Maiden Reserve at New Luika Gold Mine

21 Oct 2013 07:01

RNS Number : 9205Q
Shanta Gold Limited
21 October 2013
 



Shanta Gold Limited

 

 ("Shanta Gold" or the "Company")

Maiden Reserve of 479,000 ounces at New Luika Gold Mine

 

Shanta Gold, the East Africa focussed gold production and exploration company, is pleased to announce a maiden reserve for its New Luika Gold Mine ("New Luika") in Tanzania.

Highlights

· Probable Ore Reserve at New Luika 2.46 million tonnes @ 6.1g/t for 479,000 ounces gold

· Ore Reserve based on a gold price of US$1,300 per ounce

· Average cash cost inclusive of royalties US$748 per ounce.

· Underpins the development of the Company in the Lupa Goldfield

· Recent drilling has indicated the ore bodies extend at depth indicating potential for underground mining operations at New Luika

· Both the economic pits fall within the currently defined Measured and Indicated Resources.

 

The Reserve is based on the completion of a study compliant with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code 2004 Edition) which focusses on the economically mineable portion of the previously defined JORC (2004 Edition) compliant Measured and Indicated Mineral Resource. The reported Reserve is based on two of the nine defined deposits at New Luika; namely Bauhinia Creek and Luika.

 

Commenting on the maiden reserve, Mike Houston, CEO said:

 

"With the Company having being operational for almost a year it was very important we established our maiden reserve at New Luika to give shareholders the comfort that the initial five year production profile previously announced could be achieved within conservative economic parameters. With recent drilling indicating that the high grade Bauhinia Creek deposit is open at depth and the adjoining Luika target also has high grade shoots, it provides an opportunity for the Company to review the total resource and mining method. New Luika has unique opportunities in that it can blend the ores from various deposits to optimise the grade through both opencast and underground mining thereby maximising shareholder value".

Upgrade of Mineral Resource to Ore Reserve Status

 

The JORC (2004 Edition) compliant study supporting the Ore Reserve statement was completed by Philip van Vuuren, Shanta Gold's consultant Mining Engineer, incorporating the newly completed geotechnical investigation at the Bauhinia Creek and Luika deposits by Middindi Consulting (Pty) Ltd. The ongoing plant expansion was also taken into consideration which is planned to enable gold production to be increased to 80,000 ounces per annum. The JORC (2004 Edition) compliant July 2012 Mineral Resource estimate formed the basis of this Ore Reserve estimate and the Measured and Indicated Mineral Resources are inclusive of those Mineral Resources that have been modified to produce the Ore Reserves stated here.

Ore Reserves were estimated with Micromine 2013, utilising the Lerchs-Grossman optimisation algorithm, using the current mining operation's cost structure and pit slopes defined in the geotechnical report by Middindi.

All the Ore Reserves estimated at the New Luika Gold Mine are contained within the Measured and Indicated Resource category envelop and result in two open pits; one located at Bauhinia Creek and one Luika at depths up to 220m and 125m below surface respectively. The reserve currently supports average production rates from the Bauhinia Creek and Luika operations of 480,000 tonnes per annum over a five year life. Gold production from the open pits over this period averages 80,000 ounces per annum. Studies are currently underway to assess the underground mining potential at both Bauhinia Creek and Luika. The open pit and underground mining potential of the other seven mineralised targets within the New Luika mining license are also being investigated as well as the on-surface auriferous gravel occurrences on the property.

The Ore Reserve estimate is summarised below:

Target

 Reserves for Bauhinia Creek and Luika October 2013

Tonnes

Gold Grade

Ounces in Situ

(millions)

(g/t)

(koz)

Bauhinia Creek

1.42

8.0

368

Luika

1.04

3.3

111

Total Probable Ore Reserve

2.46

6.1

479

 

The following key technical, operational and financial parameters were used in the determination of the Ore Reserve:

Parameter

Units

Value

Gold Price

US$ per ounce

1,300

Overall Pit Wall Slope

Degrees

451

Total Contained Ore

Mt

2.46

Total Contained Waste

Mt

51.16

Average stripping ratio

Waste/Ore

18.8:1

Contained Gold in Situ

Koz Au

479

Mining Dilution Added

%

6

Mining Recovery

%

94

Processing Plant Feed Rate

Tonnes per year

480,000

Average Head Grade

Au g/t

5.7

Processing Recovery

%

89

Average Mining Cost

USD per tonne mined

4.12

Processing Cost

USD per tonne milled

34.20

General & Administration Cost

USD per tonne milled

Included in the Processing cost

Royalty Payment

%

4

Note: 1) Poor hanging wall conditions resulted in this lower than normal average pit slope

Based on the above parameters, the economic cut-off grade is 1.14g/t and the average cash cost inclusive of royalties is USD 748 per ounce.

The reported Ore Reserves have been compiled by Mr. Philip van Vuuren BSc (Min) Eng, BComm (UNISA) is a member of the SAIMM (member number 20424) and ECSA (member number 865248) and an independent consulting Mining Engineer. He has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking, to qualify as a Competent Person as defined in the 'Australasian Code for Reporting of Mineral Resources and Ore Reserves' of December 2004 ("JORC Code") as prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists and the Minerals Council of Australia. Mr. van Vuuren gives Shanta Gold Limited consent to use this reserve estimate in reports. 

 

Competent Persons Statement

 

Philip van Vuuren BSc (Min) Eng, BComm, Shanta Gold's Independent Consulting Mining Engineer, is a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, and has reviewed and approved the technicalinformation contained in this announcement.

 

Enquiries:

Shanta Gold Limited Tel: +255 (0) 22 2601 829Mike Houston, CEOPatrick Maseva-Shayawabaya, CFO

Nominated Adviser and BrokerLiberum Capital Limited Tel: + 44 (0)20 3100 2000Tom Fyson / Ryan de Franck

Financial Public RelationsFTI Consulting Tel: +44 (0)20 7269 7183Oliver Winters / Sara Powell

About Shanta Gold Limited

Shanta Gold is an East African focused gold producing company. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties. The Company's flagship New Luika Gold Mine commenced production in 2012. The Company is admitted to trading on AIM and has approximately 462 million shares in issue. For further information visit the Company's website: www.shantagold.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBSBDGLSDBGXG
Date   Source Headline
31st Oct 202212:49 pmRNSForm 8.3 - Shanta Gold
31st Oct 20228:37 amRNSForm 8.5 (EPT/RI)
28th Oct 20223:12 pmRNSForm 8.3 - Shanta Gold Limited
28th Oct 20229:02 amRNSForm 8.5 (EPT/RI)
27th Oct 20226:49 pmRNSForm 8 (OPD) Shanta Gold Limited
27th Oct 20228:53 amRNSForm 8.5 (EPT/RI)
26th Oct 20221:59 pmRNSForm 8.3 - Shanta Gold Limited
26th Oct 20221:58 pmRNSForm 8.3 - Shanta Gold Limited
26th Oct 20221:56 pmRNSForm 8.3 - [Shanta Gold Limited]
26th Oct 20221:56 pmRNSForm 8.3 - [Shanta Gold Limited]
26th Oct 20228:45 amRNSForm 8.5 (EPT/RI)
26th Oct 20227:00 amRNSQ3 2022 Production and Operational Update
25th Oct 20226:21 pmRNSForm 8.3 - Shanta Gold Limited
25th Oct 20223:55 pmRNSNotice of Results
25th Oct 20229:12 amRNSForm 8.5 (EPT/RI)
24th Oct 202211:31 amRNSForm 8.5 (EPT/RI)
21st Oct 20221:59 pmRNSForm 8.3 - Chaarat Gold Holdings Ltd
21st Oct 202211:35 amRNSForm 8.5 (EPT/RI)
21st Oct 202211:34 amRNSForm 8.5 (EPT/RI)
21st Oct 202211:33 amRNSForm 8.5 (EPT/RI)
21st Oct 202210:41 amBUSForm 8.3 - Shanta Gold Ltd - AMENDMENT
20th Oct 20221:05 pmRNSForm 8.3 - Shanta Gold Limited
20th Oct 20228:59 amRNSForm 8.5 (EPT/RI)
20th Oct 20228:42 amRNSForm 8.5 (EPT/RI)
19th Oct 20223:19 pmRNSForm 8.3 - Shanta Gold
19th Oct 202212:58 pmGNWForm 8.3 - [SHANTA GOLD - 18 10 2022 - Opening Declaration] - HHL
19th Oct 202212:39 pmRNSForm 8.3 - Shanta Gold Limited
19th Oct 202211:12 amRNSForm 8.5 (EPT/RI)
19th Oct 20229:13 amRNSForm 8.5 (EPT/RI)
19th Oct 20227:00 amRNSStatement regarding possible offers
19th Oct 20227:00 amRNSForm 8.3 - Shanta Gold Limited
18th Oct 20224:40 pmRNSSecond Price Monitoring Extn
18th Oct 20224:35 pmRNSPrice Monitoring Extension
18th Oct 20224:11 pmRNSStatement regarding possible offers - Update
18th Oct 20222:05 pmRNSSecond Price Monitoring Extn
18th Oct 20222:00 pmRNSPrice Monitoring Extension
18th Oct 202212:38 pmRNSStatement re Possible Offer
18th Oct 202211:40 amRNSStatement Regarding Possible Offer
18th Oct 202211:26 amRNSProject Clarity Announcement
5th Sep 20227:00 amRNSInterim Results - 30 June 2022
31st Aug 20227:00 amRNSSingida Construction Update
3rd Aug 20227:00 amRNSHigh-Grade Drilling Results - West Kenya Project
29th Jul 20227:02 amRNSTR-1 Notification of Major Holdings
21st Jul 20227:00 amRNSQ2 2022 Production and Operational Update
17th Jun 20222:00 pmRNSResult of AGM - RNS Correction
17th Jun 20227:00 amRNSBlock listing Interim Review
16th Jun 20227:01 amRNSAward of Mining Licence at Porcupine South
16th Jun 20227:00 amRNSResult of AGM
13th Jun 20227:00 amRNSNew Loan Facility and Trading Update
7th Jun 20227:00 amRNSDividend Timetable Confirmation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.