The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShanta Gold Regulatory News (SHG)

Share Price Information for Shanta Gold (SHG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 14.75
Bid: 14.70
Ask: 14.80
Change: 0.00 (0.00%)
Spread: 0.10 (0.68%)
Open: 14.70
High: 14.76
Low: 14.74
Prev. Close: 14.76
SHG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Luika Gold Mine Exploration Update

1 Oct 2019 07:00

RNS Number : 1990O
Shanta Gold Limited
01 October 2019
 

1 October 2019

Shanta Gold Limited

("Shanta Gold" or the "Company")

 

New Luika Gold Mine Exploration Update

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to report positive surface exploration drilling results from its ongoing exploration programmes within its existing mining licences at the New Luika Gold Mine ("NLGM") in South Western Tanzania.

 

Highlights:

§ Following a detailed review of the exploration portfolio over the last 12 months, new targets within the existing mining licences at NLGM were identified;

§ Two such high-potential targets include Bauhinia Creek ("BC") North and Elizabeth Hill ("EH") North;

§ Exploration drilling at BC North and EH North has intersected encouraging mineralisation with sizeable widths, suggesting significant potential for additional resources to add to the mine plan;

§ BC North overview and drilling highlights:

o Located approximately 300 metres to the north of the high grade BC deposit, which is currently being mined from underground at NLGM;

o Located about 3 km to the west of the NLGM processing plant;

o A total of 19 drill holes representing 2,762 metres have been completed over three phases;

o Hole BNRC013 intersected 4.00 metres grading 8.38 g/t Au and 6.00 metres grading 8.62 g/t Au;

o Hole BNRC009 intersected 4.00 metres grading 8.94 g/t Au;

o Hole BNRC017 intersected 3.00 metres grading 5.41 g/t Au;

o Hole BNRC001 intersected 4.00 metres grading 3.83 g/t Au;

o Hole BNRC018 intersected 10.00 metres grading 3.43 g/t Au.

§ EH North overview and drilling highlights:

o Located about 4 km to the east of the NLGM processing plant;

o Phase 1 drilling programme designed to infill the previously wide spaced drill fences aimed to test the down-dip continuity of the orebody at a 30-metre vertical depth;

o A total of 24 drill holes representing 2,316 metres have been completed over two phases;

o Hole CSR525 intersected 9.00 metres grading 6.62 g/t Au;

o Hole CSR522 intersected 9.00 metres grading 5.56 g/t Au;

o Hole CSR518 intersected 8.00 metres grading 3.29 g/t Au;

§ Strike lengths of the BC North and EH North mineralised structures are estimated to be 150 metres and 350 metres respectively and remain open at depth.

 

Mine Plan Update

Drilling is continuing at depth and along strike at both targets and additional results are expected in Q4 2019.

The results of this drilling campaign and the second drilling campaign in Q4 2019 will be combined and analysed, with an updated Mineral Resource Estimate and resultant life of mine extension expected in the next few months.

 

Eric Zurrin, Chief Executive Officer, commented:

"With mine life extension at New Luika a continuing priority for Shanta, it is exciting to see these latest results from our focused drilling programmes. By prioritising exploration targets that can potentially be converted quickly and cheaply into mine plan ounces, our exploration budget is being spent with our production pipeline and mine life in mind.

"We would expect that these results and the next round of drilling will provide sufficient information for us to declare new resources at these targets in the near future and contribute as another source of ore to feed the NLGM plant."

BC North exploration drilling

BC North is a northeast - southwest trending mineralised system located 300 metres from the BC deposit and close to existing infrastructure. Prior to the drilling programme, the BC North target was delineated by a trenching programme in early 2019, which was designed to test the coincident airborne magnetic and soil geochemistry anomalies.

A total of 19 drill holes representing 2,762 metres have been completed in the ongoing exploration drilling at BC North. The completed drilling has been carried out in three phases that have progressively targeted the down-dip and plunge of the mineralised structures. All of the drilling has been Reverse Circulation (RC) except for 4 drill holes that were completed by diamond tails.

Drilling has been progressively targeting the westerly plunging continuity of the mineralised structure. Holes were inclined at between minus 40 and 70 degrees and averaged 70 metres in depth with a maximum of 168 metres down the hole. These results are over a strike length of 150 metres with holes spaced using 30-metre drill fences. It is estimated that the true widths of the mineralised zones are about 90% of the intersected widths in the holes. The mineralised zones are presented by moderately dipping quartz veins hosted by granodioritic rocks.

Significant BC North drilling results are tabulated below:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

 1

BNRC001

46

50

4

3.83

BNRC002

17

19

2

1.14

48

56

8

1.79

BNRC003

16

18

2

2.04

37

43

6

1.79

2

BNRC005

50

51

1

1.67

BNRC006

74

75

1

1.11

89

93

4

2.41

BNRC007

50

51

1

5.75

84

86

2

1.24

BNRC008

25

26

1

1.47

47

48

1

7.02

59

61

2

1.29

81

83

2

4.14

3

BNRC009

73

74

1

1.94

111

115

4

8.94

Including:

112

113

1

27.50

BNRC013

57

62

5

1.35

86

90

4

8.38

Including:

86

87

1

23.10

87

88

1

8.18

93

99

6

8.62

Including:

97

98

1

25.50

98

99

1

12.40

BNRC014

113

114

1

5.40

BNRC015

118

119

1

4.44

BNRC017

83

84

1

1.58

86

89

3

5.41

Including:

87

88

1

10.70

143

146

3

1.70

BNRC018

10

11

1

1.42

21

22

1

1.17

45

55

10

3.43

Including:

46

47

1

7.80

74

76

2

1.28

CSD128

138.85

139.42

0.57

4.61

CSD129

105.75

106.43

0.68

1.21

124.76

125.35

0.59

1.94

133.33

136.44

3.11

1.30

 

True widths are approximately 90% of the intersected downhole widths.

The focus of the exploration programme at BC North for the remainder of 2019 is to continue to expand the down-plunge and lateral extensions of the mineralised structure with the objective of adding new near-mine Mineral Resources.

 

EH North exploration drilling

The east - west trending EH North structure is located about 4 km to the east of the NLGM processing plant. Delineation and exploration drilling at EH North involved completion of 24 infill RC drill holes totalling 2,316 metres and was carried out in two phases.

The Phase 1 drilling programme at EH North was designed to infill the previously wide-spaced (60 metre) drill fences aimed to test the down-dip continuity of the orebody at a 30-metre vertical depth. The Phase 2 drilling programme was aimed at testing the mineralisation depth continuity at a vertical depth of 60 metres.

Holes were drilled at between minus 40 and 60 degrees and averaged 90 metres in depth with a maximum of 150 metres down the hole. These results are over a strike length of 350 metres with holes spaced using 30-metre drill fences. It is estimated that the true widths of the mineralised zones are about 80% of the intersected widths in the holes. The mineralised zones are presented by a package of steeply dipping quartz veins hosted by granodioritic rocks.

Significant EH North drilling results are tabulated below:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

1

CSR503

5

11

6

1.27

CSR504

88

89

1

1.49

CSR505

113

114

1

1.24

CSR507

127

130

3

1.06

131

133

2

1.09

CSR508

49

52

3

1.03

61

64

3

1.59

65

66

1

1.52

67

68

1

1.15

CSR509

3

4

1

1.03

CSR510

42

44

2

2.29

2

CSR512

38

39

1

1.92

CSR518

49

51

2

1.21

53

61

8

3.29

Including:

53

54

1

12.3

59

60

1

6.37

CSR519

27

28

1

1.99

90

95

5

1.58

CSR522

47

49

2

1.56

62

71

9

5.56

Including:

64

66

2

15.50

CSR523

77

78

1

6.44

CSR524

36

41

5

1.73

Including:

37

38

1

5.08

 CSR525

80

89

9

6.62

Including:

84

88

4

11.00

CSR526

65

66

1

3.16

 

True widths are approximately 80% of the intersected downhole widths.

The Q3 and Q4 2019 surface exploration drilling programme at EH North will continue to focus on delineating and extending the high-grade mineralised shoots with the objective of defining additional Mineral Resources proximal to the current mining operations.

 

 

Enquiries:

Shanta Gold Limited

Eric Zurrin (CEO)

+255 (0) 22 292 5148

Luke Leslie (CFO)

 

 

Nominated Adviser and Broker

Numis Securities Limited

Paul Gillam / John Prior / James Black

+ 44 (0) 20 7260 1000

Financial Public Relations

Tavistock

Charles Vivian / Barnaby Hayward / Gareth Tredway

+44 (0) 20 7920 3150

 

 

About Shanta Gold

Shanta Gold is an East Africa-focused gold producer. It currently has defined ore resources at the New Luika and Singida projects in Tanzania and holds exploration licences covering approximately 1,500km2 in the country. Shanta's flagship New Luika Gold Mine commenced production in 2012 and produced 81,872 ounces in 2018. The Company has been admitted to trading on London's AIM and has approximately 787 million shares in issue.

For further information please visit: www.shantagold.com.

Qualified Person

 

The technical information contained within this announcement has been reviewed by George Kondela (the Company's Mineral Resource Geologist) and Paul W. Mbuya (the Company's Exploration Manager), who are Members of The Australasian Institute of Mining and Metallurgy (Aus.I.M.M).

 

They have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Persons as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLWGUAUBUPBGCU
Date   Source Headline
8th May 20246:18 pmRNSCOURT SANCTION OF SCHEME OF ARRANGEMENT
8th May 202412:01 pmRNSForm 8.5 (EPT/NON-RI)
7th May 20249:49 amRNSForm 8.5 (EPT/NON-RI)
7th May 20247:00 amPRNForm 8.3 - Shanta Gold Ltd
3rd May 20241:49 pmPRNForm 8.3 - Shanta Gold Ltd
3rd May 20249:59 amRNSForm 8.5 (EPT/NON-RI)
3rd May 20249:25 amRNSForm 8.3 - Shanta Gold Ltd
2nd May 202410:54 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
2nd May 202410:16 amRNSForm 8.3 - Shanta Gold Ltd
1st May 20249:25 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
30th Apr 202410:03 amRNSForm 8.3 - Shanta Gold Ltd
30th Apr 20249:36 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
29th Apr 20242:56 pmPRNForm 8.3 - Shanta Gold Ltd
29th Apr 202411:15 amRNSForm 8.5 (EPT/NON-RI)
26th Apr 20241:29 pmPRNForm 8.3 - Shanta Gold Ltd
26th Apr 202410:53 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
26th Apr 20249:21 amRNSForm 8.3 - Shanta Gold Ltd
25th Apr 20241:53 pmPRNForm 8.3 - Shanta Gold Ltd
25th Apr 202411:17 amRNSForm 8.3 - Shanta Gold Ltd
25th Apr 20249:19 amRNSForm 8.5 (EPT/NON-RI)
25th Apr 20247:00 amRNSQ1 2024 Production & Operational Update
24th Apr 202410:23 amRNSForm 8.5 (EPT/NON-RI)
24th Apr 202410:20 amRNSTimetable Update
23rd Apr 202412:26 pmPRNForm 8.3 - Shanta Gold Ltd
23rd Apr 202412:04 pmRNSForm 8.3 - Shanta Gold Ltd
23rd Apr 20248:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Apr 20245:05 pmRNSTR-1 Notification of Major Holdings
22nd Apr 20242:57 pmPRNForm 8.3 - Shanta Gold Ltd
22nd Apr 202411:36 amRNSForm 8.5 (EPT/NON-RI)
22nd Apr 202410:39 amRNSForm 8.3 - Shanta Gold Ltd
19th Apr 20247:00 amRNSRegulatory Approvals Update
18th Apr 202412:49 pmPRNForm 8.3 - Shanta Gold Ltd
18th Apr 20249:18 amRNSForm 8.5 (EPT/NON-RI)
17th Apr 202410:01 amRNSForm 8.3 - Shanta Gold Ltd
17th Apr 20249:39 amRNSForm 8.5 (EPT/NON-RI)
16th Apr 20243:32 pmRNSForm 8.3 - Shanta Gold Ltd
16th Apr 20241:15 pmPRNForm 8.3 - Shanta Gold Limited
16th Apr 202410:57 amRNSRegulatory Approvals Update
16th Apr 20249:36 amRNSForm 8.5 (EPT/NON-RI)
16th Apr 20247:00 amRNSWest Kenya Drilling Update
15th Apr 202410:46 amRNSForm 8.3 - Shanta Gold Ltd
15th Apr 20249:00 amRNSForm 8.5 (EPT/NON-RI)
12th Apr 202410:27 amRNSForm 8.5 (EPT/NON-RI)
11th Apr 202412:05 pmRNSForm 8.3 - Shanta Gold Limited
11th Apr 20249:38 amRNSForm 8.5 (EPT/NON-RI)
10th Apr 20241:35 pmPRNForm 8.3 - Shanta Gold Limited
10th Apr 202411:23 amRNSForm 8.3 - Shanta Gold Limited
10th Apr 20249:17 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
9th Apr 202411:22 amRNSForm 8.3 - Shanta Gold Limited
9th Apr 20248:57 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.