Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSHG.L Regulatory News (SHG)

  • There is currently no data for SHG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drill Results at New Luika Gold Mine

18 Sep 2013 07:00

RNS Number : 2520O
Shanta Gold Limited
18 September 2013
 



18 September 2013

 

Shanta Gold Limited

 

("Shanta Gold" or the "Company")

 

Drill Results at New Luika Gold Mine

 

Shanta Gold, the East Africa focused gold production & exploration company, is pleased to provide an update on progress achieved with its 2013 diamond drilling programme commissioned to expand the Indicated category resource base at the Company's two main ore deposits, Bauhinia Creek and Luika, at the New Luika Gold Mine.

Highlights:

· Mineralisation consistently intersected at levels below that of the currently defined Indicated Resource

· Continuity of previously identified payshoots confirmed at depth and along strike

· High grade intersections including 10.42m @15.02 g/t achieved at depth

· Significant new mineralised strike extensions at Bauhinia Creek identified at depth and to the west of the currently defined orebody

· New high grade intersection achieved at depth and to the east of the currently defined Luika South deposit including 4.52m @ 13.10 g/t

20 diamond drill holes for 4,751m have been completed (with two further holes to be drilled) to provide improved ore body definition at depth and along strike so as to determine the feasibility of possible future underground mining operations. The ore bodies are currently open at depth at Bauhinia Creek and Luika and along strike to the west at Bauhinia Creek. The Company intends integrating drill findings into an updated resource assessment for Bauhinia Creek and Luika. Mineralised intersections have successfully been achieved to depths of approximately 350m below surface at Bauhinia Creek and 270m below surface at Luika.

Mike Houston, Shanta Gold CEO commented:

"Bauhinia Creek is currently the cornerstone deposit for Shanta Gold and it was important that we confirmed our expectation that this high grade ore body extends at depth and to the west. These early stage drilling results at Bauhinia Creek are very encouraging with the targeted drilling at Luika South and Luika confirming the high grade payshoots in these ore bodies extend at depth. Given the close proximity to Bauhinia Creek it may be possible to exploit them via one underground mining operation.

With production at New Luika stabilising and with the further upgrades to the plant in early 2014 on track, the updated resource statement (due out in October) will enable management to consider various scenarios to extend the Life of Mine with an increased level of confidence. "

 

 

Please find below link for the Locality Map - Bauhinia Creek, Luika and Luika South Deposits

 

http://www.rns-pdf.londonstockexchange.com/rns/2520O_-2013-9-17.pdf

 

 

 

Table 1: Mineralised Intersections - Bauhinia Creek, Luika South - 2013 Diamond Drilling Programme

BHID

FROM

TO

INTERSECTION WIDTH

COMPOSITE GRADE (g/t)

COMMENTS

CSD030

270.0

273.1

3.1

4.91

Including 0.44m at 17.8g/t

AND

CSD030

277.8

279.2

1.4

3.20

AND

CSD030

281.7

282.2

0.5

1.52

CSD031

262.2

272.6

10.4

5.78

Including 0.44m at 40.6g/t

CSD032

261.3

261.8

0.5

1.13

AND

CSD032

264.1

267.5

3.5

5.77

Including 0.38m at 36.3g/t

CSD033

273.5

275.1

1.6

5.36

AND

CSD033

276.9

281.0

4.1

1.56

AND

CSD033

283.5

288.1

4.6

5.80

Including 0.45m at 31.35g/t

CSD034

267.4

274.9

7.5

3.23

CSD035

214.9

225.4

10.5

15.02

Including 0.52m at 100g/t

AND

CSD035

229.0

235.2

6.1

2.92

CSD036

174.4

175.6

1.1

48.18

Including 0.46m at 118g/t

AND

CSD036

308.2

315.2

7.1

1.36

CSD038

334.9

338.8

4.0

8.62

Including 0.57m at 35.9g/t

AND

CSD038

344.4

348.4

4.5

2.93

CSD044

402.8

403.7

0.9

9.01

AND

CSD044

412.5

413.4

0.9

1.91

 

 

Note: Figures above subject to rounding. CSD022, CSD22D1 - Fault loss zone intersected localized structural elimination of ore body; CSD037 - Fault loss zone intersected localized structural elimination of ore body

 

Please find below link for an image of the longitudinal Section Looking South - Bauhinia Creek - New Drilled Intersections

http://www.rns-pdf.londonstockexchange.com/rns/2520O_1-2013-9-17.pdf

 

Table 2: Mineralised Intersections - Luika - 2013 Diamond Drilling Programme

BHID

FROM

TO

INTERSECTION WIDTH

COMPOSITE GRADE (g/t)

COMMENTS

CSD026

322.3

325.5

3.2

1.58

AND

CSD026

326.4

328.9

2.5

1.90

CSD027

256.4

261.3

4.9

1.44

CSD028

302.2

303.3

1.1

3.60

Partial Structural Elimination

CSD028D1

291.2

292.1

0.9

1.09

AND

CSD028D1

296.5

298.9

2.5

1.03

Partial Structural Elimination

CSD041

226.6

228.1

1.5

1.25

AND

CSD041

229.5

230.6

1.1

1.30

AND

CSD041

242.5

242.8

0.3

13.20

AND

CSD041

249.2

249.6

0.4

1.15

CSD042

228.8

229.4

0.5

1.17

CSD043

239.9

244.4

4.5

13.10

Including 0.4m at 61.05g/t

 

Note: Figures subject to rounding. CSD029 - Fault loss zone intersected localized structural elimination of ore body; CSD040 - Poorly developed mineralised zone intersected.

 

Please find below link for an image of the Longitudinal Section Looking Southeast - Luika - New Drilled Intersections

http://www.rns-pdf.londonstockexchange.com/rns/2520O_2-2013-9-17.pdf

 

Despite the fact that several of the mineralised intersections achieved at the Luika deposit returned low average gold grades, CSD043 returned 4.5m at 13.10g/t down dip of a prominent payshoot identified during earlier drilling campaigns. The Directors believe that this suggests the continuity of this zone of gold enrichment at depth.

Based on drilling results achieved, the Company is in the process of updating resource assessments for the Bauhinia Creek and Luika deposits which are expected to be published in October 2013. It is the Directors belief that the robust mineralised intersections achieved at depth and along strike have the potential to increase the total exploitable gold resources at Bauhinia Creek, Luika and Luika South. The Company is commissioning studies aimed at the evaluation of underground mining alternatives at Bauhinia Creek and Luika. The aim of these studies is to investigate scenarios whereby continued availability of high grade ore material may be facilitated by means of underground mining operations thereby seeking to optimise the overall resource, including Jamhuri and Black Tree Hill, in the New Luika Gold Mine tenement and by doing so potentially extending the current life of mine.

Enquiries:

 

Shanta Gold Limited

Tel: +255 (0) 22 2601 829

Mike Houston, CEO

 

Patrick Maseva-Shayawabaya, CFO

 

 

 

Nominated Adviser and Broker

 

Liberum Capital Limited

Tel: + 44 (0)20 3100 2000

Tom Fyson / Ryan De Franck

 

 

 

Financial Public Relations

 

FTI Consulting

Tel: +44 (0)20 7269 7183

Oliver Winters / Sara Powell

 

 

Competent Persons Statement

David Briggs NHD, Pr.Sci.Nat (400225/09), Shanta Gold's Resource Manager, is a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, and has reviewed and approved the technical information contained in this announcement.

 

About Shanta Gold Limited

Shanta Gold is an East African focused gold mining company. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties. The Company's flagship New Luika Gold Mine commenced production and achieved first gold pour in August 2012. The Company is admitted to trading on AIM and has approximately 462 million shares in issue.

For further information visit the Company's website: www.shantagold.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKDLFFXKFZBBQ
Date   Source Headline
8th Mar 20213:54 pmRNSPosting of Annual Report and Notice of AGM
2nd Mar 20217:00 amRNSFinal Results
25th Jan 20217:00 amRNSQ4 2020 Production and Operational Update
21st Jan 202112:18 pmRNSDirector Dealing and Issue of Equity
20th Jan 20217:00 amRNSShanta Group-wide Reserves and Resources Update
6th Jan 20218:31 amRNSDirector/PDMR Shareholding
5th Jan 20217:00 amRNSAppointment of Group Exploration Manager
21st Dec 20207:00 amRNSCompletion of all gold forward sales commitments
18th Dec 20207:00 amRNSBlocklisting Six Monthly Return
16th Dec 20207:00 amRNSNew Luika Gold Mine Exploration Drilling Update
9th Dec 20208:57 amRNSDirector/PDMR Shareholding
17th Nov 20208:00 amEQSHardman & Co Research : Shanta Gold (SHG): Entering its sweet spot
9th Nov 20204:41 pmRNSSecond Price Monitoring Extn
9th Nov 20204:36 pmRNSPrice Monitoring Extension
9th Nov 20202:06 pmRNSSecond Price Monitoring Extn
9th Nov 20202:00 pmRNSPrice Monitoring Extension
29th Oct 20209:39 amRNSNotification of major holdings
29th Oct 20207:36 amRNSNotification of major holdings
27th Oct 202010:16 amRNSNotification of major holdings
23rd Oct 20203:33 pmRNSResult of Fundraising
23rd Oct 202011:17 amRNSFundraising Update
22nd Oct 20205:56 pmRNSRetail Offer
22nd Oct 20205:55 pmRNSProposed Fundraising
19th Oct 20207:00 amRNSQ3 2020 Production and Operational Update
13th Oct 20207:00 amRNSWest Kenya Project Scoping Study
7th Oct 20207:00 amRNSShanta starts construction of the Singida Project
22nd Sep 20207:00 amRNSNew Luika plant capacity expansion
17th Sep 202010:20 amRNSNotification of major holdings
8th Sep 20207:00 amRNSHistorical Drilling at the West Kenya Project
7th Sep 20207:00 amRNSAppointment of Nomad & Joint-Brokers
3rd Sep 20207:00 amRNSShanta Group-wide Reserves and Resources Update
3rd Sep 20207:00 amRNSNew Luika Gold Mine Exploration Drilling Update
24th Aug 20207:00 amRNSInterim results
21st Aug 20207:00 amRNSNotification of major holdings
20th Aug 20203:41 pmRNSNotification of major holdings
19th Aug 20208:17 amRNSSHANTA GOLD ACQUIRES BARRICK’S KENYA GOLD PROJECTS
18th Aug 20203:58 pmRNSSHANTA GOLD - ACQUISITION UPDATE
29th Jul 202011:50 amRNSNotification of major holdings
23rd Jul 202012:43 pmRNSNotification of major holdings
20th Jul 20207:00 amRNSQ2 2020 Production and Operational Update
9th Jul 20209:51 amRNSNotification of major holdings
8th Jul 202010:09 amRNSNotification of major holdings
26th Jun 20208:53 amRNSNotification of major holdings
25th Jun 202012:59 pmRNSNotification of major holdings
18th Jun 20207:00 amRNSBlocklisting Six Monthly Return
10th Jun 202011:24 amRNSNotification of major holdings
26th May 20207:00 amRNSSingida JORC Reserve Estimate and Resource Update
20th Apr 20207:00 amRNSQ1 2020 PRODUCTION & OPERATIONAL UPDATE
14th Apr 202011:06 amRNSSecond Price Monitoring Extn
14th Apr 202011:01 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.