focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSan Leon Regulatory News (SLE)

  • This share is currently suspended. It was suspended at a price of 16.14

Share Price Information for San Leon (SLE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 16.14
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 16.14
SLE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rawicz Commercial Gas Discovery

25 Feb 2015 07:01

RNS Number : 7803F
San Leon Energy PLC
25 February 2015
 



25 February 2015

 

San Leon Energy plc

 

Rawicz Commercial Gas Discovery

 

San Leon Energy plc ("the Company" or "San Leon"), the AIM listed company focused on oil and gas exploration in Europe and North Africa, announces highly positive well test results for Rawicz-12, which the Company expects will form its first commercial gas discovery.

 

The Rawicz-12 appraisal well, located in south-western Poland, commenced flow testing on 5 February 2015 and has to date flowed at an increasing rate of up to 4.1 mmscf (million standard cubic feet) per day. No significant amounts of water have been encountered and gas quality matches expectations. Well productivity, gas production rate and surface flowing pressure continually increased during the long high-rate flow period.

 

The Company anticipates that an additional three to five wells will be drilled to develop the field, with the second well on Rawicz already in planning and being at no up-front cost to the Company. Gas prices in Poland are amongst the highest in Europe.

 

Rawicz-12 Well Testing Details

 

The Rawicz-12 appraisal well, drilled to appraise the previously-discovered, unproduced Rawicz gas field, was opened up to flow on 5 February 2015. Since then, apart from a short pressure build-up performed to gain technical data, the well has been continuously flowed to flare.

 

The well flow rate and flowing wellhead pressure steadily increased (indicating a progressive clean-up of the well) and by the morning of 16 February 2015 the gas production rate was approximately 4.1 mmscf/d, and increasing, at a flowing wellhead pressure of 205 psig (pounds per square inch) on a fixed choke of 80/64". The reservoir volume tested is determined largely by the length of the flow period, and is relatively insensitive to flow rate. Therefore on 16 February 2015, and with flow rate and pressure still increasing, the decision was taken in conjunction with Baker Hughes (the well testing advisors) to choke the well back to limit the flaring of gas for the remainder of the flow period. It should be stressed that the choking back of the well was solely to reduce wasted reserves.

 

No material water has been produced, and no hydrogen sulphide gas (H2S) has been recorded. Gas quality matches expectations and samples from previous wells in the field, at around 70% methane.

 

Preliminary evaluation of the data received so far indicates a permeability to gas of around 2mD, confirming the success case assumption that the field can be developed as a "conventional" resource.

 

The process of cleaning up of the well involves the removal of reservoir "skin" from the drilling and completion process. Skin is an engineering measure of how much the rock near the wellbore is affected by that process, with higher values indicating more restriction to production. The skin value is currently estimated to be around 7 - a relatively high figure - although flowing the well has already significantly reduced it to 7 from initial values. Calculations suggest that a much lower skin factor could increase the gas flow rate at these flowing conditions by around a half. Such a material flow rate upside could be achieved under several scenarios whereby the skin is reduced or bypassed, including:

 

1) Continued cleaning up of the well

2) Performing stimulation (deep penetrating perforating, or hydraulic fracture) on the well to bypass remaining skin as much as possible

3) Reducing skin in future wells through modification of the drilling and completion programme.

 

Rawicz-12 has been flowed only over the upper half of the gas-bearing interval, in order to minimise water production during the test. The absence of water production could enable future wells to be completed to a greater depth (where water saturation increases), increasing the flowing interval thickness and therefore the gas production rate. The existing well is vertical through the reservoir, meaning that deviated or horizontal wells during a development could be used to target still higher production rates.

 

It is expected that the well will complete its flow testing on 28 February 2015, following which pressure build-up data will be acquired for several weeks. This data measures the shut-in pressure response of the well, enabling reservoir characteristics such as permeability and volumetrics to be refined.

 

The Rawicz project is operated by Palomar Natural Resources ("Palomar") with 65% equity, and San Leon has no up-front drilling costs for its 35% equity share of the first two wells.

 

Oisin Fanning, San Leon Executive Chairman, commented:

 

"This is the well we have been waiting for - a significant gas discovery in one of the highest-priced gas markets in Europe. The Rawicz field has existing gas infrastructure nearby and a development feasibility project has already been completed.

 

This well is transformational for the Company, a step towards energy independence for Poland, and the first of what we anticipate will be a series of such wells for San Leon in the Rawicz field and elsewhere in Poland. These results are gratifying for the management and staff of San Leon Energy and are expected to be beneficial for our shareholders. I would like to thank our investors for their patience, and congratulate the on-site team for a job well done. We look forward to updating the market on the full interpreted results of Rawicz-12, and the next steps for the Rawicz field."

 

 

Joel Price, San Leon Chief Operating Officer, commented:

 

"The preliminary results of the well test are extremely encouraging, showing good permeability to gas and no water production. The data quality is high, as downhole shut in is being used (improving the ability to interpret pressure build up data in a gas well), and this gives confidence in the technical interpretation so far. The high flow rate of over 4 mmscf per day has been achieved even in the presence of what is believed to be a significant (and reducing) remaining reservoir skin, and without flowing the lower part of the reservoir, highlighting the flow rate upside in Rawicz. Once the full test and the final pressure build-up data have been acquired, the interpretation will be completed and will be used as input to defining the next steps for the Rawicz field."

 

Qualified personJoel Price, who has reviewed this update, has 20 years' experience in the oil & gas industry and is a member of the Society of Petroleum Engineers. He holds a BA in Natural Sciences from Cambridge University, an MEng from Heriot-Watt University, and an MBA from Durham University. Joel is Chief Operating Officer for San Leon Energy and is based in San Leon's London office.

 

For further information contact:

San Leon Energy plc 

Oisin Fanning, Executive Chairman

 

+353 1291 6292

finnCap Ltd 

Corporate FinanceMatt Goode

Christopher RaggettCorporate BrokingJoanna Weaving

 

+44 (0) 20 7220 0500

Brandon Hill Capital

Oliver StansfieldJonathan Evans 

 

+44 (0) 20 3463 5000

Macquarie Capital (Europe) LimitedJon FitzpatrickNicholas Harland

 

+44 (0) 20 3037 2000

Westhouse Securities LtdNominated AdviserRichard JohnsonAntonio Bossi

 

+44 (0) 20 7601 6100

Vigo CommunicationsFinancial Public RelationsChris McMahon

Alexandra Roper

 

+44 (0) 20 7016 9572

Plunkett Public RelationsSharon Plunkett

+353 (0) 1 280 7873

 

www.sanleonenergy.com

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTIMBTMBTTTFA
Date   Source Headline
25th Jun 201911:12 amRNSAkaso-15 Well Test & OML18 Drilling Update
24th Jun 20199:03 amRNSHolding(s) in Company
30th May 20193:06 pmRNSHolding(s) in Company
17th May 201911:05 amRNSDirectorate Change
1st Apr 20192:54 pmRNSHolding in Company
22nd Mar 20197:00 amRNSResult of Tender Offer
15th Mar 201912:00 pmRNSResult of Extraordinary General Meeting
12th Mar 201912:34 pmRNSHolding in Company
6th Mar 20197:00 amRNSHolding in Company
28th Feb 20197:00 amRNSAkaso-15 Well Completed, Rig Moving to PMMO-1
20th Feb 20197:00 amRNSProposed $30m Tender Offer at 46p per share
8th Jan 20197:00 amRNSEroton Successfully Refinances OML 18 RBL
21st Dec 20187:00 amRNSReceipt by Eroton - Further NNPC Cash Call Arrears
18th Dec 20187:00 amRNSShare Buyback & SunTrust Exit Update
10th Dec 20187:00 amRNSRig Preparing to Spud OSMU-1 Well on OML 18
1st Oct 20187:00 amRNSMidwestern Becomes Significant Shareholder
28th Sep 20184:19 pmRNSResult of General Meeting and Directorate Change
25th Sep 20187:00 amRNSHalf-year Report
20th Sep 201810:29 amRNSUpdate on Barryroe Farm-Out Agreement
3rd Jul 20187:00 amRNSPayment Received Against MLPL Loan Notes
29th Jun 20187:00 amRNSNotice of AGM
29th Jun 20187:00 amRNSFinal Results
20th Jun 20184:35 pmRNSPrice Monitoring Extension
31st May 20184:40 pmRNSSecond Price Monitoring Extn
31st May 20184:35 pmRNSPrice Monitoring Extension
24th May 20184:18 pmRNSUpdate on Dispute with SunTrust Oil
24th May 20188:50 amRNSAppointment of Non-Executive Director
22nd May 20187:00 amRNSComment on News Article
9th May 20182:50 pmRNSComment on News Article
3rd May 20184:35 pmRNSPrice Monitoring Extension
24th Apr 20187:00 amRNSAppointment of Nomad, Financial Adviser and Broker
23rd Apr 20187:30 amRNSRestoration - San Leon Energy Plc
23rd Apr 20187:00 amRNSResumption of Trading
3rd Apr 20187:00 amRNSPayment Received Against MLPL Loan Notes
28th Mar 201810:37 amRNSBarryroe Farm-Out Update Agreement
21st Feb 20187:00 amRNSOperating and Corporate Update
16th Jan 201811:40 amRNSAppointment of Non-Executive Director
5th Jan 20187:00 amRNSUpdate on Discussions with Potential Offerors
2nd Jan 20183:00 pmRNSForm 8.3 - San Leon Energy plc
2nd Jan 20187:05 amRNSShares In Issue
2nd Jan 20187:00 amRNSUpdate on Convertible Loan Facility
21st Dec 20176:28 pmRNSReplacement: Issue of Equity
21st Dec 201710:47 amRNSIssue of Equity
19th Dec 20176:15 pmRNSConvertible Loan Facility and Repayment of Avobone
8th Dec 20173:10 pmRNSUpdate on discussions with Midwestern
5th Dec 20177:00 amRNSRelinquishment of certain Polish assets
24th Nov 20174:51 pmRNSAvobone Court Petition Withdrawn
10th Nov 20176:19 pmRNSUpdate on Avobone settlement agreement
6th Nov 201710:32 amRNSForm 8.3 - San Leon Energy PLC
3rd Nov 20176:25 pmRNSDiscussions with Midwestern

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.