Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0255    0.00 (0.00%)
Bid:
0.024
Ask:
0.027
Spread: 0.003 (12.50%)
Market Cap: £2.44m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update

30 Sep 2010 14:13

RNS Number : 6249T
Red Rock Resources plc
30 September 2010
 



RED ROCK RESOURCES PLC

Update

Dated: 30 September 2010

 

Red Rock Resources plc ("Red Rock" or the "Company"), the gold mining and exploration company with projects in Kenya and Colombia, and interests in steel feed and uranium, reports on progress at its operations.

 

·; Colombian plant ahead of schedule

·; Increase in initial planned capacity at El Limon plant

·; Metallurgical analysis to determine tailings process route under way in Kenya

·; Annual results released at Jupiter Mines Ltd and Resource Star Ltd

 

Colombia gold project:

 

The final $400,000 loan tranche has been advanced to Mineras Four Points SA ("MFP"). The entire $2,000,000 loan to MFP required under the terms of the Funding and Co-Operation Agreement ("Agreement") announced on 10th June 2010 has now been advanced, from funds provided by Red Rock.

 

There are no further performance requirements on the part of Red Rock, and MFP has provided security as required by Red Rock, so that the Agreement is fully operative.

 

At the El Limon mine, the target date for the plant renovation to be complete and for production to recommence is still 30th November 2010, although currently work is ahead of schedule. The initial capacity is now planned at 150 tons per day rather than the previous target of 100 tons per day.

 

Mine safety work has proceeded well, with a second access now provided up to Level 0, and planned to be brought up to surface. Improvements to the ventilation system and replacement of air piping, and installation of the new winch, wire and bucket, are accomplished.

 

A substation with 1000 KW transformers is almost complete, and back up generators with 800 KW capacity are expected to be refurbished and operational within one month. Rewiring within the plant is not accomplished, but is estimated to take two weeks.

 

The last work on the conveyors, crushers, and mill is being completed, with an estimated timing of 10 days to 3 weeks.

 

The plant is near completion, with new 5 ton tanks expected to be installed within 2 weeks, and some adjustments to parts of the circuit likely to be required to fine-tune the plant after receipt of metallurgical test results from Canada, which are expected to arrive on Monday [4] October 2010. 

 

Labour relations with staff who have accepted the new contracts are good; some contractors however have not signed new contracts, and those who do not will not be retained when their current contracts expire in two months.

 

Expansion of the plant to 250 tons per day would require investment by MFP in expansion of the mill capacity and additional tanks, and could be put in place rapidly. Expansion to 400 tons per day would require plant investment of an estimated $620,000 and a new vertical shaft with an estimated cost of $500,000. Planning for expansion is under way.

 

Red Rock's consultant geologist in Colombia has established that the vein is thickening, with significantly higher grade, at the lowest levels of the mine now being developed, particularly at Level 6 south where the vein is over 1m thick. A tunnel is being driven from Level 0 to locate an expected second vein.

 

At the La Aurora/Machuca mine, buildings and sub-station are now in place, with a new winch, and the crushing plant has been delivered. Priority is being given to completing the works at El Limon.

 

Migori gold project: An initial report and analysis

 

Analysis of the VTEM and Magnetic/Radiometric airborne surveys continues, with a a final report expected in October 2010. Multiple targets have been identified.

 

Metallurgical testwork results on the Macalder tailings samples have been received from Amdel Laboratories, and are being analysed. An update with initial conclusions as to process route and timings will follow shortly.

 

Red Rock expects to finalise a drill programme during October 2010.

 

Jupiter Mines Ltd (ASX:JMS)(22.64% held declining to 5.23% on completion of Jupiter Mines Ltd's acquisition of the Tshipi manganese project): 

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31stb4lflbm99y.pdf .

 

Jupiter Mines Ltd continues to prioritise exploration of the Mt Ida magnetite project, where Red Rock has a 1.5% gross production royalty.

 

The transfer of the mining rights at the major Tshipi manganese project to Jupiter have been approved by the South African authorities.

 

Resource Star Ltd (ASX:RSL)(26.9% held):

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31svmqfytd37j3.pdf .

 

Completion of the RC drill programme at the Machinga Rare Earth Project in Malawi, where the Company's farm-in partners Globe Metals and Mining Ltd are operators, was delayed due to the need to replace a rig during drilling. Results are now expected during October.

 

The helicopter magnetics/radiometrics over the Ilomba Hill uranium/niobium/rare earth prospect in Northern Malawi was completed, and announcement of results will be made shortly.

 

The drill programmes at Livingstonia in Malawi, to expand the Inferred uranium Resource, and in the Northern Territory of Australia, where multiple targets exist in the Edith River licenses, and some strong prospects are being tested, will commence during October.

 

Enquiries:

 

Regency Mines PLC Andrew Bell, Chairman 0207 402 4580

Sandra Spencer, Public and

Investor Relations 0207 402 4580

 

Nominated Adviser

Religare Capital Markets Peter Trevelyan-Clark/Ben Jeynes 020 7444 0800

 

Broker

Simple Investments Ltd Nick Emerson 01483 413500

 

 

 

 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFLVALIIVII
Date   Source Headline
7th Apr 20167:00 amRNSIssue of Shares and Directors' Dealings
31st Mar 20167:00 amRNSUnaudited half-yearly results period ended 31 Dec
24th Mar 20167:00 amRNSShoats Creek Update
7th Mar 20167:00 amRNSShoats Creek Update
22nd Feb 20167:00 amRNSUpdate and significant shareholding
2nd Feb 20167:00 amRNSInfrastructure and production at Shoats Creek
1st Feb 20166:30 pmRNSGrant of Options and Directors' Shareholdings
1st Feb 20161:36 pmRNSTotal Voting Rights
29th Jan 20167:00 amRNSPartial sale of holding, update
22nd Jan 20164:24 pmRNSShare Incentive Plan and Directors' Dealings
20th Jan 20167:00 amRNSInvestment
31st Dec 201512:04 pmRNSTotal Voting Rights
30th Dec 201512:07 pmRNSHolding(s) in Company
29th Dec 20155:56 pmRNSPartial Sale of Holding
21st Dec 20152:47 pmRNSResult of AGM, Board change Capital reorganisation
18th Dec 201511:21 amRNSDirector/PDMR Shareholding
16th Dec 20151:11 pmRNSLoan Repayment and Update
14th Dec 20156:05 pmRNSIssue of Equity
10th Dec 20157:00 amRNSUpdate on Star Striker Limited
2nd Dec 20157:00 amRNSPartial sale of holding
27th Nov 20155:40 pmRNSUpdate on Shoats Creek Oil Project
17th Nov 201512:49 pmRNSOperations Update
12th Nov 20159:49 amRNSFinal Results for the Year Ended 30 June 2015
9th Nov 20155:46 pmRNSTotal Voting Rights
5th Nov 20157:00 amRNSUpdate on Star Striker Ltd
28th Oct 20157:00 amRNSOption to Invest in Shoats Creek
19th Oct 201511:32 amRNSHolding(s) in Company
16th Oct 20157:01 amRNSHolding(s) in Company
16th Oct 20157:00 amRNSHolding(s) in Company
9th Oct 20152:34 pmRNSConvertible Note Conversion
5th Oct 20157:00 amRNSUpdate; Restructuring
21st Sep 20154:46 pmRNSOperations Update
4th Sep 20155:59 pmRNSConvertible Loan Note
1st Sep 20156:26 pmRNSTotal Voting Rights
27th Jul 201511:10 amRNSHolding(s) in Company
15th Jul 20156:08 pmRNSHolding(s) in Company
13th Jul 20157:00 amRNSFinal Tranche of Subscription Shares
8th Jul 20156:18 pmRNSUpdate on Subscription and Directors' Dealings
8th Jul 20157:00 amRNSInvestment and Share Subscription
30th Jun 20154:40 pmRNSSecond Price Monitoring Extn
30th Jun 20154:35 pmRNSPrice Monitoring Extension
30th Jun 20154:22 pmRNSBoard Changes
30th Jun 20151:10 pmRNSUpdate on Resource Star Ltd
26th Jun 20153:43 pmRNSUpdate
26th Jun 20157:00 amRNSOption to invest in Elephant Oil Limited
27th May 201510:10 amRNSUpdate
15th May 20156:22 pmRNSCompletion of Colombian Sale and Update
7th May 20157:00 amRNSKenya Update
1st May 20157:00 amRNSColombian Gold Assets - Sale Agreement
23rd Apr 20154:44 pmRNSConvertible Note Conversion

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.