Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSHG.L Regulatory News (SHG)

  • There is currently no data for SHG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Maiden Reserve at New Luika Gold Mine

21 Oct 2013 07:01

RNS Number : 9205Q
Shanta Gold Limited
21 October 2013
 



Shanta Gold Limited

 

 ("Shanta Gold" or the "Company")

Maiden Reserve of 479,000 ounces at New Luika Gold Mine

 

Shanta Gold, the East Africa focussed gold production and exploration company, is pleased to announce a maiden reserve for its New Luika Gold Mine ("New Luika") in Tanzania.

Highlights

· Probable Ore Reserve at New Luika 2.46 million tonnes @ 6.1g/t for 479,000 ounces gold

· Ore Reserve based on a gold price of US$1,300 per ounce

· Average cash cost inclusive of royalties US$748 per ounce.

· Underpins the development of the Company in the Lupa Goldfield

· Recent drilling has indicated the ore bodies extend at depth indicating potential for underground mining operations at New Luika

· Both the economic pits fall within the currently defined Measured and Indicated Resources.

 

The Reserve is based on the completion of a study compliant with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code 2004 Edition) which focusses on the economically mineable portion of the previously defined JORC (2004 Edition) compliant Measured and Indicated Mineral Resource. The reported Reserve is based on two of the nine defined deposits at New Luika; namely Bauhinia Creek and Luika.

 

Commenting on the maiden reserve, Mike Houston, CEO said:

 

"With the Company having being operational for almost a year it was very important we established our maiden reserve at New Luika to give shareholders the comfort that the initial five year production profile previously announced could be achieved within conservative economic parameters. With recent drilling indicating that the high grade Bauhinia Creek deposit is open at depth and the adjoining Luika target also has high grade shoots, it provides an opportunity for the Company to review the total resource and mining method. New Luika has unique opportunities in that it can blend the ores from various deposits to optimise the grade through both opencast and underground mining thereby maximising shareholder value".

Upgrade of Mineral Resource to Ore Reserve Status

 

The JORC (2004 Edition) compliant study supporting the Ore Reserve statement was completed by Philip van Vuuren, Shanta Gold's consultant Mining Engineer, incorporating the newly completed geotechnical investigation at the Bauhinia Creek and Luika deposits by Middindi Consulting (Pty) Ltd. The ongoing plant expansion was also taken into consideration which is planned to enable gold production to be increased to 80,000 ounces per annum. The JORC (2004 Edition) compliant July 2012 Mineral Resource estimate formed the basis of this Ore Reserve estimate and the Measured and Indicated Mineral Resources are inclusive of those Mineral Resources that have been modified to produce the Ore Reserves stated here.

Ore Reserves were estimated with Micromine 2013, utilising the Lerchs-Grossman optimisation algorithm, using the current mining operation's cost structure and pit slopes defined in the geotechnical report by Middindi.

All the Ore Reserves estimated at the New Luika Gold Mine are contained within the Measured and Indicated Resource category envelop and result in two open pits; one located at Bauhinia Creek and one Luika at depths up to 220m and 125m below surface respectively. The reserve currently supports average production rates from the Bauhinia Creek and Luika operations of 480,000 tonnes per annum over a five year life. Gold production from the open pits over this period averages 80,000 ounces per annum. Studies are currently underway to assess the underground mining potential at both Bauhinia Creek and Luika. The open pit and underground mining potential of the other seven mineralised targets within the New Luika mining license are also being investigated as well as the on-surface auriferous gravel occurrences on the property.

The Ore Reserve estimate is summarised below:

Target

 Reserves for Bauhinia Creek and Luika October 2013

Tonnes

Gold Grade

Ounces in Situ

(millions)

(g/t)

(koz)

Bauhinia Creek

1.42

8.0

368

Luika

1.04

3.3

111

Total Probable Ore Reserve

2.46

6.1

479

 

The following key technical, operational and financial parameters were used in the determination of the Ore Reserve:

Parameter

Units

Value

Gold Price

US$ per ounce

1,300

Overall Pit Wall Slope

Degrees

451

Total Contained Ore

Mt

2.46

Total Contained Waste

Mt

51.16

Average stripping ratio

Waste/Ore

18.8:1

Contained Gold in Situ

Koz Au

479

Mining Dilution Added

%

6

Mining Recovery

%

94

Processing Plant Feed Rate

Tonnes per year

480,000

Average Head Grade

Au g/t

5.7

Processing Recovery

%

89

Average Mining Cost

USD per tonne mined

4.12

Processing Cost

USD per tonne milled

34.20

General & Administration Cost

USD per tonne milled

Included in the Processing cost

Royalty Payment

%

4

Note: 1) Poor hanging wall conditions resulted in this lower than normal average pit slope

Based on the above parameters, the economic cut-off grade is 1.14g/t and the average cash cost inclusive of royalties is USD 748 per ounce.

The reported Ore Reserves have been compiled by Mr. Philip van Vuuren BSc (Min) Eng, BComm (UNISA) is a member of the SAIMM (member number 20424) and ECSA (member number 865248) and an independent consulting Mining Engineer. He has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking, to qualify as a Competent Person as defined in the 'Australasian Code for Reporting of Mineral Resources and Ore Reserves' of December 2004 ("JORC Code") as prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists and the Minerals Council of Australia. Mr. van Vuuren gives Shanta Gold Limited consent to use this reserve estimate in reports. 

 

Competent Persons Statement

 

Philip van Vuuren BSc (Min) Eng, BComm, Shanta Gold's Independent Consulting Mining Engineer, is a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, and has reviewed and approved the technicalinformation contained in this announcement.

 

Enquiries:

Shanta Gold Limited Tel: +255 (0) 22 2601 829Mike Houston, CEOPatrick Maseva-Shayawabaya, CFO

Nominated Adviser and BrokerLiberum Capital Limited Tel: + 44 (0)20 3100 2000Tom Fyson / Ryan de Franck

Financial Public RelationsFTI Consulting Tel: +44 (0)20 7269 7183Oliver Winters / Sara Powell

About Shanta Gold Limited

Shanta Gold is an East African focused gold producing company. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties. The Company's flagship New Luika Gold Mine commenced production in 2012. The Company is admitted to trading on AIM and has approximately 462 million shares in issue. For further information visit the Company's website: www.shantagold.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBSBDGLSDBGXG
Date   Source Headline
26th Mar 20209:00 amRNSPrice Monitoring Extension
24th Mar 20204:42 pmRNSSecond Price Monitoring Extn
24th Mar 20204:38 pmRNSPrice Monitoring Extension
24th Mar 20207:00 amRNSRestructuring convertible loan notes
20th Mar 202012:04 pmRNSResult of Annual General Meeting
16th Mar 20202:05 pmRNSSecond Price Monitoring Extn
16th Mar 20202:00 pmRNSPrice Monitoring Extension
4th Mar 20203:26 pmRNSPosting of Annual Report and Notice of AGM
2nd Mar 202011:00 amRNSPrice Monitoring Extension
28th Feb 20207:00 amRNSFY Results for the year ended 31 December 2019
20th Feb 20207:00 amRNSRestructuring of convertible loan notes
13th Feb 20208:54 amRNSTR-1: Notification of major holdings
10th Feb 20207:00 amRNSShanta To Acquire Barrick's Kenya Gold Projects
31st Jan 202010:05 amRNSDirector Dealing and Issue of Equity
29th Jan 20207:00 amRNSUpgrade in Singida JORC Resource by 27%
16th Jan 20207:00 amRNSQ4 2019 Production & Operational Update
20th Dec 20197:00 amRNSInaugural connection to the State power grid
18th Dec 20197:00 amRNSBlocklisting Six Monthly Return
16th Dec 20197:00 amRNSNew Luika Gold Mine Exploration Update
18th Nov 20197:00 amRNSNew Luika Gold Mine Reserve and Resource Upgrade
4th Nov 20197:00 amRNSVAT Refund Received
17th Oct 20197:00 amRNSQ3 2019 Production & Operational Update
1st Oct 20197:00 amRNSNew Luika Gold Mine Exploration Update
25th Sep 20192:00 pmRNSPrice Monitoring Extension
30th Aug 20197:00 amRNSTotal Voting Rights
12th Aug 20197:00 amRNSInterim results
7th Aug 20197:00 amRNSSingida $10m Asset Level Financing & Update
23rd Jul 20197:00 amRNSIlunga Underground Achieves Commercial Production
18th Jul 20197:00 amRNSQ2 2019 Production & Operational Update
15th Jul 20197:00 amRNSNew Luika Gold Mine Resource Upgrade
20th Jun 20197:00 amRNSBauhinia Creek Phase 2 Drilling Update
18th Jun 20199:00 amRNSBlocklisting Six Monthly Return
16th May 201912:05 pmRNSCompletion of buyback of convertible loan notes
7th May 20197:00 amRNSBauhinia Creek Central Drilling Update
24th Apr 20191:22 pmRNSResult of Annual General Meeting
18th Apr 20197:00 amRNSQ1 2019 Production & Operational Update
10th Apr 20192:28 pmRNSConfirmation of buyback $5m convertible loan notes
29th Mar 20197:00 amRNSSingida Financing Update
18th Mar 20193:43 pmRNSPosting of Annual Report and Notice of AGM
13th Mar 20194:40 pmRNSSecond Price Monitoring Extn
13th Mar 20194:35 pmRNSPrice Monitoring Extension
13th Mar 20199:05 amRNSSecond Price Monitoring Extn
13th Mar 20199:00 amRNSPrice Monitoring Extension
11th Mar 20197:00 amRNSIlunga Underground First Ore Intersected
8th Mar 20198:27 amRNSHolding(s) in Company
7th Mar 20198:56 amRNSHolding(s) in Company
28th Feb 20193:00 pmRNSDirector Dealing and Issue of Equity
28th Feb 20197:00 amRNSFinal Results for the year ended 31 December 2018
18th Jan 20197:00 amRNSPartial Buyback Of Convertible Loan Notes
17th Jan 20197:00 amRNSQ4 2018 Production & Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.