SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSosandar Regulatory News (SOS)

Share Price Information for Sosandar (SOS)

Share Price is delayed by 15 minutes
Get Live Data
11.00    0.00 (0.00%)
Bid:
10.50
Ask:
11.50
Spread: 1.00 (9.524%)
Market Cap: £24.00m
SOS Live PriceLast checked at - London Stock Exchange

Intraday Sosandar Share Chart

Mutsk Gold Project, Armenia - Operational Update

3 Jun 2014 07:00

RNS Number : 6488I
Orogen Gold PLC
03 June 2014
 



 

Orogen Gold plc

("Orogen" or the "Company")

 

Mutsk gold project, Armenia - Operational Update

Orogen Gold plc (AIM:ORE), the AIM quoted gold exploration company, provides the following update on the Company's Mutsk gold project in southern Armenia.

 

Highlights:

 

· Geophysical surveys extend target zone to minimum 2.4km strike

· IP and magnetic surveying show strongest anomalies in undrilled northern sector

· Drill testing planned on new northern target as well as extensions of previously drilled gold intervals

 

Ed Slowey, Chief Executive of Orogen, commented: "The IP geophysics programme has been very successful, having extended our target zone at Mutsk to almost 2.5 kilometres, with the zone remaining open towards the north. Magnetic surveying also shows an extensive area of what is interpreted as possible hydrothermal alteration, similar to that associated with gold mineralisation further south. We will now plan for drill testing of this target, as well as extensions of gold mineralisation encountered further south in earlier drill phases, with drilling due to commence shortly."

A detailed geophysical programme comprising Induced Polarisation, Resistivity and Magnetic surveys has been completed across the 2.5 square kilometre core target area of the Mutsk project in Armenia.

The magnetic survey data has assisted considerably in interpretation of fault structures which may exert control over distribution of mineralisation. Areas of low magnetism appear to reflect zones of hydrothermal alteration, including an area of about 600 metres by 200 metres that includes wider lower-grade gold intercepts reported from diamond drilling earlier this year.

Of particular interest is a large area of low magnetism, perhaps representing hydrothermal alteration, covering in excess of 800 metres by 600 metres in the northern part of the survey grid. This encompasses an extensive zone of mapped pyritic gossanous volcanics which is known to be gold-bearing based on previous chip/channel sampling. This target has not yet been drill tested.

The IP/Resistivity survey shows a north-south oriented chargeability/resistivity anomaly more or less coincident with the main mineralised structure at Mutsk across most of the lines surveyed, covering the full 2.4 kilometres strike length of the surveyed area. The anomaly appears to strike underneath cover rocks to the north and the target remains open in this direction.

The Directors have concluded from the IP survey and detailed geological mapping that the north-south structural zone with associated pyrite mineralisation, which is gold-bearing in several shallow drill holes completed to date in the southern part of the target area, may extend further than previously known along strike to the north over a total length of 2.4 kilometres. In addition, the anomaly increases in strength in this area which is partly coincident with the large area of possible hydrothermal alteration interpreted from the magnetics. The IP anomaly remains open to further extension to the north under shallow younger rock cover.

 

 

About the Mutsk Project

The Mutsk Project is located in southern Armenia at about 2,000m elevation and is three hours' drive from the capital Yerevan. The site is accessible most of the year other than during the core winter months. Maps showing the location and details of the project are available on the Company's website.

Limited historic exploration had been carried out until drilling by Georaid in 2011, which intersected low sulphidation epithermal-type pyrite-gold mineralisation in altered and brecciated tuffs, similar in age to those that host the Lydian International high sulphidation Amulsar gold deposit (4.1 million ounces in Measured, Indicated and Inferred Resources) located 30km to the northwest, also in Armenia.

Orogen has an exclusive agreement with Georaid CJSC to earn an 80% interest in the property by spending a total of US$2.5m by the end of August 2016.

 

-ENDS-

 

Approval

 

Ed Slowey, CEO of Orogen, is a Competent Person as defined by various international instruments and takes responsibility for the release of this information.

 

 

 

Enquiries:

 

Orogen Gold plc

+353 1662 8395

Ed Slowey, CEO

Alan Mooney, FD

 

WH Ireland Limited (Nominated Adviser and Broker)

+44 (0) 20 7220 1666

Tim Feather

James Bavister

 

Hume Capital Securities plc (Joint Broker)

Jon Belliss

 

 

Walbrook (Public Relations and Investor Relations)

+44 (0) 20 3693 1470

 

 

 

+44 (0) 20 933 8780

Paul Cornelius/Guy McDougall

 

 

 

 

About Orogen Gold

Orogen Gold plc is a UK public company quoted on the London Stock Exchange AIM market (ticker: ORE). The Company is focused on mineral exploration and development in Europe and is currently operating two gold exploration projects: a) at Mutsk in Armenia and b) at Deli Jovan in Serbia. The Mutsk gold project in Armenia was optioned by Orogen early in 2013 to follow-up reports of a new epithermal discovery within an established gold district. At Deli Jovan the historic high-grade gold mining camp was last in production prior to World War II and has been significantly under-explored in modern times.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSEFMEFLSEIM
Date   Source Headline
11th Jun 20261:07 pmRNSTransaction in Own Shares and Total Voting Rights
3rd Jun 20263:36 pmRNSNotification of major holdings
1st Jun 20263:40 pmRNSTransaction in Own Shares and Total Voting Rights
11th May 20263:27 pmRNSNotification of major holdings
5th May 20268:17 amRNSHolding(s) in Company
1st May 202611:48 amRNSHolding(s) in Company
30th Apr 20261:41 pmRNSTransaction in Own Shares and Total Voting Rights
23rd Apr 20269:25 amRNSHolding(s) in Company
21st Apr 20264:30 pmRNSHolding(s) in Company
14th Apr 20267:00 amRNSFull Year Trading Update
1st Apr 202610:31 amRNSResult of General Meeting
25th Mar 202612:00 pmRNSTransaction in Own Shares and Total Voting Rights
13th Mar 20267:00 amRNSNotice of General Meeting
13th Mar 20267:00 amRNSNotice of General Meeting
3rd Mar 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
20th Feb 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
13th Feb 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
6th Feb 20261:47 pmRNSTransaction in Own Shares and Total Voting Rights
2nd Feb 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
29th Jan 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
20th Jan 20262:00 pmRNSTransaction in Own Shares and Total Voting Rights
20th Jan 20267:00 amRNSBoard Change
19th Jan 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
16th Jan 20262:10 pmRNSNotification of major holdings
15th Jan 20267:00 amRNSTransaction in Own Shares and Total Voting Rights
13th Jan 20267:00 amRNSTrading Update
6th Jan 202612:00 pmRNSTransaction in Own Shares and Total Voting Rights
2nd Jan 20267:00 amRNSHolding(s) in Company
2nd Jan 20267:00 amRNSHolding(s) in Company
18th Dec 20252:24 pmRNSTransaction in Own Shares and Total Voting Rights
18th Dec 20252:24 pmRNSTransaction in Own Shares and Total Voting Rights
18th Dec 20257:00 amRNSRestructuring of executive share incentives
12th Dec 20254:49 pmRNSNotification of major holdings
26th Nov 20253:08 pmRNSNotification of major holdings
25th Nov 20257:00 amRNSHalf Year Results
21st Nov 202511:42 amRNSNotification of major holdings
20th Nov 20257:00 amRNSNotification of major holdings
13th Nov 20257:00 amRNSNotification of major holdings
10th Nov 20254:33 pmRNSNotification of Major Holdings
29th Oct 20257:00 amRNSNotice of Results and Investor Presentation
20th Oct 202510:18 amRNSDirector/PDMR Shareholding
20th Oct 20257:00 amRNSTransaction in Own Shares
16th Oct 20252:03 pmRNSHolding(s) in Company
16th Oct 202511:24 amRNSCapital Reduction - Effective
14th Oct 20254:00 pmRNSCapital Reduction - Court Approval
14th Oct 20257:00 amRNSHalf Year Trading Update
3rd Oct 202512:32 pmRNSHolding(s) in Company
2nd Oct 20255:22 pmRNSHolding(s) in Company
24th Sep 20252:56 pmRNSNotification of major holdings
23rd Sep 20255:35 pmRNSNotification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.