The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSosandar Regulatory News (SOS)

Share Price Information for Sosandar (SOS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.00
Bid: 11.50
Ask: 12.50
Change: 0.00 (0.00%)
Spread: 1.00 (8.696%)
Open: 12.00
High: 12.75
Low: 12.00
Prev. Close: 12.00
SOS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Final Results for the year ended 31 December 2013

23 Apr 2014 07:00

RNS Number : 2719F
Orogen Gold PLC
22 April 2014
 



23 April 2014

  

 

 

Orogen Gold

("Orogen" or the "Company")

 

Final Results for the year ended 31 December 2013

 

Orogen Gold plc (AIM: ORE), the AIM quoted gold exploration company, announces its audited results for the year ended 31 December 2013.

 

Operational Highlights

Mutsk gold project Armenia

· Agreed a Memorandum of Understanding ("MOU") with Georaid CJSC covering the Mutsk gold project in southern Armenia

o $2.5 million / 80% earn-in option on Mutsk gold property to be completed by the end of August 2016

o After year-end signed a full joint venture agreement to implement the terms of the MOU

· Positive confirmatory drilling results in mid-year followed by completion of a ten hole diamond drill programme in late 2013

o Orogen confirmatory drill holes returned substantially higher gold grades than previously reported, including 11.0m @ 5.56 g/t Au and 10.2m @ 5.73 g/t Au

o Mineralised zone confirmed by drilling over almost 1km of strike, with possible extension to over 2km

o First step-out drilling discovers wide gold zone at shallow depth - 59.5m @ 0.42 g/t Au and 42m @ 0.78 g/t Au

o Possibility of extensive lower-grade zones at shallow levels indicates potential for a large gold deposit at Mutsk

 

Deli Jovan, Serbia

· 1,426.2m drill programme completed at Gindusa West to follow up on high gold grade trenching results.

o High grade gold intervals at shallow depths beneath significant surface mineralisation

o Assay results include 0.5m @ 102 g/t Au and 0.7m @ 83 g/t Au

 

Financial and Corporate Highlights

 

· £650,000 raised before costs through the issue of 216,666,667 new ordinary shares at 0.3p per share, in October 2013

· Cash at 31 December 2013 of £1,208,000

· Loss for the year of £4.18 million, after an impairment charge of £3.7 million on the carrying value of the Deli Jovan exploration and evaluation asset. The Group's focus in the near term is on the Mutsk project and the Board considers it prudent to reduce the carrying value of the Group's interest (£1.75million) in Deli Jovan to reflect the exploration expenditures incurred on the project to date

· Appointment of Adam Reynolds as Non-Executive Chairman

 

 

Enquiries:

 

Orogen Gold Plc

+353 1662 8395

Ed Slowey, CEO

Alan Mooney, FD

WH Ireland Limited (Nominated Adviser and Joint Broker)

+44 (0) 20 7220 1666

Tim Feather

James Bavister

Hume Capital Securities plc (Joint Broker)

+44 (0) 20 3693 1470

Jon Belliss

Walbrook (Public and Investor Relations)

+44 (0) 20 933 8780

Paul Cornelius/ Guy McDougall

 orogengold@walbrookpr.com

 

 

Chairman's Statement

 

2013 was a difficult year for many junior gold exploration companies with a 28% fall in gold prices and a tight market for equity capital. Against this backdrop it has become increasingly important for junior explorers to focus their spending and to concentrate on executing efficient work programmes to recognise near term value for shareholders. Following a share placing in late 2012, Orogen entered the current year in a strong financial position to progress the Deli Jovan project in Serbia and to expand the asset base with the Mutsk project in Armenia.

 

Technical Progress and Mutsk Discovery

 

In January 2013 Orogen agreed a Memorandum of Understanding with Georaid CJSC covering the Mutsk gold project in southern Armenia. This represented a rare opportunity to acquire a project with early indications of significant gold mineralisation within an emerging epithermal gold district. Having been encouraged by the initial results achieved at Mutsk, Orogen moved quickly to advance the project and completed a ten-hole diamond drill programme in late 2013. Results from the programme included the exciting discovery of a new thicker, more extensive lower grade gold zone which is open along strike and down-dip. This opens up the possibility of substantial lower-grade zones at shallow levels and indicates potential for a large gold deposit at Mutsk.

 

At Deli Jovan a drill programme was completed at Gindusa West to follow up on high gold grade trenching results discovered in late 2012 and 2013. Significant gold-bearing intervals were encountered. Orogen is encouraged by the gold grades and widths encountered but continuity of the gold-bearing veins has proved more difficult to establish. Following an impairment review of the carrying value of exploration and evaluation assets, an impairment charge of £3.7 million has been made against the carrying value of the Deli Jovan asset. The Company remains committed to the Deli Jovan gold project and in conjunction with our partner on the project, Orogen is reviewing the results encountered to date to identify a 2014 work programme to advance the project.

 

Corporate

 

I was pleased to be appointed Chairman of Orogen in November 2013, following the resignation of John Barry from the Board as non-executive Chairman. Ed Slowey and Alan Mooney continue as Chief Executive and Finance Director respectively and Michael Nolan remains as a Non-Executive Director.

 

In October 2013, the Company raised £650,000 before costs through the issue of 216,666,667 new ordinary shares at 0.3p per share. At 31 December 2013 the Group held cash resources of £1,208,000 (2012: £1,621,000).

 

The Year Ahead

 

With a challenging market for juniors expected to continue in 2014, it is important for companies to have a flexible approach to the development of their projects. Orogen is very excited about the prospects for the Mutsk gold project and will continue to prioritise the development of the project over the coming months, working towards the delineation of a resource within the near-surface Mutsk gold discovery.

 

Adam Reynolds

Chairman

 

22 April 2014

Strategic Report

 

Strategy and Objectives

 

The principal activity of Orogen Gold is the development of mineral exploration and production projects in Europe, with an emphasis on gold exploration and project development.

 

Orogen's strategy is to acquire prospective early-stage growth opportunities at a low entry cost within the European arena. The three steps in the Orogen strategy are to:

 

(1) Identify and secure low entry cost gold projects in underexplored and frontier locations in Europe;

(2) Undertake an efficient cost controlled programme of project evaluation and appraisal; and

(3) Move to establish gold resources at an early stage.

 

Orogen currently operates two gold exploration projects.

 

The Mutsk Gold Project ("Mutsk") is located in the Syunik Province in southern Armenia 210km southeast of the capital city Yerevan at about 2,000m elevation.

 

Orogen has an exclusive Joint Venture agreement with Georaid CJSC ("Georaid"), an Armenian registered company, to earn an 80% interest in Mutsk by incurring a total of US$2.5 million in exploration expenditure on the project by the end of August 2016. Limited historic exploration had been carried out until drilling by Georaid in 2011, which intersected low sulphidation epithermal-type pyrite-gold mineralisation in altered and brecciated tuffs, similar in age to those that host the Lydian International high sulphidation Amulsar gold deposit located 30km to the northwest, also in Armenia. Confirmatory drilling by Orogen has demonstrated both higher gold grades than previously reported and wider zones of lower grade mineralisation.

 

The Company's second gold exploration project, the Deli Jovan Gold Project ("Deli Jovan"), is located in the Zajecar municipality in eastern Serbia approximately 250km from Belgrade.

 

Under the terms of an earn-in agreement with Reservoir Minerals Inc. ("Reservoir"), a company listed on the TSX Venture Exchange (ticker: RMC), Orogen received the exclusive right to earn-in to an initial 55% interest in Deli Jovan by committing CAD$1.5 million to the project by 23 June 2012. This earn-in was completed in June 2012 and Orogen has the exclusive option to earn-in to an additional 20% interest by incurring total exploration expenditures on the project of CAD$3.5 million (an additional CAD$2.0 million) by 23 December 2013. Orogen is reviewing the completion of the additional 20% earn-in with Reservoir. Deli Jovan is an historic gold mining camp which was last in production prior to World War II with the major part of gold production taking place during the period from 1900 to 1912. There are two former gold mines within the Deli Jovan exploration permit area and there had been no systematic exploration of the property since mining ceased in 1938. There is clear evidence that significant mining activity occurred on the property episodically from Roman times to the earlier part of the last century.

 

Mutsk Gold Project

 

In January 2013, Orogen signed a Memorandum of Understanding ("MOU") on the Mutsk Gold Project in Southern Armenia. Our initial aim was to confirm the potential of a low-sulphidation gold epithermal system discovered by our partner, Georaid, in 2011 through a programme of shallow vertical drilling. Orogen's verification work comprised re-logging and sampling of existing drill core, as well as detailed mapping and sampling in the under-explored permit area.

 

Orogen believed that the original sampling during the 2011 drill programme may have understated the grades and widths of the mineralisation zone, as not all drill core was sampled and the sampling process may not have been fully compliant with best practice. Re-sampling of most of the historic core was carried out under Orogen's supervision, with tighter quality control over the process. This confirmed substantially higher grades and greater widths than reported previously. Confirmatory drilling in Q2 2013 of six short vertical and angled holes undertaken by Orogen repeated the higher tenor of gold grades, with assay intervals including 11.0m @ 5.56 g/t Au (hole OG13-01) and 10.2m @ 5.73 g/t Au (hole OG13-02). The re-sampling and drilling programme undertaken by the Company suggested that the mineralised zone extends over almost 1km of strike, with possible extension to over 2km. The results demonstrated an exciting new gold discovery at shallow depths within an established epithermal district.

 

Following interpretation of the results of the initial drill programme at Mutsk, Orogen agreed with Georaid to move into Phase 2 of the programme detailed under the MOU which includes an exclusive option to earn-in to an 80% interest in the project. A full Joint Venture Agreement was drawn up and signed in February 2014 to implement the terms of the MOU.

 

Following a share placing in October 2013, Orogen accelerated the Mutsk evaluation and appraisal programme and in Q4 2013 successfully completed a 10-hole diamond drill programme totalling 921.2 metres. Short vertical and angled diamond drill holes were laid out to test the continuity of the north-south zone of hydrothermal alteration and epithermal gold mineralisation previously located by widely-spaced drilling. Logging of drill core from several holes identified zones of kaolinite-sericite-quartz alteration which is associated with gold mineralisation in earlier drill holes. Assay results suggest that the higher grade gold values seen to date are centred around structural loci and/or intrusive quartz-diorite dykes along the southern part of the Mutsk trend. These high grade centres appear to be linked to a newly-discovered wider zone of interest.

 

An extensive interval of hydrothermal alteration and lower-grade gold mineralisation was located in angled hole OG13-15 along profile 3610N which was stepped out about 60m to the west of previously recorded high grade intercepts in vertical holes OG13-01 (11m @ 5.56 g/t Au) and DDB-04 (39m @ 3.64 g/t Au). An intercept of 59.5m from 28.0m to 86.5m down-hole depth in OG13-15 averaged 0.42 g/t Au, including an interval of 8.0m @ 0.87 g/t Au. Another angled hole, OG13-04, drilled previously closer to the original high-grade intercepts, had cut 42m @ 0.78 g/t Au, including 9m @ 2.5 g/t Au. While the true width of these two longer intercepts is not yet clearly established, current interpretation suggests that they may be close to true width. This is the first drill profile to test the interpreted down-dip extension of the main mineralised trend at Mutsk and opens up the possibility of extensive lower-grade gold zones at shallow levels. These new intercepts are not dissimilar in width and gold tenor to some of those reported at the Lydian International's Amulsar gold project which is currently at feasibility stage.

 

Deli Jovan Gold Project

 

Following excellent trenching results from work carried out in 2012 at Deli Jovan, the Board took the decision to prioritise drilling to focus on shallow testing of the high grade trench discoveries at Gindusa West.

 

Exploration undertaken during the year included further high-density soil sampling, followed by step-out trenching from the 2012 discovery trench, TAG-2 (3m @ 29.6 g/t Au), in order to extend and define the mineralised zone.

 

Highlights of the 2013 work based on channel sample assaying include a 3.5m intercept grading 61.42 g/t Au including a 2m zone assaying 107 g/t Au in trench T6, on a separate structure to the north of the TAG-2 intercept. A further 350m to the northwest, trench T8 intersected a mineralised shear zone assaying 5.75 g/t Au over 2.0m, including 1m @ 8.88 g/t Au.

 

Interpretation of the results received indicated that the main gold-mineralised, steeply north-dipping east-west shear structure intersected in trench TAG-2 extends for at least 300m. Widths of mineralised structures ranged from 1.0-13.0m and gold grades ranged from 1.44-29.55 g/t Au. The continuity and width of this zone at surface was considered particularly encouraging as previously mapped vein structures at Deli Jovan tend to be narrower and of shorter strike extent. 

 

A programme of 15 short, angled drill holes totalling 1,426.2m was completed at Gindusa West in Q3 2013 to test the sub-surface extensions of the mineralised zones encountered in trenching. Holes were drilled on seven profiles 40m apart, covering much of the 300m strike length of the complex shear zone.

 

Significant gold-bearing intervals from the drill programme included 0.5m @ 102 g/t Au (hole DE-GEA06), 0.7m @ 83 g/t Au (hole DE-GEA10) and 5.1m @ 3.04 g/t Au (hole DE-GEA14). Continuity of the shear zone was confirmed along strike and as far as the drilled depth of 80-90m vertically. Quartz veining and gold-bearing pyrite mineralisation within the zone however appear to be irregularly distributed, with some locally very high grade intercepts, sometimes enveloped by lower grade haloes.

 

Financial

 

The loss for the year amounted to £4,176,000 (2012: £651,000). The loss for the year comprised general and administrative expenses of £493,000 (2012: £499,000), a share based payment charge of £1,000 (2012: £196,000), an impairment charge of £3,702,000 (2012: nil) and finance income of £20,000 (2012: £37,000). The impairment charge is as a result of a review performed on the carrying value of the exploration and evaluation assets related to the Deli Jovan Gold Project.

 

FUTURE DEVELOPMENTS

 

Mutsk Gold Project

 

Orogen is now preparing for the re-commencement of exploration at Mutsk after the spring snow-melt. Plans include completion of a ground geophysical survey to trace known mineralisation along strike and down-dip beneath overburden and cover rocks as well as searching for new, previously unidentified, targets. Further drilling will focus on delineation of both high grade and more extensive low-grade gold mineralisation, as well as follow-up of targets defined by soil sampling and geophysical surveying. Only a small part of the prospective target has been drill tested to date and newly-identified zones of wide, lower grade mineralisation further support the potential for a large gold deposit at Mutsk.

 

The Company plans to focus its work on Mutsk in the early part of 2014 because the positive results received to date suggest that this has strong potential for discovery of shallow gold mineralisation at relatively low exploration cost compared to the Deli Jovan project.

 

Deli Jovan Gold Project

 

Orogen is continuing to review the 2013 drilling results in tandem with the surface trench data in order to assess the potential for definition of a shallow gold resource at the Gindusa West and Gindusa Mine zones. The Company is encouraged by some of the high grades and widths encountered. The mineralised vein systems appear to continue to depth, however the continuity along strike is less clear and detailed infill drilling could be required to establish the extent of such continuity.

 

Orogen has the exclusive option to earn-in to an additional 20% interest in Deli Jovan beyond its current 55% interest. The Company is currently reviewing the earn-in and a future work programme on the project with its partner, Reservoir.

 

 

 

Ed Slowey Alan Mooney

Director Director

 

22 April 2014

 

 

Consolidated statement of profit or loss and other comprehensive income

For the year ended 31 December 2013

 

2013

2012

£'000

£'000

Continuing operations

Revenue

-

7

Operational costs

-

-

Gross profit

-

7

General and administrative expenses

(493)

(499)

Share based payments

(1)

(196)

Impairment of exploration and evaluation assets

(3,702)

-

Group operating loss

(4,196)

(688)

Finance income

20

37

Loss on ordinary activities before taxation

(4,176)

(651)

Tax on loss on ordinary activities

-

-

Loss for the year from continuing operations

(4,176)

(651)

 

Attributable to:

Equity holders of the parent

(4,175)

(651)

Non-controlling interests

(1)

-

Group loss for the year

(4,176)

(651)

Exchange translation differences

16

17

Total comprehensive loss for the year

(4,160)

(634)

 

Attributable to:

Owners of the parent

(4,159)

(634)

Non-controlling interests

(1)

-

 

(4,160)

(634)

 

Loss per share:

Loss per share - basic and diluted, attributable to ordinary equity holders of the parent (pence)

(0.19)

(0.03)

 

 

 

 

 

 

Consolidated statement of financial position

As at 31 December 2013

 

 

2013

2012

£'000

£'000

Assets

Non-current assets

Exploration and evaluation assets

2,136

4,986

Property, plant and equipment

22

23

Total non-current assets

2,158

5,009

Current assets

Trade and other receivables

82

368

Cash and cash equivalents

1,208

1,621

Total current assets

1,290

1,989

Total assets

3,448

6,998

Equity and liabilities

Equity

Share capital

3,057

2,841

Share premium

11,704

11,325

Other reserves

625

729

Retained earnings

(12,431)

(8,377)

Equity attributable to owners of the parent

2,955

6,518

Non-controlling interests

402

403

Total equity

3,357

6,921

Current liabilities

Trade and other payables

91

77

Total current liabilities

91

77

Total liabilities

91

77

Total equity and liabilities

3,448

6,998

 

 

Consolidated statement of cash flows

For the year ended 31 December 2013

 

 

2013

2012

£'000

£'000

Cash flows from operating activities

Group operating loss

(4,196)

(688)

Decrease/(increase) in trade and other receivables

289

(272)

Increase/(decrease) in trade and other payables

14

(156)

Impairment of exploration and evaluation assets

3,702

-

Share based payments

1

196

Net cash flow from operating activities

(190)

(920)

Cash flow from investing activities

Expenditure on exploration and evaluation assets and project earn-in

(852)

(1,016)

Net cash inflow on acquisition of subsidiary

-

130

Bank interest received

20

37

Net cash flow from investing activities

(832)

(849)

 

Cash flow from financing activities

Net proceeds from issue of equity instruments

595

1,360

Net cash flow from financing activities

595

1,360

 

Net change in cash and cash equivalents

(427)

(409)

Net foreign exchange difference

14

26

Cash and cash equivalents at beginning of year

1,621

2,004

Cash and cash equivalents at end of year

1,208

1,621

 

 

 

 

  

Consolidated statement of changes in equity

For the year ended 31 December 2013

 

 

 

 

 

Share capital

 

 

 

Share premium

 

 

Share based payment reserve

 

 

 

Retained earnings

 

Foreign currency translation reserve

 

 

 

 

Total

 

 

Non-controlling

interests

 

 

 

 

Total equity

£'000

£'000

£'000

£'000

£'000

£'000

£'000

£'000

Balance at 1 January 2012

2,567

10,239

516

(7,726)

-

5,596

-

5,596

Loss for the year

-

-

-

(651)

-

(651)

-

(651)

Share based payments

-

-

196

-

-

196

-

196

Foreign exchange translation reserve

-

-

-

-

17

17

-

17

Acquisition of subsidiary

-

-

-

-

-

-

403

403

Issue of share capital

274

1,086

-

-

-

1,360

-

1,360

Balance at 31 December 2012

2,841

11,325

712

(8,377)

17

6,518

403

6,921

Balance at 1 January 2013

2,841

11,325

712

(8,377)

17

6,518

403

6,921

Loss for the year

-

-

-

(4,175)

-

(4,175)

(1)

(4,176)

Share based payments

-

-

(120)

121

-

1

-

1

Foreign exchange translation reserve

-

-

-

-

16

16

-

16

Issue of share capital

216

379

-

-

-

595

-

595

Balance at 31 December 2013

3,057

11,704

592

(12,431)

33

2,955

402

3,357

 

 

 

 

Notes

 

1 Financial Information

 

The financial information set out above does not constitute the Company's statutory accounts for the year ended 31 December 2013, but is derived from those accounts. The auditors have reported on those accounts; their report was unqualified and did not draw attention to any matters by way of emphasis without qualifying their report.

 

2 Loss per Share

 

Basic loss per share is calculated by dividing the loss attributable to equity shareholders by the weighted average number of ordinary shares in issue during the period:

 

2013

2012

Loss after tax attributable to equity holders of the parent (£'000)

(4,175)

(651)

Weighted average number of ordinary shares in issue (share in millions)

2,220

1,955

Fully diluted average number of ordinary shares in issue (share in millions)

2,220

1,955

Basic and diluted loss per share (pence)

(0.19)

(0.03)

 

Basic and diluted earnings per share are the same, since where a loss is incurred the effect of outstanding share options and warrants is considered anti-dilutive and is ignored for the purpose of the loss per share calculation. The share options outstanding as at 31 December 2013 totalled 225,000,000 (2012: 265,000,000) and are potentially dilutive.

 

3 Exploration and Evaluation Assets

 

Armenia

 

Serbia

 

Total

£'000

£'000

£'000

Cost

 

 

 

At 1 January 2012

-

-

-

Acquisition of Deli Jovan Exploration d.o.o.

-

1,132

1,132

Transfers

-

3,173

3,173

Additions

-

681

681

At 31 December 2012

-

4,986

4,986

Carrying value 31 December 2012

-

4,986

4,986

Cost

 

 

 

At 1 January 2013

-

4,986

4,986

Additions

387

465

852

At 31 December 2013

387

5,451

5,838

Impairment

 

 

 

At 1 January 2013

-

-

-

Impairment charge

-

3,702

3,702

At 31 December 2013

-

3,702

3,702

Carrying value 31 December 2013

387

1,749

2,136

 

As part of the annual impairment review of asset carrying values, a charge of £3,702,000 was recorded in relation to the Deli Jovan project in Serbia.

 

A multiple of exploration expenditure method was used when calculating the recoverable value of the project. As there is not yet an established mineral resource for the project, a discounted cash flow model was not appropriate. Orogen has the exclusive option to earn-in to an additional 20% interest in Deli Jovan beyond its current 55% interest. The Company is currently reviewing the earn-in and a future work programme with its partner on the project.

4 Events after the Reporting Period

 

In February 2014 the Company, through its wholly owned subsidiary Orogen Gold (Armenia) Limited, signed a Joint Venture Agreement with Georaid CJSC ("Georaid"), an Armenian registered company and holder of Exploration Licence EHTV 29/066 ("Mutsk gold project"), granting the Company an exclusive option to earn-in to the Mutsk gold project in southern Armenia. Under the Joint Venture Agreement the Company has the option to acquire an 80% undivided interest in Georaid by incurring exploration expenditures of US$2.5 million by 31 August 2016.

 

5 Annual Report and Annual General Meeting

 

The Annual Report for the year ended 31 December 2013 will be posted to shareholders on 25 April 2014 and will be available to download from the Company's website at www.orogengold.com on 25 April 2014.

 

The Annual General Meeting of Orogen Gold plc will be held at Finsgate, 5-7 Cranwood Street, London EC1V 9EE on 19 May 2014 at 12.00 noon. Notice of the AGM is now available on the Company's website at www.orogengold.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FR LFFLISSIFFIS
Date   Source Headline
16th Apr 20247:00 amRNSFull Year Trading Update
10th Jan 20247:00 amRNSTrading Update
15th Dec 20237:00 amRNSBoard Changes
12th Dec 20237:00 amRNSHalf Year Results
29th Nov 20237:00 amRNSNotice of Results and Investor Presentations
9th Nov 20237:00 amRNSMello Investor Presentation
18th Oct 20237:00 amRNSTrading & Strategic Update
13th Oct 20237:00 amRNSNotice of Trading Update
5th Oct 20232:25 pmRNSHolding(s) in Company
21st Sep 20231:02 pmRNSResult of AGM
25th Aug 20239:45 amRNSNotice of AGM and Posting of Annual Report
11th Jul 20237:00 amRNSFinal Results
4th Jul 20237:00 amRNSNotice of Results and Investor Presentation
17th Apr 20233:13 pmRNSHolding(s) in Company
13th Apr 20232:28 pmRNSHolding(s) in Company
12th Apr 20237:00 amRNSTrading Update & Progress on Growth Strategy
16th Mar 20237:00 amRNSAppointment of Interim Non-Executive Chairman
3rd Mar 20238:12 amRNSDirector/PDMR Dealing
17th Feb 20233:54 pmRNSResult of Retail Offer
17th Feb 20237:00 amRNSClose of Retail Offer
14th Feb 20232:51 pmRNSHolding(s) in Company
13th Feb 202311:55 amRNSHolding(s) in Company
8th Feb 20234:40 pmRNSSecond Price Monitoring Extn
8th Feb 20234:35 pmRNSPrice Monitoring Extension
8th Feb 20231:30 pmRNSResult of Placing
8th Feb 20239:16 amRNSRetail Offer
8th Feb 20237:00 amRNSProposed Placing to raise a minimum of £4 million
6th Feb 20237:00 amRNSDeath of Director
23rd Jan 20237:00 amRNSNew Third Party Arrangement
10th Jan 20237:00 amRNSTrading Update
13th Dec 20227:00 amRNSHalf Year Results
17th Nov 20227:00 amRNSNotice of Results and Investor Presentation
15th Nov 20225:25 pmRNSAIM Rule 17 Schedule 2(g) Update
18th Oct 20227:00 amRNSHalf Year Trading Update
15th Sep 20223:24 pmRNSResult of AGM & Notice of Trading Update
22nd Aug 20227:00 amRNSNotice of AGM and Posting of Annual Report
18th Aug 20227:00 amRNSBoard Changes and Change of Auditor
12th Jul 20227:00 amRNSFinal Results
24th Jun 20227:00 amRNSNotice of Results and Investor Presentation
10th Jun 20223:31 pmRNSDirector/PDMR Shareholding
6th May 202212:55 pmRNSDirector/PDMR Dealing
14th Apr 20227:00 amRNSBoard Appointment
6th Apr 20222:05 pmRNSSecond Price Monitoring Extn
6th Apr 20222:00 pmRNSPrice Monitoring Extension
6th Apr 20227:00 amRNSTrading Update and New Third Party Arrangements
6th Jan 20227:00 amRNSTrading Update
20th Dec 20219:00 amRNSExercise of Warrants and Total Voting Rights
30th Nov 20217:00 amRNSHalf Year Results
12th Nov 20217:00 amRNSNotice of Results
7th Oct 202111:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.