Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.025    -0.0005 (-1.96%)
Bid:
0.024
Ask:
0.026
Spread: 0.002 (8.333%)
Market Cap: £2.39m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update

18 Aug 2010 15:51

RNS Number : 2878R
Red Rock Resources plc
18 August 2010
 



RED ROCK RESOURCES PLC

Update

Dated: 18 August 2010

 

Red Rock Resources plc ("Red Rock" or the "Company"), the gold mining and exploration company with projects in Kenya and Colombia, and interests in steel feed and uranium, reports on progress at its operations.

 

Mineras Four Points SA ("MFP")/Colombia gold project (Loan advance, options to acquire 51%):

 

The new jaw and cone crushers, engine, and other plant have been delivered to the El Limon mine and will be installed within two weeks, and other equipment is being delivered shortly. Sand blasting and inspection for corrosion of existing conveyers and outdoor plant, and a programme of electrical works at the plant, have begun. The first phase of safety and access improvements underground are near completion. The target date for the plant renovation to be complete and for production to recommence at 100 tons per day is now 30th November 2010.

 

At La Aurora a new crushing plant with conveyors has been delivered and is being installed this week. La Aurora is targeted to be operational and to supply the El Limon processing plant with up to 20 tons per day by the 30th November 2009.

 

30% of staff have already been transferred to the new contracts as part of the process of reorganization and modernization, and the environmental plan has been delivered to the authorities.

 

The license area is being remapped, and the first stage of this remapping is expected to be concluded in the next week. The Company's consultant geologist has provisionally identified a new sulphide-bearing vein running close to and east of the main vein, and 20 cm wide at surface, and further exploration continues to establish its continuity and mineralisation.

 

US$ 1 million has to date been advanced under the Funding and Co-operation Agreement with MFP with a second tranche drawdown of US$ 500,000 expected during September. Scheduled production commencement at 30 November should enable payment of the Company's first consultancy fee of US$200,000 in arrears for the quarter ending 31 December 2010.

 

Mid-Migori Mining Company/Migori gold project (15% interest with option to increase to 60%):

 

The fixed wing magnetic/radiometric survey comprising 3,117 line kilometers flown at 30m height, with 2,295 line kilometers flown at a 200m spacing and 822 infill kilometers flown at a 50m spacing, began on schedule on 16 August, and is expected to be completed within seven days. Initial results are expected by mid-September.

 

Preliminary interpretation of the 378 line kilometer VTEM programme flown at 50m height on lines at 100m intervals in the vicinity of the Macalder VMS mine has been received ahead of the expected schedule, and although no additional targets were identified along strike of the Macalder mine, some possible base metal targets have been generated within the survey area.

 

Leaching testwork has begun on the Macalder tailings samples at Amdel Laboratories, and the full testwork results should be available by late September.

 

CSA Global Ltd are completing a JORC Resource estimate of the Macalder tailings, the results of which are expected imminently.

 

Red Rock expects to finalise a drill programme of 5,000 metres to 10,000 metres during September.

 

Jupiter Mines Ltd (ASX:JMS)(22.6/5.23% held): 

 

The Extraordinary General Meeting of Jupiter Mines Ltd shareholders to approve the acquisition of the Tshipi manganese mine in South Africa took place on 12 August and approved all resolutions. Completion is expected shortly, at which stage the Company's interest will be diluted to 5.23%.

 

Resource Star Ltd (ASX:RSL)(26.3% held):

 

The RC drill programme at the Machinga Rare Earth Project in Malawi, where the company's farm-in partners Globe Metals and Mining Ltd are operators, continues.

 

New Resolution Geophysics (NRG) began to fly 270 line kilometers of helicopter magnetics/radiometrics, at 20-30m height and on a 50m line spacing, over the Ilomba Hill uranium/niobium/rare earth prospect in N Malawi last week. This programme was 20% complete when it had to be abandoned due to bad weather, and NRG will return shortly to complete it.

 

Planning continues for the drill programmes at Livingstonia in Malawi, and in the Northern Territory of Australia, each of which needs to be completed by mid-November to avoid the rains.

 

On 9 August RSL announced the results so far of its Edith River uranium project in Australia's Northern Territory. First pass sampling confirmed the presence of significant levels of uranium in outcrop at the Tennysons Prospect in the Edith River Project and strongly-localised ground radiometric responses were mapped at both Hayes Ck South and O'Shea Hill along structural features associated with potential host rocks. RSL reported that exploration programs were being developed to test potential and that drilling is planned during 2010 at Hayes Ck South and Edith River -Tennysons.

 

 

Enquiries:

 

Andrew Bell

 

Sandra Spencer

0207 402 4580 or

07766 474849

 

0207 402 4580 or

07757 660 798

Red Rock Resources plc

 

 

Red Rock Resources plc

 

Chairman

 

 

Public and Investor Relations

Peter Trevelyan-Clark/

Ben Jeynes

020 7444 0800

Religare Capital Markets

Nominated Adviser

Nick Emerson

01483 413500

Simple Investments Ltd

Broker

 

 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFESTIITLII
Date   Source Headline
15th Aug 20127:00 amRNSMacalder Tailings Project Update
8th Aug 20127:00 amRNSIssue of Shares under Share Incentive Plan
1st Aug 20124:35 pmRNSKenya Update
25th Jul 201211:38 amRNSMikei Gold Project JORC Mineral Resource Estimate
24th Jul 20123:02 pmRNSReplacement Initial Results from Greenland
23rd Jul 20124:40 pmRNSSecond Price Monitoring Extn
23rd Jul 20124:35 pmRNSPrice Monitoring Extension
18th Jul 20127:00 amRNSInitial results from Greenland maiden drill season
17th Jul 20127:00 amRNSProposed Disposal of Interest in Colombia
10th Jul 20124:37 pmRNSFurther drilling results for Mikei Gold Project
3rd Jul 201211:00 amRNSChange of Adviser
2nd Jul 20122:59 pmRNSMigori Project
27th Jun 201210:45 amRNSDrilling Commences at Melville Bugt Iron Project
27th Jun 201210:00 amRNSUpdate on Mikei Gold Project
12th Jun 201211:39 amRNSUpdate on Jupiter Mines
1st Jun 20124:40 pmRNSSecond Price Monitoring Extn
1st Jun 20124:35 pmRNSPrice Monitoring Extension
18th May 20122:47 pmRNSUpdate on Greenland
17th May 20124:40 pmRNSSecond Price Monitoring Extn
17th May 20124:35 pmRNSPrice Monitoring Extension
15th May 201210:31 amRNSUpdate on Resource Star Limited
30th Apr 20127:00 amRNSTotal Voting Rights
26th Apr 20124:34 pmRNSDrilling update - Nyanza Prospect
19th Apr 20125:45 pmRNSAgreement with Ariel Partners LLP
16th Apr 20125:08 pmRNSShare Incentive Plan, Directors' Dealing
12th Apr 201210:47 amRNSColombia - Quarterly Update
11th Apr 201211:14 amRNSAircore drilling
10th Apr 20127:00 amRNSPartial Sale of Royalty Interest
2nd Apr 20125:34 pmRNSAcquisition of Cue Resources Ltd by Uranium Energy
27th Mar 20127:00 amRNSResource Star Limited - Rights Issue
26th Mar 20127:00 amRNSHalf Yearly Report
29th Feb 20123:28 pmRNSIssue of Equity
29th Feb 20129:59 amRNSTotal Voting Rights
28th Feb 20121:41 pmRNSIssue of Equity
27th Feb 201210:44 amRNSResource Star Limited - Rights Issue
23rd Feb 201210:44 amRNSIssue of Equity
20th Feb 20126:30 pmRNSColombia video
20th Feb 20124:40 pmRNSSecond Price Monitoring Extn
20th Feb 20124:35 pmRNSPrice Monitoring Extension
6th Feb 20127:00 amRNSProposed Partial Sale of Royalty Interest
2nd Feb 20122:06 pmRNSResource Star Limited - Rights Issue
2nd Feb 201212:06 pmRNSScoping Study
2nd Feb 20127:00 amRNSRed Rock Acquires Option In Kansai Mining
31st Jan 20122:28 pmRNSTotal Voting Rights
30th Jan 20123:08 pmRNSre Jupiter Mines Limited
27th Jan 20124:40 pmRNSSecond Price Monitoring Extn
27th Jan 20124:35 pmRNSPrice Monitoring Extension
25th Jan 20123:37 pmRNSTotal Voting Rights
25th Jan 20123:34 pmRNSIssue of Equity
24th Jan 20129:45 amRNSUranium Energy Corp to acquire Cue Resources Ltd.

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.