Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStellar Diamonds Regulatory News (STEL)

  • There is currently no data for STEL

Droujba Kimberlite Pipe Update

27 Jun 2011 07:00

RNS Number : 1262J
Stellar Diamonds PLC
27 June 2011
 



 

 

 

 

 

 

NOT FOR DISTRIBUTION IN THE UNITED STATES OR FOR DISSEMINATION TO US NEWS WIRE SERVICES.

 

27 June 2011

 

AIM: STEL

Stellar Diamonds plc

("Stellar" or the "Company")

 

Drilling Update on Droujba Kimberlite Pipe, Guinea

 

Stellar Diamonds plc, the London listed (AIM: STEL) diamond mining and exploration company focused on West Africa provides an operational update on the drilling programme at the Company's diamondiferous Droujba kimberlite pipe project located in eastern Guinea.

 

Highlights:

·; Deepest drill intersect recorded to date of 388m considered highly encouraging

·; Drill programme doubled in scope to 12,000m to test targets defined from orebody modelling

·; Bulk sampling plant being installed on site, relocated from the Company's Bomboko project

·; Further 268kg of drill core sample consigned for microdiamond analysis in Canada

·; Previous microdiamond analysis of 400kg of hypabyssal kimberlite returned 952 diamonds

 

Chief Executive Karl Smithson commented:

"The drilling programme at Droujba is progressing well and the significant intersection of kimberlite at a depth of 388m is considered to be highly encouraging in terms of the potential tonnage of the Droujba pipe. Based on the interpretation of the drilling data the Company has elected to double the current 6,000m drilling programme in order to model the ore body to depth and, in tandem with further microdiamond sampling and a surface bulk sampling programme, establish an initial inferred resource estimate by the end of the first quarter of 2012. I look forward to updating shareholders in due course."

 

Drilling Programme

Drilling at Droujba is on going with a total of 4,400 metres completed to date from 23 holes. The pipe has been delineated at surface as being at least 3 hectares in size, with the deepest intersection to date being at 388m from surface. The orebody comprises two main intrusions of hypabyssal kimberlite in an envelope of explosion breccia with varying kimberlite content. The southern 'blind intrusion' of hypabyssal kimberlite previously reported has now been intersected at a depth of between 300m and 400m and remains open at depth, proving the existence of this kimberlite unit further to the west and deeper than previously known. Petrographic analysis and microdiamond results suggest that the southern blind intrusion is very similar to the hypabyssal unit that reaches surface and was mined to a depth of 20m in the 1960's by the Russian Aid Mission. Therefore it is possible that these two separate hypabyssal kimberlite intrusions coalesce at depth, although this remains to be proven by further drilling.

 

The expansion of the drilling programme is designed to further define the kimberlite both near to surface and at depth, as well as test unresolved geophysical anomalies and the extensive Katcha kimberlite dyke which is adjacent to the Droujba pipe. This additional drilling is included in the current budget.

 

3D Geological Modelling

Independent 3D modelling has been undertaken by Datamine in South Africa on the drilling data received to date. This has defined a geological model containing 4.7 million tons of hypabyssal kimberlite and 10.4 million tons of kimberlite breccia to a depth of 350m below surface. This is not yet classified as a mineral resource estimate. However, it is the objective of the continued drilling programme, microdiamond analysis and planned surface bulk sampling to define an initial inferred resource in accordance with the JORC (or equivalent) code.

 

Microdiamond Sampling and Results

A further sample of 268kg of kimberlite breccia is currently in the Saskatchewan Research Council laboratory in Canada for microdiamond analysis. Previous results of a 98kg sample of kimberlite breccia (as reported on the 1st February 2011) returned 48 diamonds, including one diamond in excess of 5mm in one dimension. The breccia is volumetrically important to the potential resource and the Company considers that further microdiamond samples are required to provide a more representative result. The hypabyssal kimberlite has so far returned abundant diamond counts of over 2 diamonds per kilogramme. A total of 400.87kg of hypabyssal kimberlite has been processed to date and returned 952 diamonds (as reported on the 1st February and 19th April 2011).

 

Bulk Sample Processing

A sample processing plant is currently being established at Droujba. The plant has recently been relocated from the Company's Bomboko alluvial project and will be modified to process kimberlite. Once erected and modified it will be used to process a series of bulk samples of approximately 2,000 tonnes each from the fourth quarter of 2011. The bulk samples will test all of the main geological units identified to date, in order to obtain a representative parcel of diamonds for valuation. In addition, a bulk sample of the mine dumps that remain from previous mining undertaken by the Russian Aid Mission in the 1960s will be tested in order to obtain an early understanding of the potential diamond quality.

 

About Stellar Diamonds plc

Stellar is a London (AIM: STEL) listed diamond mining and exploration company focussed on West Africa. Stellar owns a 100% interest in four high-grade kimberlite projects. In Guinea resource definition drilling is continuing on the diamondiferous Droujba kimberlite pipe and bulk sampling is underway on the high grade Bouro kimberlite dyke which is adjacent to the Company's Mandala alluvial diamond mine. In Sierra Leone at Tongo a bulk sampling programme is ongoing on the high grade Dyke 1 and bulk sampling is planned on the Lion 5 dyke at the Kono kimberlite project.

 

For further information please contact the following or visit the Company's website at www.stellar-diamonds.com.

 

Stellar Diamonds plc

Karl Smithson, Chief Executive Tel: +44 (0) 20 7257 2930

 

Northland Capital Partners Limited

Gavin Burnell, Edward Hutton

Katie Shelton, Alice Lane (Broking) Tel: +44 (0) 20 7796 8800

Charles Vaughan (Sales)

 

Daniel Stewart & Company plc

Martin Lampshire, Oliver Rigby Tel: +44 (0) 20 7776 6550

 

Pelham Bell Pottinger

Charles Vivian / James MacFarlane Tel: +44 (0) 20 7861 3232

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFFMBTMBATTPB
Date   Source Headline
26th Feb 20147:00 amRNSExercise of Warrants
12th Feb 20147:00 amRNSContinued High Diamond Grades at Tongo Project
3rd Feb 20147:00 amRNSUpdated Corporate Presentation, Report & Accounts
15th Jan 20147:00 amRNSStrong Progress at Tongo Diamond Project
18th Dec 201310:10 amRNSResult of AGM
17th Dec 20134:00 pmRNSShare Subscription and Issue of Warrants
9th Dec 20137:00 amRNSJoint Venture on Baoulé Diamond Pipe in Guinea
22nd Nov 20137:00 amRNSFinal Results for the year ended 30 June 2013
11th Nov 20137:00 amRNSMandala Mining Licence Successfully Renewed
1st Nov 20137:00 amRNSAppointment of New Nominated Adviser and Broker
16th Oct 20137:00 amRNSFirst Ore Blast at Tongo Kimberlite Project
17th Sep 20131:26 pmRNSGrant of Share Options
5th Sep 201312:10 pmRNSDirector/PDMR Shareholding
3rd Sep 20137:00 amRNSCommencement of bulk sampling
30th Aug 20137:00 amRNSTotal Voting Rights
16th Aug 201310:45 amRNSResult of General Meeting
6th Aug 20132:22 pmRNSHolding(s) in Company
30th Jul 20137:00 amRNSPLACING OF SHARES
24th Jul 201312:41 pmRNSPlacing of Shares
24th Jul 201312:41 pmRNSPositive Economic Scoping Studies
19th Mar 20137:00 amRNSHalf Yearly Report
5th Mar 20137:00 amRNSExploration Licence renewal
28th Feb 20134:12 pmRNSTotal Voting Rights
18th Feb 20137:00 amRNSChange of Adviser
14th Feb 20137:00 amRNSCOMMENCEMENT OF ECONOMIC SCOPING STUDIES
5th Feb 20137:00 amRNSShare Placing and Subscription
16th Jan 20137:00 amRNSExploration Licence in Guinea Successfully Renewed
21st Dec 201212:44 pmRNSGrant of Share Options
17th Dec 20127:00 amRNSResource Increased at Droujba Kimberlite Project
4th Dec 20127:00 amRNSTongo Resource Expanded to Over One Million Carats
30th Nov 20123:02 pmRNSHolding(s) in Company
22nd Nov 20127:00 amRNSAppointment of Director
21st Nov 201212:47 pmRNSResult of AGM
14th Nov 20125:44 pmRNSNotification of Major Interest in Shares
13th Nov 20122:23 pmRNSHolding(s) in Company
24th Oct 20127:00 amRNSFurther Investment by Major Shareholder
24th Oct 20127:00 amRNSFinal Results for the year ended 30 June 2012
9th Oct 20127:00 amRNSChange of Registered Office Address
2nd Oct 20127:00 amRNSMicrodiamond Results from Katcha in Guinea
26th Sep 20127:00 amRNSBulk Sampling of Droujba Kimberlite in Guinea
18th Sep 20127:00 amRNSKatcha Dyke Final Bulk Sampling Results
11th Sep 20127:00 amRNSCompletion of Resource Expansion Drilling at Tongo
6th Aug 20127:00 amRNSBulk Sampling of the Katcha Dyke in Guinea
31st Jul 20127:00 amRNSTongo Licence Renewed in Sierra Leone
27th Jul 20121:44 pmRNSDirector/PDMR Shareholding
18th Jul 20127:00 amRNSDirector/PDMR Shareholding
5th Jul 20127:00 amRNSResource Expansion Drilling at Tongo, Sierra Leone
25th Jun 20127:00 amRNSDroujba Bulk Sampling Results
31st May 20127:00 amRNSNotification of Major Interest in Shares
30th May 20122:05 pmRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.