The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSHG.L Regulatory News (SHG)

  • There is currently no data for SHG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drill Results at New Luika Gold Mine

18 Sep 2013 07:00

RNS Number : 2520O
Shanta Gold Limited
18 September 2013
 



18 September 2013

 

Shanta Gold Limited

 

("Shanta Gold" or the "Company")

 

Drill Results at New Luika Gold Mine

 

Shanta Gold, the East Africa focused gold production & exploration company, is pleased to provide an update on progress achieved with its 2013 diamond drilling programme commissioned to expand the Indicated category resource base at the Company's two main ore deposits, Bauhinia Creek and Luika, at the New Luika Gold Mine.

Highlights:

· Mineralisation consistently intersected at levels below that of the currently defined Indicated Resource

· Continuity of previously identified payshoots confirmed at depth and along strike

· High grade intersections including 10.42m @15.02 g/t achieved at depth

· Significant new mineralised strike extensions at Bauhinia Creek identified at depth and to the west of the currently defined orebody

· New high grade intersection achieved at depth and to the east of the currently defined Luika South deposit including 4.52m @ 13.10 g/t

20 diamond drill holes for 4,751m have been completed (with two further holes to be drilled) to provide improved ore body definition at depth and along strike so as to determine the feasibility of possible future underground mining operations. The ore bodies are currently open at depth at Bauhinia Creek and Luika and along strike to the west at Bauhinia Creek. The Company intends integrating drill findings into an updated resource assessment for Bauhinia Creek and Luika. Mineralised intersections have successfully been achieved to depths of approximately 350m below surface at Bauhinia Creek and 270m below surface at Luika.

Mike Houston, Shanta Gold CEO commented:

"Bauhinia Creek is currently the cornerstone deposit for Shanta Gold and it was important that we confirmed our expectation that this high grade ore body extends at depth and to the west. These early stage drilling results at Bauhinia Creek are very encouraging with the targeted drilling at Luika South and Luika confirming the high grade payshoots in these ore bodies extend at depth. Given the close proximity to Bauhinia Creek it may be possible to exploit them via one underground mining operation.

With production at New Luika stabilising and with the further upgrades to the plant in early 2014 on track, the updated resource statement (due out in October) will enable management to consider various scenarios to extend the Life of Mine with an increased level of confidence. "

 

 

Please find below link for the Locality Map - Bauhinia Creek, Luika and Luika South Deposits

 

http://www.rns-pdf.londonstockexchange.com/rns/2520O_-2013-9-17.pdf

 

 

 

Table 1: Mineralised Intersections - Bauhinia Creek, Luika South - 2013 Diamond Drilling Programme

BHID

FROM

TO

INTERSECTION WIDTH

COMPOSITE GRADE (g/t)

COMMENTS

CSD030

270.0

273.1

3.1

4.91

Including 0.44m at 17.8g/t

AND

CSD030

277.8

279.2

1.4

3.20

AND

CSD030

281.7

282.2

0.5

1.52

CSD031

262.2

272.6

10.4

5.78

Including 0.44m at 40.6g/t

CSD032

261.3

261.8

0.5

1.13

AND

CSD032

264.1

267.5

3.5

5.77

Including 0.38m at 36.3g/t

CSD033

273.5

275.1

1.6

5.36

AND

CSD033

276.9

281.0

4.1

1.56

AND

CSD033

283.5

288.1

4.6

5.80

Including 0.45m at 31.35g/t

CSD034

267.4

274.9

7.5

3.23

CSD035

214.9

225.4

10.5

15.02

Including 0.52m at 100g/t

AND

CSD035

229.0

235.2

6.1

2.92

CSD036

174.4

175.6

1.1

48.18

Including 0.46m at 118g/t

AND

CSD036

308.2

315.2

7.1

1.36

CSD038

334.9

338.8

4.0

8.62

Including 0.57m at 35.9g/t

AND

CSD038

344.4

348.4

4.5

2.93

CSD044

402.8

403.7

0.9

9.01

AND

CSD044

412.5

413.4

0.9

1.91

 

 

Note: Figures above subject to rounding. CSD022, CSD22D1 - Fault loss zone intersected localized structural elimination of ore body; CSD037 - Fault loss zone intersected localized structural elimination of ore body

 

Please find below link for an image of the longitudinal Section Looking South - Bauhinia Creek - New Drilled Intersections

http://www.rns-pdf.londonstockexchange.com/rns/2520O_1-2013-9-17.pdf

 

Table 2: Mineralised Intersections - Luika - 2013 Diamond Drilling Programme

BHID

FROM

TO

INTERSECTION WIDTH

COMPOSITE GRADE (g/t)

COMMENTS

CSD026

322.3

325.5

3.2

1.58

AND

CSD026

326.4

328.9

2.5

1.90

CSD027

256.4

261.3

4.9

1.44

CSD028

302.2

303.3

1.1

3.60

Partial Structural Elimination

CSD028D1

291.2

292.1

0.9

1.09

AND

CSD028D1

296.5

298.9

2.5

1.03

Partial Structural Elimination

CSD041

226.6

228.1

1.5

1.25

AND

CSD041

229.5

230.6

1.1

1.30

AND

CSD041

242.5

242.8

0.3

13.20

AND

CSD041

249.2

249.6

0.4

1.15

CSD042

228.8

229.4

0.5

1.17

CSD043

239.9

244.4

4.5

13.10

Including 0.4m at 61.05g/t

 

Note: Figures subject to rounding. CSD029 - Fault loss zone intersected localized structural elimination of ore body; CSD040 - Poorly developed mineralised zone intersected.

 

Please find below link for an image of the Longitudinal Section Looking Southeast - Luika - New Drilled Intersections

http://www.rns-pdf.londonstockexchange.com/rns/2520O_2-2013-9-17.pdf

 

Despite the fact that several of the mineralised intersections achieved at the Luika deposit returned low average gold grades, CSD043 returned 4.5m at 13.10g/t down dip of a prominent payshoot identified during earlier drilling campaigns. The Directors believe that this suggests the continuity of this zone of gold enrichment at depth.

Based on drilling results achieved, the Company is in the process of updating resource assessments for the Bauhinia Creek and Luika deposits which are expected to be published in October 2013. It is the Directors belief that the robust mineralised intersections achieved at depth and along strike have the potential to increase the total exploitable gold resources at Bauhinia Creek, Luika and Luika South. The Company is commissioning studies aimed at the evaluation of underground mining alternatives at Bauhinia Creek and Luika. The aim of these studies is to investigate scenarios whereby continued availability of high grade ore material may be facilitated by means of underground mining operations thereby seeking to optimise the overall resource, including Jamhuri and Black Tree Hill, in the New Luika Gold Mine tenement and by doing so potentially extending the current life of mine.

Enquiries:

 

Shanta Gold Limited

Tel: +255 (0) 22 2601 829

Mike Houston, CEO

 

Patrick Maseva-Shayawabaya, CFO

 

 

 

Nominated Adviser and Broker

 

Liberum Capital Limited

Tel: + 44 (0)20 3100 2000

Tom Fyson / Ryan De Franck

 

 

 

Financial Public Relations

 

FTI Consulting

Tel: +44 (0)20 7269 7183

Oliver Winters / Sara Powell

 

 

Competent Persons Statement

David Briggs NHD, Pr.Sci.Nat (400225/09), Shanta Gold's Resource Manager, is a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, and has reviewed and approved the technical information contained in this announcement.

 

About Shanta Gold Limited

Shanta Gold is an East African focused gold mining company. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties. The Company's flagship New Luika Gold Mine commenced production and achieved first gold pour in August 2012. The Company is admitted to trading on AIM and has approximately 462 million shares in issue.

For further information visit the Company's website: www.shantagold.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKDLFFXKFZBBQ
Date   Source Headline
12th Apr 202410:27 amRNSForm 8.5 (EPT/NON-RI)
11th Apr 202412:05 pmRNSForm 8.3 - Shanta Gold Limited
11th Apr 20249:38 amRNSForm 8.5 (EPT/NON-RI)
10th Apr 20241:35 pmPRNForm 8.3 - Shanta Gold Limited
10th Apr 202411:23 amRNSForm 8.3 - Shanta Gold Limited
10th Apr 20249:17 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
9th Apr 202411:22 amRNSForm 8.3 - Shanta Gold Limited
9th Apr 20248:57 amRNSForm 8.5 (EPT/NON-RI)
9th Apr 20247:00 amRNSTanzania Exploration Drilling Update
8th Apr 202412:09 pmRNSRegulatory Approvals Update
8th Apr 202412:07 pmRNSForm 8.3 - Shanta Gold Limited
8th Apr 20249:30 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
5th Apr 20241:38 pmPRNForm 8.3 - Shanta Gold Ltd
5th Apr 202410:15 amRNSForm 8.5 (EPT/NON-RI)
4th Apr 20243:40 pmRNSResults of Court Meeting and General Meeting
4th Apr 20249:21 amRNSForm 8.3 - Shanta Gold Ltd
4th Apr 20249:18 amRNSForm 8.5 (EPT/NON-RI)
3rd Apr 20242:34 pmRNSForm 8.5 (EPT/NON-RI)
3rd Apr 202410:15 amRNSForm 8.3 - Shanta Gold Ltd
3rd Apr 20247:00 amRNSGroup Reserves & Resources Statement
2nd Apr 20249:02 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
2nd Apr 20247:00 amRNSRegulatory Approvals Update
28th Mar 20249:34 amRNSForm 8.5 (EPT/NON-RI)
27th Mar 202410:38 amRNSForm 8.5 (EPT/NON-RI)
26th Mar 202412:57 pmRNSForm 8.3 - Shanta Gold Ltd
26th Mar 202410:23 amRNSHoldings in Company - Late Notification
26th Mar 20249:34 amRNSForm 8.5 (EPT/NON-RI)
25th Mar 202411:08 amRNSForm 8.5 (EPT/NON-RI)
22nd Mar 20249:58 amRNSForm 8.5 (EPT/NON-RI)
21st Mar 20241:30 pmRNSForm 8.3 - Shanta Gold Ltd
21st Mar 202410:30 amRNSForm 8.3 - Shanta Gold Ltd
21st Mar 202410:14 amRNSForm 8.5 (EPT/NON-RI)
21st Mar 20247:00 amRNSPermitted Dividend
20th Mar 20244:12 pmRNSTR - 1 Notification of Major Holdings
20th Mar 20244:07 pmRNSTR - 1 Notification of Major Holdings
20th Mar 20243:29 pmRNSForm 8.3 - Shanta Gold Limited
20th Mar 202412:01 pmRNSForm 8.3 - Replacement for 6048H Shanta Gold Ltd
20th Mar 202412:01 pmPRNForm 8.3 - Shanta Gold Ltd
20th Mar 202410:08 amRNSForm 8.3 - Shanta Gold Ltd
20th Mar 20249:45 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
19th Mar 202410:15 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
19th Mar 20247:00 amRNSRECOMMENDED INCREASED AND FINAL OFFER
18th Mar 202410:26 amRNSForm 8.5 (EPT/NON-RI)
15th Mar 20242:33 pmPRNForm 8.3 - Shanta Gold Ltd
15th Mar 202410:07 amRNSForm 8.5 (EPT/NON-RI) - Shanta Gold Limited
14th Mar 20243:48 pmRNSForm 8.3 - Shanta Gold Ltd
14th Mar 20242:16 pmPRNForm 8.3 - Shanta Gold Ltd
14th Mar 20249:35 amRNSForm 8.5 (EPT/NON-RI)
13th Mar 20241:56 pmPRNForm 8.3 - Shanta Gold Ltd
13th Mar 202410:06 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.