Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Barryroe Well Testing Update

23 Mar 2012 10:03

RNS Number : 9517Z
San Leon Energy PLC
23 March 2012
 



23 March 2012

 

San Leon Energy Plc

("San Leon" or the "Company")

 

Barryroe Well Testing Update

 

San Leon, the fast growing oil and gas company with an extensive portfolio of assets across Europe and North Africa, notes this morning's announcement from Providence Resources plc ("Providence") updating on the Barryroe well. San Leon announced, on 23 December 2011, that the Company has assigned its 30% working interest in Standard Exploration Licence 1/11 to Providence in exchange for a 4.5% NPI on the full field. San Leon Energy will not pay any further appraisal or development costs on the Licence and is not paying any costs towards the 48/24-10 well.

 

 

The full announcement by Providence stated the following:

BARRYROE WELL TESTING UPDATE

·; UPPER GAS BEARING RESERVOIR PROVES TO BE HIGHLY PRODUCTIVE

·; WELL NOW SUSPENDED AND RIG DEMOBILISATION UNDERWAY 

Providence Resources P.l.c., ('Providence') the London (AIM) and Dublin (ESM) quoted oil and gas exploration and production company is pleased to provide a final testing update from its Barryroe well, offshore southern Ireland. The 48/24-10z Barryroe appraisal well is located in c. 100 metre water depth, c. 50 kilometres offshore Ireland in Standard Exploration Licence (SEL) 1/11 in the North Celtic Sea Basin. Providence (80%) operates SEL 1/11 on behalf of its partner Lansdowne Oil & Gas plc (20%).

 

Following the successful testing of the lower basal 24' net oil bearing interval, which flowed c. 3,514 BOPD & 2.93 MMSCFGD (c. 4,000 BOEPD, see RNS announcement of March 15th), an additional 17' thick net gas bearing section was perforated to test the potential of the upper part of the basal Wealden sandstone section. The surface test spread equipment was optimized for the lower oil zone test and was therefore equipment constrained on this gas zone test, which achieved highly productive flow rates of c. 7 MMSCFGD & 1,350 BOPD (c. 2,516 BOEPD) through a restricted 36/64" choke, with a flowing well head pressure of c. 1,700 psig. The productivity of the gas bearing interval far exceeded expectations and thereby constrained the ability to fully open the well up to its maximum potential. Preliminary modeling of the pressure data indicates that a co-mingled flow rate of c. 17 MMSCFGD & 3,350 BOPD (c. 6,183 BOEPD) at a flowing well head pressure of c. 500 psig is achievable. Well suspension operations are now complete and the rig will be demobilized to the UK imminently.

 

Commenting on this further successful test, Tony O'Reilly, CEO of Providence said:

 

"We are very pleased to confirm that the gas zone was far more productive than we had anticipated. The well lies just 3 km from installed pipeline infrastructure which may provide a future route to monetize any surplus Barryroe gas production. It is particularly pleasing to note that both the oil and gas zones have far exceeded our pre-drill expectations, both in terms of reservoir development and more importantly, oil and gas flow rates. I once again wish to express our thanks to all involved in this testing programme, which has demonstrated such a substantial cumulative flow rate potential from this vertical Barryroe appraisal well."

 

 

 

For further information contact:

 

 

San Leon Energy Plc

Tel: + 353 1291 6292

Oisin Fanning, Executive Chairman

 

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

Paul Connolly

John Dwyer

 

Westhouse Securities

Richard Johnson

Antonio Bossi

 

 

 

 

Tel: +44 (0) 20 7601 6100

College Hill Associates

Tel: +44 (0) 20 7457 2020

Nick Elwes

www.sanleonenergy.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKMGZFLFRGZZG
Date   Source Headline
7th Jan 20107:00 amRNSIraqi Joint Venture
5th Jan 20107:00 amRNSPolish Concesssion Award
30th Dec 20099:30 amRNSRule 8.1- San Leon Energy Plc
23rd Dec 20097:03 amRNSUpdate on Island & Loan
23rd Dec 20097:01 amRNSAward of Gdansk W Concession
23rd Dec 20097:01 amRNSUpdate on San Leon Approach and Working Capital Lo
22nd Dec 20099:15 amRNSRule 8.1 - San Leon Energy Plc
15th Dec 20099:39 amRNSRule 8.1 - San Leon Energy Plc
14th Dec 200910:02 amRNSRule 8.1 - San Leon Energy Plc
10th Dec 200910:42 amRNSEPT Disclosure
8th Dec 200910:51 amRNSRule 8.1- San Leon Energy Plc
7th Dec 200912:01 pmRNSRule 8.1- San Leon Energy Plc
7th Dec 200910:13 amRNSRule 8.1 - San Leon Energy Plc
20th Nov 200910:05 amRNSEPT Disclosure
19th Nov 20098:38 amRNSEPT Disclosure
18th Nov 20099:22 amRNSEPT Disclosure
17th Nov 20093:41 pmRNSEPT Disclosure
11th Nov 20093:52 pmRNSAppointment of Adviser
6th Nov 200910:06 amRNSEPT Disclosure
4th Nov 200912:22 pmRNSEPT Disclosure
28th Oct 200911:00 amRNSCELTIC SEA ASSETS UPDATE
28th Oct 200910:47 amRNSRule 8.1- San Leon Energy Plc
27th Oct 200911:25 amRNSRule 8.1 - San Leon Energy plc
27th Oct 20098:03 amRNSEPT Disclosure
26th Oct 200911:17 amRNSEPT Disclosure
22nd Oct 20099:45 amRNSDisclosure Form SAR 6
22nd Oct 20099:38 amRNSUpdate on irrevocable undertakings
21st Oct 200911:59 amRNSRule 8.1 - San Leon Energy PLC
21st Oct 20098:45 amRNSEPT Disclosure
20th Oct 20099:41 amRNSEPT Disclosure
19th Oct 20098:09 amRNSEPT Disclosure
16th Oct 200911:40 amRNSEPT Disclosure
15th Oct 20094:08 pmRNSDisclosure Form SAR 6
15th Oct 20092:43 pmRNSDisclosure Form SAR 6
15th Oct 20099:49 amRNSPossible Offer
15th Oct 20097:00 amRNSPossible Offer
30th Sep 20097:00 amRNSInterim Results for the period ending 30 June 2009
18th Sep 20097:00 amRNSPlacing
19th Aug 20097:00 amRNSGas Production Update
20th Jul 20097:00 amRNSExploration Licence Award
6th Jul 20097:00 amRNSCommercial Gas Discovery
1st Jul 200911:00 amRNSAward of New Polish Licence
30th Jun 20097:00 amRNSFinal Results
9th Jun 20097:00 amRNSChange of Adviser
8th Jun 20097:00 amRNSCompletion of Acquisition
1st Jun 20097:00 amRNSAward of Moroccan Oil Project
29th Apr 20097:00 amRNSIssue of Equity
19th Mar 20097:00 amRNSAward of Additional Polish Concessions
10th Mar 20097:00 amRNSAcquisition of new Italian licences
25th Feb 20097:05 amRNSMoroccan Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.