Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
346.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 4.00 (1.149%)
Market Cap: £3.42b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Drilling Report

26 May 2005 07:01

Vane Minerals PLC26 May 2005 VANE Minerals plc (AIM: VML) Results of Latest Drilling Programmes VANE Minerals Plc ("VANE") is pleased to announce the successful completion ofthe first round of exploration drilling at the Guadalcazar project in the stateof San Luis Potosi, Mexico as well as completion of second-stage drilling atMina Charay in the state of Sinaloa, Mexico. Guadalcazar: Approximately 1,067 metres of HQ core were obtained from 12 drill holes locatedon a spacing of approximately 500 metres. Anomalous values of gold and silverwere detected in every hole drilled. Initial assays indicate gold and silvervalues as high as 0.5 g/t and 38 g/t respectively. Bedrock limestone was foundto be hydrothermally altered (marbleised) in several holes located in thewestern part of the district. A programme of check assaying is now underway to confirm analytical results. Thedrill core samples will also be analyzed for tin and mercury as thisinformation, along with the marbleised zones will aid in directing futuredrilling toward more strongly mineralized centre(s) that will be the object of asecond round of drilling. This is planned for later this summer. Mina Charay: A second round of diamond drilling has now been completed at Mina Charayconsisting of 12 holes and bringing the total number of holes completed to 19.Nine of these holes intersected mineralized veins with a weighted average goldgrade of 12.41 g/t and weighted average silver grade of 112.42 g/t over anaverage core length of 2.2 m corresponding to a true vein thickness ofapproximately 2 m. The nine holes are all located within a zone 200 metres longwhich trends N70E. The holes in question are all parallel, bearing S20E, andinclined at -45 to -60 degrees to the south. Holes are spaced 25 to 50 metresapart along the 200-metre length of the vein system. Mineralization remains openat depth and possibly to the west. The mineralized intersections for Mina Charay are summarized below: Initial Drilling Campaign DDH# Interval(m) Core length (m) Au g/t Ag g/t 1 17.7 - 18.3 0.6 5.59 185.11A 25.6 - 28.5 2.9 24.94 290.12 26.0 - 27.4 1.4 10.10 30.93 51.3 - 53.5 2.2 1.93 29.44 30.2 - 34.0 3.8 6.09 63.4 Second (Current) Drilling Campaign 7 31.4 - 35.2 3.8 7.06 99.38 54.9 - 57.9 3.0 20.34 70.414 25.6 - 25.9 0.3 11.86 24.015 39.9 - 42.0 2.2 19.45 172.7 Based on the high-grade nature of the mineralization, the relatively shallowdepth and continuity along the 200-metre strike length of the vein system, VANEintends to initiate a third drilling campaign in order to define a resource andassist in the development plan. Michael Spriggs, Chairman of VANE, comments, "The results at Guadalcazarcorroborate our belief in the widespread nature of the gold and silvermineralisation across this potentially major project, as well as confirming thatthe deposit is indeed hydrothermal. We will now concentrate our efforts onidentifying higher grade areas of mineralisation through the second round ofdrilling. We are also very encouraged with the progress being made at MinaCharay and will continue to move this forward as quickly as possible." Background: Guadalcazar is a large newly recognised hydrothermal system, previously thoughtto be alluvial until recently defined by the VANE team. The project is directlyfrom the Freeport-McMoRan Copper and Gold Co. Exploration Database that isavailable exclusively to the Company and therefore is subject to the agreementthe Company has with Freeport-McMoRan (details of which can be found at thecompany's website www.vaneminerals.com). The exploration licence covers an areaof over 20km(2). Within this large area, through geochemical and geophysicalsampling, the Company has identified drilling targets which the Company believesmay lead to a large gold deposit. VANE entered into an option agreement to acquire Mina Charay in September 2004.The Company believes the prospect could be fast tracked into production and maytherefore offer the potential for generating rapid cash flow. This is in linewith VANE's strategy when it acquired the high grade Diablito gold / silverproperty ("Diablito") in the state of Nayarit, Mexico. If successful, cash flowfrom production at Diablito and/or Mina Charay will enable the Company to expandits exploration programme and will allow further expansion of its assetportfolio without over-extending its resources. Enquiries: VANE Minerals plc Seymour Pierce Limited Parkgreen CommunicationsMatthew Idiens Jeremy Porter Justine Howarth / Cathy Malins020 7667 6322 020 7107 8000 020 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Oct 201111:01 amRNSResult of Meeting
4th Oct 20112:30 pmRNSDirector/PDMR Shareholding
29th Sep 20117:05 amRNSIssue of Equity and notice of GM
29th Sep 20117:00 amRNSHalf Yearly Report
19th Sep 20117:00 amRNSPorphyry Copper Exploration Update
12th Aug 20117:00 amRNSAppointment of new CEO
11th Jul 20117:00 amRNSPorphyry Copper Exploration Update, USA
8th Jul 20119:56 amRNSRenewal of Freeport Exploration Database Agreement
4th Jul 20117:00 amRNSIncreased Gold/Silver Production Results, Mexico
2nd Jun 201111:25 amRNSResult of AGM
18th May 20117:30 amRNSWate Uranium Project-Inferred Resource Update
13th May 20117:00 amRNSDrilling Commenced at Granite Gap Copper Project
11th May 20117:00 amRNSUranium Operations Update
4th May 20117:00 amRNSDirector/PDMR Shareholding
3rd May 20117:00 amRNSFinal Results
27th Apr 20117:00 amRNSNew Exploration Permits secured
4th Apr 20117:00 amRNSDrilling prgram commencement, copper targets, USA
22nd Mar 20117:00 amRNSDrilling Approvals Update, Copper Targets, USA
8th Mar 20117:00 amRNSIncrease of Inferred Resource at WATE Pipe
8th Feb 20117:00 amRNSWate Drilling Results
19th Jan 20117:00 amRNSJoint Venture Agreement, Mexico
20th Dec 20107:00 amRNSUpdate re McGhee Peak/Granite Gap copper projects
30th Nov 201011:30 amRNSTotal Voting Rights
24th Nov 20107:00 amRNSIssue of Equity
10th Nov 201012:17 pmRNSNI 43-101 Resource Report, Wate Pipe, Arizona
9th Nov 20107:00 amRNSBreccia Pipe Uranium Drilling Program Update
4th Nov 20107:00 amRNSChange of Adviser
29th Oct 20107:00 amRNSNI 43-101 resource statement at WATE Pipe, Arizona
8th Oct 201012:36 pmRNSDirector Shareholdings
8th Oct 201012:05 pmRNSHolding(s) in Company
6th Oct 201011:37 amRNSResult of General Meeting
6th Oct 20107:00 amRNSUpdate on Mexican JV
9th Sep 201010:46 amRNSHolding(s) in Company
6th Sep 20107:00 amRNSHalf Yearly Report
6th Sep 20107:00 amRNSIssue of Equity
27th Aug 20107:34 amRNSDirectorate Change
1st Jul 20107:00 amRNSAdditional High-grade Uranium Results, Wate Pipe
9th Jun 20102:40 pmRNSDirectors' Dealings
8th Jun 20107:00 amRNSAdditional copper targets acquired, southwest U.S.
7th Jun 20107:00 amRNSJoint Venture Agreement, Gold/Silver Mexico
1st Jun 201012:45 pmRNSAGM Statement
1st Jun 20107:00 amRNSAcquisition of Breccia Pipe Targets, US
26th May 20107:00 amRNSNI 43-101 Resource Report, Wate Uranium Pipe
26th Apr 20107:00 amRNSFinal Results
31st Mar 20107:00 amRNSUpdate on Copper Properties
1st Mar 20107:00 amRNSMaiden Resource Statement at Wate, Arizona
27th Jan 20107:00 amRNSAppointment of COO and 2010 Strategy
22nd Jan 20109:30 amRNSHolding(s) in Company
19th Jan 201012:01 pmRNSHolding(s) in Company
19th Jan 20107:00 amRNSAcquisition of New Uranium Property

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.