SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSosandar Regulatory News (SOS)

Share Price Information for Sosandar (SOS)

Share Price is delayed by 15 minutes
Get Live Data
11.00    0.00 (0.00%)
Bid:
10.50
Ask:
11.50
Spread: 1.00 (9.524%)
Market Cap: £24.00m
SOS Live PriceLast checked at - London Stock Exchange

Intraday Sosandar Share Chart

4,000m Drilling Programme Completed on Schedule

18 Dec 2014 07:00

RNS Number : 0917A
Orogen Gold PLC
18 December 2014
 



18 December 2014

Orogen Gold plc

("Orogen" or the "Company")

 

Mutsk gold project Armenia

4,000m Diamond Drilling Programme Completed on Schedule

Orogen Gold plc (AIM: ORE), the AIM quoted gold exploration company, provides the following update on the Company's exploration programme at the Mutsk gold project in southern Armenia.

Highlights:

 

· 4,000m drilling programme completed on schedule and within budget

· Holes on main zone confirm continuity of gold mineralisation

· Hole OG14-39 cuts 11m @ 1.24g/t Au; OG14-40 intersects 32m @ 1.00g/t Au

· Drill data collation and modelling of mineralised zones to be undertaken

· Initial test work planned on gold deportment and recovery

 

Ed Slowey, Chief Executive of Orogen, commented: "The results of the final phase of the 2014 drilling programme at Mutsk have significantly increased our confidence in the continuity of the gold mineralisation within a 250m by 100m zone which has been drilled in some detail. Drilling along strike has continued to extend the limits of the hydrothermal system which has still not been closed off. The Company will now work on collating and modelling the data accumulated during the drill programme to help plan a focussed follow-on programme in 2015." 

 

Latest Drilling Results

 

Significant gold assay intervals from recent drill holes*
Hole No.
Depth from (m)
Depth to (m)
Interval (m)
Grade Au g/t
OG14-39
82.0
93.0
11.0
1.24
incl.
83.0
90.0
7.0
1.85
OG14-40
75.0
107.0
32.0
1.00
incl.
77.0
96.4
19.4
1.39

*Downhole intervals - true widths may be less

The diamond drill programme at the Mutsk gold project was completed as planned in late November 2014 as winter snow set in. In all, a total of about 4,000m was drilled in 27 holes. The most recent holes were all drilled at 55 degrees towards the east and were planned to test both the continuity of gold mineralisation within the main zone as well as exploration holes to test the possible northern and southern strike extensions of the hydrothermal alteration system.

Encouragingly, holes OG14-39 and OG14-40 confirm internal continuity of hydrothermal alteration and gold mineralisation within the 'main zone' over an area of at least 250m by 100m, with a second mineralised zone occurring about 200m to the north. OG14-42 cut unaltered rocks within a probable fault structure between the two mineralised zones.

The remaining two holes demonstrated continuation of the alteration zone for over 2km north to south and the zone remains open to the south beyond the area drilled to date.

For maps of the Mutsk property please refer to the Mutsk project page on the Orogen website at www.orogengold.com

 

Further Work

The Company will use the winter season to collate and digitise the drill data gathered during the 2014 drilling programme to improve understanding of the mineralised system at Mutsk and to plan a focussed follow-up programme in 2015.

In addition it is planned to send a composite sample of previously assayed drill core to a specialist metallurgical laboratory in order to test how the gold occurs within the Mutsk system and how easily it liberates during mineral processing.

The Company looks forward to updating shareholders on both fronts in due course.

 

Sample Assaying

Gold assaying is undertaken at an analytical laboratory located in Kapan in the south of Armenia. The laboratory is operated by the international SGS Laboratory Services company. Orogen inserts certified standards, blanks and duplicate samples into its sample batches to check the accuracy of the assay results.

 

About the Mutsk Project

The Mutsk Project is located in southern Armenia at about 2,000m elevation and is three and a half hours' drive from the capital Yerevan. The site is accessible most of the year other than during the core winter months.

Limited historic exploration had been carried out until drilling by Georaid CJSC in 2011, which intersected low sulphidation epithermal-type pyrite-gold mineralisation in altered and brecciated tuffs, similar in age and gold grade to those that host the Lydian International high sulphidation Amulsar gold deposit (4.1 million ounces in Measured, Indicated and Inferred Resources at an average grade of 1g/t Au) located 30km to the northwest, also in Armenia.

Orogen has an exclusive agreement with Georaid CJSC to earn an 80% interest in the property by spending a total of US$2.5m by the end of August 2016. 

-ENDS-

 

Approval

Ed Slowey, CEO of Orogen, is a Competent Person as defined by various international instruments and takes responsibility for the release of this information.

 

Enquiries:

 

Orogen Gold Plc

+353 1662 8395

Ed Slowey, CEO

Alan Mooney, FD

Cairn Financial Advisers LLP(Nominated Adviser)

+44 (0) 20 7148 7900

Avi Robinson / Liam Murray

 

Hume Capital Securities Plc (Broker)

+44 (0) 20 3693 1470

Jon Belliss

Walbrook (Public Relations and Investor Relations)

+44 (0) 20 933 8780

Paul Cornelius / Guy McDougall

 

About Orogen Gold

Orogen Gold plc is a UK public company quoted on the London Stock Exchange AIM market (ticker: ORE). The Company is focused on mineral exploration and development in Europe and is currently operating two gold exploration projects: a) at Mutsk in Armenia and b) at Deli Jovan in Serbia. The Mutsk gold project in Armenia was optioned by Orogen early in 2013 to follow-up reports of a new epithermal discovery within an established gold district. At Deli Jovan the historic high-grade gold mining camp was last in production prior to World War II and has been significantly under-explored in modern times. The Mutsk project has been prioritised by the Company due to the clear potential evident on the property.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQKODKABDDNBD
Date   Source Headline
15th Oct 20157:00 amRNSDiamond Drilling re-commences in Armenia
30th Sep 20154:52 pmRNS£450,000 Equity Fundraising
30th Sep 20157:00 amRNSAppt CEO, Grant of Options, Other Board Changes
30th Sep 20157:00 amRNSHalf Yearly Report
10th Jun 201512:29 pmRNSResult of AGM
11th May 20157:00 amRNSFinal Results for the year ended 31 December 2014
1st Apr 20157:00 amRNSSignificant Shareholder
27th Mar 20157:00 amRNSIssue of Equity
24th Mar 201512:17 pmRNSAppointment of Broker
20th Mar 201512:46 pmRNSRe: Broker
3rd Feb 20157:00 amRNSMutsk gold project update and Issue of Equity
19th Dec 20143:05 pmRNSResult of General Meeting
18th Dec 20147:00 amRNS4,000m Drilling Programme Completed on Schedule
25th Nov 201412:00 pmRNSPublication of Circular and Notice of GM
17th Nov 20147:00 amRNSFurther drilling extends gold discovery at Mutsk
3rd Nov 20147:00 amRNSChange of Adviser
20th Oct 20144:18 pmRNSDirector/PDMR Shareholding
20th Oct 20147:00 amRNSIssue of Equity and Total Voting Rights
16th Oct 20147:00 amRNSPlacing of £75,000 with Directors
14th Oct 20147:00 amRNSFurther drilling confirms continuity of gold zone
22nd Sep 20147:00 amRNSFurther drill assays extend gold discovery - Mutsk
16th Sep 20147:00 amRNSInterim Results
10th Sep 20147:00 amRNSPlacing raising £1.125m - further drilling - Mutsk
8th Sep 20147:00 amRNSDrilling - Wide zones of gold mineralisation
24th Jul 20147:47 amRNSAppointment of Director
7th Jul 20147:00 amRNSMobilisation of drill rig
1st Jul 20147:00 amRNSDrilling for Equity Agreement
3rd Jun 20147:00 amRNSMutsk Gold Project, Armenia - Operational Update
19th May 20141:25 pmRNSResult of AGM
23rd Apr 20147:00 amRNSFinal Results for the year ended 31 December 2013
7th Apr 20147:00 amRNSMutsk gold project - Operational Update
3rd Apr 20149:00 amRNSHolding(s) in Company
28th Mar 20144:16 pmRNSUK Investor Show - Saturday 5 April
3rd Mar 20147:00 amRNSMutsk results update and programme for Spring 2014
8th Jan 20149:56 amRNSHolding(s) in Company
19th Dec 20137:00 amRNSOperational Update
16th Dec 20132:08 pmRNSHolding(s) in Company
6th Nov 20137:00 amRNSDirector Resignation
23rd Oct 20132:16 pmRNSDrilling commences at Mutsk, Armenia
7th Oct 20133:00 pmRNSAnalyst Presentation
4th Oct 20137:00 amRNSFund raising to accelerate drilling at Mutsk
24th Sep 20137:00 amRNSInterim Results
30th Aug 201310:29 amRNSStakeholder Conference Call
30th Aug 20137:00 amRNSNew gold discovery confirmed at Mutsk, Armenia
30th Jul 20135:54 pmRNSStakeholder conference call completed
24th Jul 20137:00 amRNSStakeholder conference call
18th Jul 20137:00 amRNSAppointment of joint broker
4th Jul 20137:00 amRNSTrenching at Gindusa West - very high gold grades
9th May 201312:53 pmRNSResult of AGM
25th Apr 20137:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.