Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0245    -0.0005 (-2.00%)
Bid:
0.023
Ask:
0.026
Spread: 0.003 (13.043%)
Market Cap: £2.35m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update

30 Sep 2010 14:13

RNS Number : 6249T
Red Rock Resources plc
30 September 2010
 



RED ROCK RESOURCES PLC

Update

Dated: 30 September 2010

 

Red Rock Resources plc ("Red Rock" or the "Company"), the gold mining and exploration company with projects in Kenya and Colombia, and interests in steel feed and uranium, reports on progress at its operations.

 

·; Colombian plant ahead of schedule

·; Increase in initial planned capacity at El Limon plant

·; Metallurgical analysis to determine tailings process route under way in Kenya

·; Annual results released at Jupiter Mines Ltd and Resource Star Ltd

 

Colombia gold project:

 

The final $400,000 loan tranche has been advanced to Mineras Four Points SA ("MFP"). The entire $2,000,000 loan to MFP required under the terms of the Funding and Co-Operation Agreement ("Agreement") announced on 10th June 2010 has now been advanced, from funds provided by Red Rock.

 

There are no further performance requirements on the part of Red Rock, and MFP has provided security as required by Red Rock, so that the Agreement is fully operative.

 

At the El Limon mine, the target date for the plant renovation to be complete and for production to recommence is still 30th November 2010, although currently work is ahead of schedule. The initial capacity is now planned at 150 tons per day rather than the previous target of 100 tons per day.

 

Mine safety work has proceeded well, with a second access now provided up to Level 0, and planned to be brought up to surface. Improvements to the ventilation system and replacement of air piping, and installation of the new winch, wire and bucket, are accomplished.

 

A substation with 1000 KW transformers is almost complete, and back up generators with 800 KW capacity are expected to be refurbished and operational within one month. Rewiring within the plant is not accomplished, but is estimated to take two weeks.

 

The last work on the conveyors, crushers, and mill is being completed, with an estimated timing of 10 days to 3 weeks.

 

The plant is near completion, with new 5 ton tanks expected to be installed within 2 weeks, and some adjustments to parts of the circuit likely to be required to fine-tune the plant after receipt of metallurgical test results from Canada, which are expected to arrive on Monday [4] October 2010. 

 

Labour relations with staff who have accepted the new contracts are good; some contractors however have not signed new contracts, and those who do not will not be retained when their current contracts expire in two months.

 

Expansion of the plant to 250 tons per day would require investment by MFP in expansion of the mill capacity and additional tanks, and could be put in place rapidly. Expansion to 400 tons per day would require plant investment of an estimated $620,000 and a new vertical shaft with an estimated cost of $500,000. Planning for expansion is under way.

 

Red Rock's consultant geologist in Colombia has established that the vein is thickening, with significantly higher grade, at the lowest levels of the mine now being developed, particularly at Level 6 south where the vein is over 1m thick. A tunnel is being driven from Level 0 to locate an expected second vein.

 

At the La Aurora/Machuca mine, buildings and sub-station are now in place, with a new winch, and the crushing plant has been delivered. Priority is being given to completing the works at El Limon.

 

Migori gold project: An initial report and analysis

 

Analysis of the VTEM and Magnetic/Radiometric airborne surveys continues, with a a final report expected in October 2010. Multiple targets have been identified.

 

Metallurgical testwork results on the Macalder tailings samples have been received from Amdel Laboratories, and are being analysed. An update with initial conclusions as to process route and timings will follow shortly.

 

Red Rock expects to finalise a drill programme during October 2010.

 

Jupiter Mines Ltd (ASX:JMS)(22.64% held declining to 5.23% on completion of Jupiter Mines Ltd's acquisition of the Tshipi manganese project): 

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31stb4lflbm99y.pdf .

 

Jupiter Mines Ltd continues to prioritise exploration of the Mt Ida magnetite project, where Red Rock has a 1.5% gross production royalty.

 

The transfer of the mining rights at the major Tshipi manganese project to Jupiter have been approved by the South African authorities.

 

Resource Star Ltd (ASX:RSL)(26.9% held):

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31svmqfytd37j3.pdf .

 

Completion of the RC drill programme at the Machinga Rare Earth Project in Malawi, where the Company's farm-in partners Globe Metals and Mining Ltd are operators, was delayed due to the need to replace a rig during drilling. Results are now expected during October.

 

The helicopter magnetics/radiometrics over the Ilomba Hill uranium/niobium/rare earth prospect in Northern Malawi was completed, and announcement of results will be made shortly.

 

The drill programmes at Livingstonia in Malawi, to expand the Inferred uranium Resource, and in the Northern Territory of Australia, where multiple targets exist in the Edith River licenses, and some strong prospects are being tested, will commence during October.

 

Enquiries:

 

Regency Mines PLC Andrew Bell, Chairman 0207 402 4580

Sandra Spencer, Public and

Investor Relations 0207 402 4580

 

Nominated Adviser

Religare Capital Markets Peter Trevelyan-Clark/Ben Jeynes 020 7444 0800

 

Broker

Simple Investments Ltd Nick Emerson 01483 413500

 

 

 

 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFLVALIIVII
Date   Source Headline
23rd Apr 20157:00 amRNSAustralian Associate interest in Sugar Dragon
20th Apr 20155:28 pmRNSHolding(s) in Company
16th Apr 201511:58 amRNSBond repayment, convertible bond conversion
14th Apr 20154:00 pmRNSShare Incentive and Directors' Dealings
14th Apr 20153:34 pmRNSAttendance at UK Investor Show
14th Apr 20157:00 amRNSColumbian Gold Assets - Sale Agreement
2nd Apr 20157:00 amRNSLoan Repayment and Convertible Note Conversion
31st Mar 20154:55 pmRNSTotal Voting Rights
30th Mar 20156:09 pmRNSHolding(s) in Company
26th Mar 20155:07 pmRNSHolding(s) in Company
25th Mar 20152:25 pmRNSReplacement: Ivory Coast Update
25th Mar 201512:18 pmRNSIvory Coast Update
25th Mar 201510:02 amRNSInterim Results
25th Mar 20157:00 amRNSConvertible Note Conversion
19th Mar 201512:02 pmRNSFinancing Update
13th Mar 201511:03 amRNSUpdate
6th Mar 20156:16 pmRNSConvertible Note Conversion and Issue of Equity
4th Mar 20154:15 pmRNSHolding(s) in Company
2nd Mar 20155:50 pmRNSUpdate and Placing
27th Feb 20156:18 pmRNSDirector/PDMR Shareholding
18th Feb 201512:10 pmRNSUpdate
30th Jan 20157:00 amRNSIvory Coast and Colombia Update
6th Jan 201511:50 amRNSIssue of Convertible Loan Note
31st Dec 201412:16 pmRNSTotal Voting Rights
23rd Dec 20141:32 pmRNSResult of AGM, Capital Re-organisation
22nd Dec 201411:04 amRNSClarification
10th Dec 20143:34 pmRNSIvory Coast and Colombian Update
4th Dec 201411:55 amRNSNotice of AGM, proposed capital re-organisation
25th Nov 20145:25 pmRNSHolding(s) in Company
25th Nov 201411:59 amRNSIssue of Equity and TVR
21st Nov 201411:18 amRNSFinal Results for the year ended 30 June 2014
21st Nov 201411:15 amRNSUpdate - Colombian Asset Sale
19th Nov 20148:36 amRNSUpdate - Jupiter, Columbia, and Ivory Coast
13th Nov 20142:35 pmRNSUpdate on Resource Star
20th Oct 20143:14 pmRNSResult of General Meeting
16th Oct 20147:00 amRNSUpdate on Resource Star
14th Oct 20147:00 amRNSUpdate on Resource Star
13th Oct 201410:59 amRNSSale of Colombian Interests - Update
2nd Oct 20147:00 amRNSNotice of General Meeting
30th Sep 20146:08 pmRNSTotal Voting Rights
18th Sep 20144:27 pmRNSPlacement of Shares and Ivory Coast Update
11th Sep 201412:15 pmRNSExtension of Exclusivity - Update
1st Sep 20147:05 amRNSUpdate on Jupiter Mines and Resource Star
1st Sep 20147:00 amRNSChange of Adviser
29th Aug 20146:25 pmRNSPlacement of Shares
29th Aug 20145:36 pmRNSHolding(s) in Company
21st Aug 20142:36 pmRNSHolding(s) in Company
12th Aug 20147:00 amRNSExtension of Exclusivity - Colombia
11th Aug 20145:48 pmRNSConvertible Loan Note Conversion & Issue of Equity
11th Aug 201411:55 amRNSChange of Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.