Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStellar Diamonds Regulatory News (STEL)

  • There is currently no data for STEL

Droujba Kimberlite Pipe Update

27 Jun 2011 07:00

RNS Number : 1262J
Stellar Diamonds PLC
27 June 2011
 



 

 

 

 

 

 

NOT FOR DISTRIBUTION IN THE UNITED STATES OR FOR DISSEMINATION TO US NEWS WIRE SERVICES.

 

27 June 2011

 

AIM: STEL

Stellar Diamonds plc

("Stellar" or the "Company")

 

Drilling Update on Droujba Kimberlite Pipe, Guinea

 

Stellar Diamonds plc, the London listed (AIM: STEL) diamond mining and exploration company focused on West Africa provides an operational update on the drilling programme at the Company's diamondiferous Droujba kimberlite pipe project located in eastern Guinea.

 

Highlights:

·; Deepest drill intersect recorded to date of 388m considered highly encouraging

·; Drill programme doubled in scope to 12,000m to test targets defined from orebody modelling

·; Bulk sampling plant being installed on site, relocated from the Company's Bomboko project

·; Further 268kg of drill core sample consigned for microdiamond analysis in Canada

·; Previous microdiamond analysis of 400kg of hypabyssal kimberlite returned 952 diamonds

 

Chief Executive Karl Smithson commented:

"The drilling programme at Droujba is progressing well and the significant intersection of kimberlite at a depth of 388m is considered to be highly encouraging in terms of the potential tonnage of the Droujba pipe. Based on the interpretation of the drilling data the Company has elected to double the current 6,000m drilling programme in order to model the ore body to depth and, in tandem with further microdiamond sampling and a surface bulk sampling programme, establish an initial inferred resource estimate by the end of the first quarter of 2012. I look forward to updating shareholders in due course."

 

Drilling Programme

Drilling at Droujba is on going with a total of 4,400 metres completed to date from 23 holes. The pipe has been delineated at surface as being at least 3 hectares in size, with the deepest intersection to date being at 388m from surface. The orebody comprises two main intrusions of hypabyssal kimberlite in an envelope of explosion breccia with varying kimberlite content. The southern 'blind intrusion' of hypabyssal kimberlite previously reported has now been intersected at a depth of between 300m and 400m and remains open at depth, proving the existence of this kimberlite unit further to the west and deeper than previously known. Petrographic analysis and microdiamond results suggest that the southern blind intrusion is very similar to the hypabyssal unit that reaches surface and was mined to a depth of 20m in the 1960's by the Russian Aid Mission. Therefore it is possible that these two separate hypabyssal kimberlite intrusions coalesce at depth, although this remains to be proven by further drilling.

 

The expansion of the drilling programme is designed to further define the kimberlite both near to surface and at depth, as well as test unresolved geophysical anomalies and the extensive Katcha kimberlite dyke which is adjacent to the Droujba pipe. This additional drilling is included in the current budget.

 

3D Geological Modelling

Independent 3D modelling has been undertaken by Datamine in South Africa on the drilling data received to date. This has defined a geological model containing 4.7 million tons of hypabyssal kimberlite and 10.4 million tons of kimberlite breccia to a depth of 350m below surface. This is not yet classified as a mineral resource estimate. However, it is the objective of the continued drilling programme, microdiamond analysis and planned surface bulk sampling to define an initial inferred resource in accordance with the JORC (or equivalent) code.

 

Microdiamond Sampling and Results

A further sample of 268kg of kimberlite breccia is currently in the Saskatchewan Research Council laboratory in Canada for microdiamond analysis. Previous results of a 98kg sample of kimberlite breccia (as reported on the 1st February 2011) returned 48 diamonds, including one diamond in excess of 5mm in one dimension. The breccia is volumetrically important to the potential resource and the Company considers that further microdiamond samples are required to provide a more representative result. The hypabyssal kimberlite has so far returned abundant diamond counts of over 2 diamonds per kilogramme. A total of 400.87kg of hypabyssal kimberlite has been processed to date and returned 952 diamonds (as reported on the 1st February and 19th April 2011).

 

Bulk Sample Processing

A sample processing plant is currently being established at Droujba. The plant has recently been relocated from the Company's Bomboko alluvial project and will be modified to process kimberlite. Once erected and modified it will be used to process a series of bulk samples of approximately 2,000 tonnes each from the fourth quarter of 2011. The bulk samples will test all of the main geological units identified to date, in order to obtain a representative parcel of diamonds for valuation. In addition, a bulk sample of the mine dumps that remain from previous mining undertaken by the Russian Aid Mission in the 1960s will be tested in order to obtain an early understanding of the potential diamond quality.

 

About Stellar Diamonds plc

Stellar is a London (AIM: STEL) listed diamond mining and exploration company focussed on West Africa. Stellar owns a 100% interest in four high-grade kimberlite projects. In Guinea resource definition drilling is continuing on the diamondiferous Droujba kimberlite pipe and bulk sampling is underway on the high grade Bouro kimberlite dyke which is adjacent to the Company's Mandala alluvial diamond mine. In Sierra Leone at Tongo a bulk sampling programme is ongoing on the high grade Dyke 1 and bulk sampling is planned on the Lion 5 dyke at the Kono kimberlite project.

 

For further information please contact the following or visit the Company's website at www.stellar-diamonds.com.

 

Stellar Diamonds plc

Karl Smithson, Chief Executive Tel: +44 (0) 20 7257 2930

 

Northland Capital Partners Limited

Gavin Burnell, Edward Hutton

Katie Shelton, Alice Lane (Broking) Tel: +44 (0) 20 7796 8800

Charles Vaughan (Sales)

 

Daniel Stewart & Company plc

Martin Lampshire, Oliver Rigby Tel: +44 (0) 20 7776 6550

 

Pelham Bell Pottinger

Charles Vivian / James MacFarlane Tel: +44 (0) 20 7861 3232

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFFMBTMBATTPB
Date   Source Headline
25th May 201212:54 pmRNSHolding(s) in Company
21st May 201212:02 pmRNSReplacement Result of EGM
21st May 201211:37 amRNSResult of EGM
2nd May 201212:30 pmRNSProposed Placing and Capital Reorganisation
12th Apr 20127:00 amRNSKono Licence Dispute
12th Apr 20127:00 amRNSResults from Lion-5 Kimberlite in Kono
2nd Apr 20127:00 amRNSSignificant Maiden Diamond Resource at Droujba
26th Mar 20127:00 amRNSSignificant Maiden Diamond Resource
22nd Feb 20127:00 amRNSDroujba bulk sampling update
6th Feb 20127:00 amRNSKono bulk sampling diamond grade results
31st Jan 20127:00 amRNSInterim Results
19th Jan 20127:00 amRNSTongo resource definition programme update
19th Dec 20117:00 amRNSStellar Diamonds Droujba Microdiamond Results
28th Nov 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Nov 20111:47 pmRNSResult of AGM
18th Oct 20117:00 amRNSDrilling Update
17th Oct 20117:00 amRNSFinal Results
26th Sep 20117:00 amRNSNotice of Results
16th Aug 20117:00 amRNSDrilling underway at Tongo Project in Sierra Leone
10th Aug 20117:00 amRNSAppointment of Mining Consultant
10th Aug 20117:00 amRNSAppointment of Independent Consultant
11th Jul 20117:00 amRNSTongo Kimberlite Dyke Project Update
27th Jun 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Jun 20117:00 amRNSChange of Registered Office Address
31st May 20118:18 amRNSGRANT OF SHARE OPTIONS
26th Apr 20117:00 amRNSDirectors Share Purchases
19th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
18th Apr 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
13th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
4th Apr 20119:32 amRNSDirectorate Change
1st Apr 20117:00 amRNSChange of Advisor
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSTotal Voting Rights
28th Mar 20111:41 pmRNSResult of General Meeting
15th Mar 20117:00 amRNSUpdate on Bouro Kimberlite Project
10th Mar 20117:00 amRNSProposed Placing to Raise £6.2million
4th Mar 20117:00 amRNSInterim Results
21st Feb 20117:00 amRNSStrategic and Operational Update
15th Feb 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
1st Feb 20117:00 amRNSDroujba Kimberlite Pipe Update
17th Jan 20117:00 amRNSDroujba kimberlite Pipe Update
16th Dec 20104:58 pmRNSResult of Annual General Meeting
15th Dec 20107:00 amRNSDrilling Intersects Kimberlite Pipe at Droujba
14th Dec 20107:00 amRNSFinal Results to 30 June 2010
22nd Nov 201012:44 pmRNSHolding(s) in Company
22nd Nov 20107:00 amRNSTongo Kimberlite Diamond Project Update
16th Nov 201010:23 amRNSNotice of Annual General Meeting
15th Nov 20107:00 amRNSDrilling Underway at Droujba Kimberlite Pipe
3rd Nov 20107:00 amRNSChange of Name of Joint Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.