The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShanta Gold Regulatory News (SHG)

Share Price Information for Shanta Gold (SHG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 14.75
Bid: 14.70
Ask: 14.80
Change: 0.01 (0.07%)
Spread: 0.10 (0.68%)
Open: 14.76
High: 14.76
Low: 14.75
Prev. Close: 14.75
SHG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Luika Gold Mine Exploration Update

16 Dec 2019 07:00

RNS Number : 9043W
Shanta Gold Limited
16 December 2019
 

16 December 2019

Shanta Gold Limited

("Shanta Gold" or the "Company")

 

New Luika Gold Mine Exploration Update

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to report surface and underground exploration drilling results from its ongoing exploration programmes at the New Luika Gold Mine ("NLGM") in South Western Tanzania.

 

Highlights:

§ 66 Reverse Circulation ("RC") and diamond core holes totalling 7,410 metres have been drilled between October and December 2019 at a cost of approximately US$0.7 million;

§ The drilling was focused on the Bauhinia Creek ("BC") North and BC East deposits, Elizabeth Hill (Main and North) Open Pits and BC Deep West targets, all located within the Company's mining licenses;

§ Exploration drilling has included the intersection of high grade mineralisation at encouraging widths. All of the below exploration results are new, and have not previously been announced to the market;

§ BC North drilling highlights:

o Hole BNRC029 intersected 11.00 metres grading 8.55 g/t Au;

o Hole BNRC031 intersected 10.00 metres grading 10.93 g/t Au;

o Hole BNRC028 intersected 10.00 metres grading 9.18 g/t Au;

o Hole BNRC021 intersected 6.00 metres grading 11.41 g/t Au;

o Hole BNRC024 intersected 5.00 metres grading 6.21 g/t Au;

o Hole BNRC025 intersected 4.00 metres grading 5.04 g/t Au;

§ BC East drilling highlights:

o Hole CSR538 intersected 7.00 metres grading 6.86 g/t Au;

o Hole CSR546 intersected 4.00 metres grading 10.83 g/t Au

o Hole CSR545 intersected 4.00 metres grading 4.86 g/t Au;

§ Elizabeth Hill Main and North Open Pits drilling highlights:

o Hole CSR528 intersected 9.00 metres grading 2.31 g/t Au and 3.00 metres grading 2.25 g/t Au;

o Hole CSR531 intersected 2.00 metres grading 2.46 g/t Au;

o Hole CSR534 intersected 2.00 metres grading 2.16 g/t Au;

o Assay results for 8 drill holes are awaited from the laboratory;

§ BC Deep West drilling highlights:

o Hole CSD131 intersected 7.30 metres grading 4.52 g/t Au;

o Hole CSD132 intersected 1.65 metres grading 14.27 g/t Au; and,

o The BC Deep West Phase 2 drilling program is ongoing and will involve drilling of three diamond core holes totalling 750 metres aimed at testing the westerly plunging shoot of the BC orebody.

 

Mine Plan Update

The results of this drilling campaign will be incorporated into an updated Mineral Reserve & Resource Estimate which is expected to be released in early 2020.

Eric Zurrin, Chief Executive Officer, commented:

"Exploration at New Luika remains a high priority focus for Shanta, given the impact that increasing ounces has on shareholder value. The ongoing results are highly encouraging as we can see that they show high grades, at good widths that suggest ongoing life of mine extension."

 

BC North exploration drilling

The BC North target is located about 300 metres from the BC deposit and close to existing infrastructure. The target was inferred from structural fabric analysis of aeromagnetic data, which delineated a WSW - ENE striking shear zone, with a similar orientation/geometry and strike extent as that of the BC and Luika deposits. Surface soil geochemistry was consistent with the inferred shear zone trend, and the follow-up trenching program intersected encouraging gold mineralization over a strike extent of about 100 metres. The BC North mineralized shear zone dips at about 60° to the NNW.

A total of 16 drill holes representing 2,551 metres were completed for the Phase 4 drilling programme at BC North in Q4 2019. The drilling programme was designed to test the north-westerly continuity of the BC North mineralized structure. All of the drilling was RC with the exception of 4 drill holes that were completed by diamond tails (229 metres).

Drilling has been progressively targeting the westerly plunging continuity of the mineralised structure. Holes were inclined at between minus 56 and 82 degrees and averaged 129 metres in depth with a maximum of 192 metres down the hole. These results are over a strike length of 150 metres with holes spaced using 30-metre drill fences. It is estimated that the true widths of the mineralised zones are about 90% of the intersected widths in the holes. The mineralised zones are presented by moderately dipping quartz veins hosted by granodioritic rocks.

Significant BC North drilling results are tabulated below:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

4

BNRC020

46

53

7

3.35

Including:

50

51

1

9.35

BNRC021

38

39

1

2.26

70

71

1

6.60

78

80

2

13.65

BNRC023

75

79

4

10.29

Including:

 

 

76

77

1

22.10

BNRC024

45

46

1

0.01

50

51

1

0.02

77

78

1

0.02

81

82

1

1.77

102

107

5

6.21

Including:

 

 

103

104

1

22.10

BNRC025

50

51

1

1.31

53

57

4

5.04

Including:

 

 

55

56

1

14.90

BNRC026

115

122

7

1.30

BNRC027

39

45

6

1.65

50

52

2

1.93

60

61

1

0.02

BNRC028

59

62

3

1.41

94

104

10

9.18

Including:

 

 

98

100

2

28.35

BNRC029

82

84

2

3.03

93

104

11

8.55

Including:

 

 

96

97

1

24.60

BNRC030

72

75

3

1.14

BNRC031

45

46

1

0.01

49

59

10

10.93

Including:

 

 

51

52

1

40.70

54

55

1

35.40

BNRC032

62

67

5

1.40

True widths are approximately 90% of the intersected downhole widths.

The focus of the exploration programme at BC North in Q1 2020 will be to continue to expand the down-plunge and lateral extensions of the mineralised structure with the objective of adding new near-mine Mineral Resources.

The BC North zones currently have total indicated resources of 229 kt, grading 2.90 g/t Au, containing 21,315 ounces of gold and total inferred resources of 43 kt, grading 3.04 g/t Au, containing 4,214 ounces of gold.

BC East exploration drilling

BC East is a northeast - southwest trending mineralised system located 400 metres from the BC deposit and close to existing infrastructure. Prior to the drilling programme, the BC East target was delineated by a coincident soil Geochem anomaly and trenching intersections in early 2019, which was designed to follow up on the historical encouraging rock grab assay results.

A total of 19 shallow RC drill holes representing 990 metres were completed for the Phase 1 drilling program in Q4 2019 at BC East. The drilling will continue in Q2 2020 after the end of rainy season to progressively target the down-dip and plunge of the mineralised structures.

Holes were inclined at between minus 47 and 60 degrees and averaged 52 metres in depth with a maximum of 96 metres down the hole. These results are over a strike length of 80 metres with holes spaced using 30-metre drill fences. It is estimated that the true widths of the mineralised zones are about 85% of the intersected widths in the holes. The mineralised zones are presented by moderately dipping quartz veins hosted by granodioritic rocks.

Significant BC North drilling results are tabulated below:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

1

CSR538

14

21

7

6.86

Including:

 

 

16

17

1

10.90

19

20

1

28.10

CSR539

16

19

3

1.30

Including:

 

 

16

17

1

2.25

CSR543

54

55

1

1.64

CSR545

8

12

4

4.86

CSR546

19

23

4

10.83

Including:

 

 

20

21

1

24.70

CSR548

15

16

1

1.46

True widths are approximately 85% of the intersected downhole widths.

The 2020 surface exploration drilling programme at BC East will focus on testing the continuity of the high-grade mineralised shoots with the objective of defining additional Mineral Resources proximal to the current mining operations.

Elizabeth Hill ("EH") Main and North exploration drilling

The east - west trending EH Main and North structures are located about 4 km to the east of the NLGM processing plant. EH is a brittle-ductile shear zone hosting robust quartz veins (locally up to 10 metres wide) within granodioritic rock units. The EH North structure is considered to be an ENE - WSW trending splay of the NW - SE trending EH Main structure. Both veins systems are associated with left-lateral and reverse kinematic (oblique) shear zones. The intersection zone between EH Main and EH North might represent a confluence of fluid migration, increased permeability and dilation, and hence potential for encouraging mineralization.

During Q4 2019, delineation and exploration drilling involved completion of 5 drill holes totalling 438 metres at EH Main and 15 holes totalling 1,748 metres at EH North. The Phase 3 drilling programme was designed to infill areas that were identified to have potential to convert additional inferred resources into Measured & Indicated category resources following a review of the geological model.

Holes were drilled at between minus 46 and 65 degrees and averaged 109 metres in depth with a maximum of 168 metres down the hole. These results are over a strike length of 350 metres with holes spaced using 30-metre drill fences. It is estimated that the true widths of the mineralised zones are about 80% of the intersected widths in the holes.

Significant EH Main and North drilling results are tabulated below while assay results for an additional 8 drill holes are awaited from the laboratory:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

3

CSR528

116

125

9

2.31

CSR528

CSR531

159

162

3

2.25

Including:

154

155

1

3.71

0

2

2

2.46

CSR531

CSR532

42

43

1

2.80

58

60

2

1.83

CSR533

40

44

4

1.09

CSR534

94

96

2

2.16

CSR535

38

39

1

2.66

CSR535

51

52

1

1.24

54

57

3

0.59

Including:

54

55

1

1.10

True widths are approximately 80% of the intersected downhole widths.

The EH Main and North zones currently have indicated resources of 1,582 kt, grading 2.25 g/t Au, containing 114,550 ounces of gold and inferred resources of 638 kt, grading 1.52 g/t Au, containing 31,240 ounces of gold.

BC Deep West exploration drilling

The Bauhinia Creek deposit is located within a moderately steep (±55°), NW-dipping shear zone, which is silicified and mineralized by an auriferous quartz (± carbonate) vein system. Single mineralized, economic veins trend parallel to the shear zone geometry, but pinch or taper out towards the ENE, abruptly terminating against the Nose Fault to the WSW. The highest grade and most voluminous Au instances are associated with a gradual left-lateral release bend that causes a dilatational jog that steeply plunges (±45-50°) to the NNW. The exploration drilling programs at BC are designed to target the continuation of the mineralized jog.

Four diamond drill holes representing 946 metres were completed in the BC Deep West Phase 1 drilling programme. The drilling programme tested the continuity of the BC westerly plunging shoot between levels 530 mRL and 640 mRL. Holes were inclined at between minus 28 and 76 degrees and averaged 237 metres in depth with a maximum of 282 metres down the hole. It is estimated that the true widths of the mineralised zones are about 90% of the intersected widths in the holes.

The BC Deep West Phase 1 drilling results are tabulated below:

Phase

BHID

From (m)

To (m)

Interval (m)

Au (g/t)

1

CSD130

213.40

217.37

3.97

2.41

Including:

214.34

214.85

0.51

5.67

CSD131

239.12

246.42

7.30

4.52

Including:

245.46

246.19

0.73

30.10

CSD132

141.74

143.39

1.65

14.27

Including:

142.86

143.39

0.53

36.20

CSD133

183.93

184.25

0.32

3.18

189.40

189.82

0.42

6.71

True widths are approximately 90% of the intersected downhole widths.

Currently, the BC Deep West Phase 2 drilling program is ongoing and is expected to involve drilling of three diamond core holes totalling about 750 metres to target the BC westerly plunging shoot between levels 525 mRL and 580 mRL. It is hoped that the results of the ongoing drilling program will be available in early 2020.

Enquiries:

Shanta Gold Limited

Eric Zurrin (CEO)

+255 (0) 22 292 5148

Luke Leslie (CFO)

 

 

Nominated Adviser and Broker

Numis Securities Limited

Paul Gillam / Alamgir Ahmed

+ 44 (0) 20 7260 1000

Financial Public Relations

Tavistock

Charles Vivian / Barnaby Hayward / Gareth Tredway

+44 (0) 20 7920 3150

 

 

About Shanta Gold

Shanta Gold is an East Africa-focused gold producer. It currently has defined ore resources at the New Luika and Singida projects in Tanzania and holds exploration licences covering approximately 1,500km2 in the country. Shanta's flagship New Luika Gold Mine commenced production in 2012 and produced 81,872 ounces in 2018. The Company has been admitted to trading on London's AIM and has approximately 787 million shares in issue.

For further information please visit: www.shantagold.com.

Qualified Person

 

The technical information contained within this announcement has been reviewed by George Kondela (the Company's Mineral Resource Geologist) and Paul W. Mbuya (the Company's Exploration Manager), who are Members of The Australasian Institute of Mining and Metallurgy (Aus.I.M.M).

 

They have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Persons as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAPASFFLNFFF
Date   Source Headline
7th May 20249:49 amRNSForm 8.5 (EPT/NON-RI)
7th May 20247:00 amPRNForm 8.3 - Shanta Gold Ltd
3rd May 20241:49 pmPRNForm 8.3 - Shanta Gold Ltd
3rd May 20249:59 amRNSForm 8.5 (EPT/NON-RI)
3rd May 20249:25 amRNSForm 8.3 - Shanta Gold Ltd
2nd May 202410:54 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
2nd May 202410:16 amRNSForm 8.3 - Shanta Gold Ltd
1st May 20249:25 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
30th Apr 202410:03 amRNSForm 8.3 - Shanta Gold Ltd
30th Apr 20249:36 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
29th Apr 20242:56 pmPRNForm 8.3 - Shanta Gold Ltd
29th Apr 202411:15 amRNSForm 8.5 (EPT/NON-RI)
26th Apr 20241:29 pmPRNForm 8.3 - Shanta Gold Ltd
26th Apr 202410:53 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
26th Apr 20249:21 amRNSForm 8.3 - Shanta Gold Ltd
25th Apr 20241:53 pmPRNForm 8.3 - Shanta Gold Ltd
25th Apr 202411:17 amRNSForm 8.3 - Shanta Gold Ltd
25th Apr 20249:19 amRNSForm 8.5 (EPT/NON-RI)
25th Apr 20247:00 amRNSQ1 2024 Production & Operational Update
24th Apr 202410:23 amRNSForm 8.5 (EPT/NON-RI)
24th Apr 202410:20 amRNSTimetable Update
23rd Apr 202412:26 pmPRNForm 8.3 - Shanta Gold Ltd
23rd Apr 202412:04 pmRNSForm 8.3 - Shanta Gold Ltd
23rd Apr 20248:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Apr 20245:05 pmRNSTR-1 Notification of Major Holdings
22nd Apr 20242:57 pmPRNForm 8.3 - Shanta Gold Ltd
22nd Apr 202411:36 amRNSForm 8.5 (EPT/NON-RI)
22nd Apr 202410:39 amRNSForm 8.3 - Shanta Gold Ltd
19th Apr 20247:00 amRNSRegulatory Approvals Update
18th Apr 202412:49 pmPRNForm 8.3 - Shanta Gold Ltd
18th Apr 20249:18 amRNSForm 8.5 (EPT/NON-RI)
17th Apr 202410:01 amRNSForm 8.3 - Shanta Gold Ltd
17th Apr 20249:39 amRNSForm 8.5 (EPT/NON-RI)
16th Apr 20243:32 pmRNSForm 8.3 - Shanta Gold Ltd
16th Apr 20241:15 pmPRNForm 8.3 - Shanta Gold Limited
16th Apr 202410:57 amRNSRegulatory Approvals Update
16th Apr 20249:36 amRNSForm 8.5 (EPT/NON-RI)
16th Apr 20247:00 amRNSWest Kenya Drilling Update
15th Apr 202410:46 amRNSForm 8.3 - Shanta Gold Ltd
15th Apr 20249:00 amRNSForm 8.5 (EPT/NON-RI)
12th Apr 202410:27 amRNSForm 8.5 (EPT/NON-RI)
11th Apr 202412:05 pmRNSForm 8.3 - Shanta Gold Limited
11th Apr 20249:38 amRNSForm 8.5 (EPT/NON-RI)
10th Apr 20241:35 pmPRNForm 8.3 - Shanta Gold Limited
10th Apr 202411:23 amRNSForm 8.3 - Shanta Gold Limited
10th Apr 20249:17 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
9th Apr 202411:22 amRNSForm 8.3 - Shanta Gold Limited
9th Apr 20248:57 amRNSForm 8.5 (EPT/NON-RI)
9th Apr 20247:00 amRNSTanzania Exploration Drilling Update
8th Apr 202412:09 pmRNSRegulatory Approvals Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.