Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Barryroe Well Testing Update

23 Mar 2012 10:03

RNS Number : 9517Z
San Leon Energy PLC
23 March 2012
 



23 March 2012

 

San Leon Energy Plc

("San Leon" or the "Company")

 

Barryroe Well Testing Update

 

San Leon, the fast growing oil and gas company with an extensive portfolio of assets across Europe and North Africa, notes this morning's announcement from Providence Resources plc ("Providence") updating on the Barryroe well. San Leon announced, on 23 December 2011, that the Company has assigned its 30% working interest in Standard Exploration Licence 1/11 to Providence in exchange for a 4.5% NPI on the full field. San Leon Energy will not pay any further appraisal or development costs on the Licence and is not paying any costs towards the 48/24-10 well.

 

 

The full announcement by Providence stated the following:

BARRYROE WELL TESTING UPDATE

·; UPPER GAS BEARING RESERVOIR PROVES TO BE HIGHLY PRODUCTIVE

·; WELL NOW SUSPENDED AND RIG DEMOBILISATION UNDERWAY 

Providence Resources P.l.c., ('Providence') the London (AIM) and Dublin (ESM) quoted oil and gas exploration and production company is pleased to provide a final testing update from its Barryroe well, offshore southern Ireland. The 48/24-10z Barryroe appraisal well is located in c. 100 metre water depth, c. 50 kilometres offshore Ireland in Standard Exploration Licence (SEL) 1/11 in the North Celtic Sea Basin. Providence (80%) operates SEL 1/11 on behalf of its partner Lansdowne Oil & Gas plc (20%).

 

Following the successful testing of the lower basal 24' net oil bearing interval, which flowed c. 3,514 BOPD & 2.93 MMSCFGD (c. 4,000 BOEPD, see RNS announcement of March 15th), an additional 17' thick net gas bearing section was perforated to test the potential of the upper part of the basal Wealden sandstone section. The surface test spread equipment was optimized for the lower oil zone test and was therefore equipment constrained on this gas zone test, which achieved highly productive flow rates of c. 7 MMSCFGD & 1,350 BOPD (c. 2,516 BOEPD) through a restricted 36/64" choke, with a flowing well head pressure of c. 1,700 psig. The productivity of the gas bearing interval far exceeded expectations and thereby constrained the ability to fully open the well up to its maximum potential. Preliminary modeling of the pressure data indicates that a co-mingled flow rate of c. 17 MMSCFGD & 3,350 BOPD (c. 6,183 BOEPD) at a flowing well head pressure of c. 500 psig is achievable. Well suspension operations are now complete and the rig will be demobilized to the UK imminently.

 

Commenting on this further successful test, Tony O'Reilly, CEO of Providence said:

 

"We are very pleased to confirm that the gas zone was far more productive than we had anticipated. The well lies just 3 km from installed pipeline infrastructure which may provide a future route to monetize any surplus Barryroe gas production. It is particularly pleasing to note that both the oil and gas zones have far exceeded our pre-drill expectations, both in terms of reservoir development and more importantly, oil and gas flow rates. I once again wish to express our thanks to all involved in this testing programme, which has demonstrated such a substantial cumulative flow rate potential from this vertical Barryroe appraisal well."

 

 

 

For further information contact:

 

 

San Leon Energy Plc

Tel: + 353 1291 6292

Oisin Fanning, Executive Chairman

 

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

Paul Connolly

John Dwyer

 

Westhouse Securities

Richard Johnson

Antonio Bossi

 

 

 

 

Tel: +44 (0) 20 7601 6100

College Hill Associates

Tel: +44 (0) 20 7457 2020

Nick Elwes

www.sanleonenergy.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKMGZFLFRGZZG
Date   Source Headline
5th Apr 201310:29 amRNSBarryroe Update
21st Mar 201310:21 amRNSConversion of Aurelian Options
19th Mar 20139:11 amRNSHolding(s) in Company
18th Mar 20137:00 amRNSStrategic Relationship with Halliburton
22nd Feb 20139:04 amRNSHolding(s) in Company
7th Feb 20137:00 amRNSAlbania Farm-Out Update
4th Feb 20137:00 amRNSTarfaya Oil Shale Project Update
31st Jan 20137:00 amRNSCompletion of Foum Draa Farm-Out, Offshore Morocco
25th Jan 20133:15 pmRNSForm 8.3 - San Leon Energy PLC
25th Jan 201312:48 pmBUSForm 8.3 - San Leon Energy Plc
25th Jan 201311:00 amRNSTotal Voting Rights
25th Jan 20138:00 amRNSScheme Effective
24th Jan 20133:08 pmRNSForm 8.3 - San Leon Energy PLC
24th Jan 20131:10 pmRNSForm 8.3 - [San Leon Energy Plc]
24th Jan 20131:07 pmRNSCourt Sanction of Scheme
24th Jan 201312:29 pmBUSForm 8.3 - San Leon Energy Plc
23rd Jan 20133:25 pmRNSForm 8.3 - San Leon Energy PLC
23rd Jan 20131:33 pmBUSForm 8.3 - SAN LEON ENERGY PLC
23rd Jan 201312:44 pmRNSForm 8.3 - San Leon Energy Plc
22nd Jan 20131:50 pmBUSForm 8.3 - San Leon Energy Plc
22nd Jan 201311:43 amRNSForm 8.3 - San Leon Energy PLC
21st Jan 20133:02 pmRNSForm 8.3 - San Leon Energy PLC
18th Jan 20133:03 pmRNSForm 8.3 - San Leon Energy PLC
18th Jan 201311:58 amRNSForm 8.3 - San Leon Energy Plc
17th Jan 20132:47 pmRNSForm 8.3 - San Leon Energy PLC
17th Jan 20131:50 pmRNSForm 8.3 - San Leon Energy Plc
17th Jan 201311:22 amRNSForm 8.3 - San Leon Energy Plc
16th Jan 20133:50 pmRNSForm 8.3 - San Leon Energy Plc
16th Jan 20133:48 pmRNSForm 8.3 - San Leon Energy Plc
16th Jan 20133:26 pmRNSForm 8.3 - San Leon Energy PLC
16th Jan 20132:50 pmRNSForm 8.3 - San Leon Energy Plc
16th Jan 20132:29 pmRNSForm 8.3 - San Leon Energy PLC
16th Jan 201312:37 pmBUSForm 8.3 - San Leon Energy Plc
15th Jan 20133:27 pmRNSForm 8.3 - San Leon Energy PLC
15th Jan 20133:14 pmRNSForm 8.3 - San Leon Energy Plc
15th Jan 20132:22 pmRNSForm 8.3 - San Leon Energy PLC
15th Jan 20131:55 pmBUSForm 8.3 - San Leon Energy Plc
14th Jan 20133:25 pmRNSForm 8.3 - San Leon Energy PLC
14th Jan 20132:33 pmBUSForm 8.3 - SAN LEON ENERGY PLC
11th Jan 20131:52 pmBUSForm 8.3 - SAN LEON ENERGY PLC
11th Jan 20139:53 amRNSTotal Voting Rights and Rule 2.10 Announcements
10th Jan 20133:25 pmRNSForm 8.3 - San Leon Energy PLC
10th Jan 20133:23 pmRNSForm 8.3 - San Leon Energy PLC
10th Jan 20132:04 pmRNSForm 8.3 - San Leon Energy Plc
10th Jan 201312:40 pmBUSForm 8.3 - SAN LEON ENERGY PLC
9th Jan 20133:25 pmRNSForm 8.3 - San Leon Energy PLC
9th Jan 20133:11 pmRNSForm 8.3 - San Leon Energy PLC
9th Jan 20132:04 pmRNSForm 8.3 - San Leon Plc
9th Jan 201312:31 pmBUSForm 8.3 - SAN LEON ENERGY PLC
9th Jan 201310:24 amRNSForm 8.3 - San Leon Energy plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.