drilling toward the open areas to the east and south (Figure 3).

23WBR011: 6.1m @ 563ppm (0.06%) U3O8 and 9100ppm (0.9%) V2O5 from 74.7m,

Including, 1.5m @ 1624ppm (0.16%) U3O8 and 19637ppm (2.0%) V2O5 from 76.2m

§ Drill contractor Envirotech Drilling LLC and downhole logging contractor Jet West Geophysical Services LLC have both been secured/contracted.

Photo 1: Site preparation at Groundhog Prospect

 

Nicole Galloway Warland, Managing Director of Thor Energy, commented:

 

"With all approvals in place as announced in August, Thor is delighted to commence on ground drill site preparations for our upcoming infill and extension drill program. This highlights the Company's direction in focusing on our main priority in the Thor portfolio, our uranium and vanadium prospects at the Wedding Bell and Radium Mountain Projects.

 

"We look forward to updating the market when drilling commences." 

 

Figure 1: Wedding Bell and Radium Mountain Projects, Colorado

 

Figure 2: Drill collars at Groundhog Mine showing 2024 proposed collars in blue

 

Figure 3: Drill collars at Rim Rock mine area showing 2024 proposed collars in blue

Figure 4: Uranium and Vanadium Project Location Map within the Uravan Mineral Belt

 

 

The Board of Thor Energy Plc has approved this announcement and authorised its release.

 

For further information, please contact:

Thor Energy PLC

Nicole Galloway Warland, Managing Director

Ray Ridge, CFO / Company Secretary

Tel: +61 (8) 7324 1935

Tel: +61 (8) 7324 1935

Zeus Capital Limited (Nominated Adviser and Joint Broker)

Tel: +44 (0) 203 829 5000

Antonio Bossi / Darshan Patel / Isaac Hooper

SI Capital Limited (Joint Broker)

Tel: +44 (0) 1483 413 500

Nick Emerson

Yellow Jersey (Financial PR)

thor@yellowjerseypr.com

Dom Barretto / Shivantha Thambirajah / Bessie Elliot

Tel: +44 (0) 20 3004 9512

 

Competent Person Statement

The information in this report that relates to Geological interpretation and Exploration Results is based on information compiled by Nicole Galloway Warland, who holds a BSc Applied geology (HONS) and who is a Member of The Australian Institute of Geoscientists. Ms Galloway Warland is an employee of Thor Energy PLC. She has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Nicole Galloway Warland consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

About Thor Energy Plc

The Company is predominantly focused on uranium and energy metals that are crucial in the shift to a 'green' energy economy. Thor has several highly prospective projects that give shareholders exposure to uranium, vanadium, copper, tungsten, lithium, nickel and gold, located in the favourable mining jurisdictions of Australia and the USA.

Thor holds 100% interest in three uranium and vanadium projects (Wedding Bell, Radium Mountain and Vanadium King) in the Uravan Belt region of Colorado and Utah, with historical high-grade uranium and vanadium drilling and production results.

At Alford East in South Australia, Thor has earnt an 80% interest in oxide copper deposits considered amenable to extraction via In-Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral Resource Estimate.

Thor also holds a 26.3% interest in a private Australian copper development company EnviroCopper Limited (ECL), which Kapunda copper mine and the Alford West copper project, both situated in South Australia, and both considered amenable to recovery by way of ISR. Alligator Energy recently invested A$0.9M for a 7.8% interest in ECL with the rights to gain a 50.1% interest by investing a further A$10.1m over four years.

Thor holds 75% interest (with Investigator Resources 25%) of the advanced Molyhil tungsten project, including measured, indicated and inferred resources, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern Territory government in July 2020.

Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging early-stage gold and nickel results in the Pilbara region of Western Australia.

For further information on Thor Energy and to see an overview of its projects, please visit the Company's website at https://thorenergyplc.com/.

 

The Company notes that for the relevant market announcements noted above, that it is not aware of any new information or data that materially affects this information and that all material assumptions and technical parameters underpinning any estimates continue to apply and have not materially changed.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLUOAURSBUKUAR
Date   Source Headline
12th Jan 20157:00 amRNSUPGRADED MOLYHIL FEASIBILITY STUDY
9th Jan 20157:00 amRNSAppendix 3B
6th Jan 201512:41 pmRNSHolding(s) in Company
1st Dec 20149:20 amRNSAppendix 3B
1st Dec 20149:19 amRNSCleansing Notice
1st Dec 20147:00 amRNSPilot Mountain Tungsten Project Development Plan
24th Nov 20149:40 amRNSPlacements
21st Nov 201412:03 pmRNSAppendix 3Y
20th Nov 20149:43 amRNSHolding(s) in Company
11th Nov 20149:45 amRNSAppendix 3B
11th Nov 20149:43 amRNSCleansing Notice
11th Nov 20149:42 amRNSAppendix 3Y
6th Nov 20142:29 pmRNSResult of AGM
3rd Nov 20149:26 amRNSHolding(s) in Company
31st Oct 20147:00 amRNSQuarterly Activities Report to September 2014
31st Oct 20147:00 amRNSAppendix 5B
30th Oct 20147:00 amRNSCleansing Notice
30th Oct 20147:00 amRNSAppendix 3Y
30th Oct 20147:00 amRNSAppendix 3B
28th Oct 20147:30 amRNSPilot Mountain Acquisition - Update
24th Oct 20147:41 amRNSPilot Mountain Acquisition - Update
6th Oct 20149:11 amRNSNotice of AGM
1st Oct 20149:55 amRNSLapse of Unlisted Warrants (Options)
1st Oct 20149:52 amRNSAppendix 3B
16th Sep 20147:40 amRNSAcquisition of Pilot Mountain Tungsten Project
11th Sep 20147:00 amRNSAppendix 3B
11th Sep 20147:00 amRNSChange of Address
5th Sep 20147:30 amRNSAnnual Results
22nd Aug 201410:05 amRNSHolding(s) in Company
20th Aug 20147:00 amRNSAppendix 3B
14th Aug 201412:32 pmRNSShare Subscription & Placement Agreement
8th Aug 20149:50 amRNSUpdate on Spring Hill gold project
1st Aug 20147:00 amRNSAudio Broadcast Regarding Molyhil
1st Aug 20147:00 amRNSAppendix 3B
31st Jul 201410:57 amRNSResult of general meeting
31st Jul 20147:00 amRNSAppendix 5B
31st Jul 20147:00 amRNSQuarterly Activities Report t o June 2014
29th Jul 20147:00 amRNSUpgraded Ore Reserve For Molyhil Tungsten Mine
23rd Jul 20149:11 amRNSSale of Shares in Ram Resources (ASX: RMR)
17th Jul 20147:00 amRNSASX Waiver re Listing Rule 10.13.3
14th Jul 20149:23 amRNSNotice of General Meeting
11th Jul 20144:47 pmRNSHolding(s) in Company
9th Jul 20147:00 amRNSAppendix 3B
4th Jul 20147:00 amRNSBlocklisting Six Monthly Return
3rd Jul 20141:37 pmRNSAdditional placing of shares
3rd Jul 201412:31 pmRNSPlacing of shares
3rd Jul 20149:15 amRNSAppendix 3B
16th Jun 20149:06 amRNSLapse of Unlisted Options (Warrants in UK)
10th Jun 20147:00 amRNSAcquisition of Pilot Mountain Tungsten Project
3rd Jun 20149:26 amRNSInformation Required under ASX Listing Rule 3.10.5

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.