Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
338.00    -8.00 (-2.31%)
Bid:
344.00
Ask:
345.00
Spread: 1.00 (0.291%)
Market Cap: £3.34b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Drilling Report

26 May 2005 07:01

Vane Minerals PLC26 May 2005 VANE Minerals plc (AIM: VML) Results of Latest Drilling Programmes VANE Minerals Plc ("VANE") is pleased to announce the successful completion ofthe first round of exploration drilling at the Guadalcazar project in the stateof San Luis Potosi, Mexico as well as completion of second-stage drilling atMina Charay in the state of Sinaloa, Mexico. Guadalcazar: Approximately 1,067 metres of HQ core were obtained from 12 drill holes locatedon a spacing of approximately 500 metres. Anomalous values of gold and silverwere detected in every hole drilled. Initial assays indicate gold and silvervalues as high as 0.5 g/t and 38 g/t respectively. Bedrock limestone was foundto be hydrothermally altered (marbleised) in several holes located in thewestern part of the district. A programme of check assaying is now underway to confirm analytical results. Thedrill core samples will also be analyzed for tin and mercury as thisinformation, along with the marbleised zones will aid in directing futuredrilling toward more strongly mineralized centre(s) that will be the object of asecond round of drilling. This is planned for later this summer. Mina Charay: A second round of diamond drilling has now been completed at Mina Charayconsisting of 12 holes and bringing the total number of holes completed to 19.Nine of these holes intersected mineralized veins with a weighted average goldgrade of 12.41 g/t and weighted average silver grade of 112.42 g/t over anaverage core length of 2.2 m corresponding to a true vein thickness ofapproximately 2 m. The nine holes are all located within a zone 200 metres longwhich trends N70E. The holes in question are all parallel, bearing S20E, andinclined at -45 to -60 degrees to the south. Holes are spaced 25 to 50 metresapart along the 200-metre length of the vein system. Mineralization remains openat depth and possibly to the west. The mineralized intersections for Mina Charay are summarized below: Initial Drilling Campaign DDH# Interval(m) Core length (m) Au g/t Ag g/t 1 17.7 - 18.3 0.6 5.59 185.11A 25.6 - 28.5 2.9 24.94 290.12 26.0 - 27.4 1.4 10.10 30.93 51.3 - 53.5 2.2 1.93 29.44 30.2 - 34.0 3.8 6.09 63.4 Second (Current) Drilling Campaign 7 31.4 - 35.2 3.8 7.06 99.38 54.9 - 57.9 3.0 20.34 70.414 25.6 - 25.9 0.3 11.86 24.015 39.9 - 42.0 2.2 19.45 172.7 Based on the high-grade nature of the mineralization, the relatively shallowdepth and continuity along the 200-metre strike length of the vein system, VANEintends to initiate a third drilling campaign in order to define a resource andassist in the development plan. Michael Spriggs, Chairman of VANE, comments, "The results at Guadalcazarcorroborate our belief in the widespread nature of the gold and silvermineralisation across this potentially major project, as well as confirming thatthe deposit is indeed hydrothermal. We will now concentrate our efforts onidentifying higher grade areas of mineralisation through the second round ofdrilling. We are also very encouraged with the progress being made at MinaCharay and will continue to move this forward as quickly as possible." Background: Guadalcazar is a large newly recognised hydrothermal system, previously thoughtto be alluvial until recently defined by the VANE team. The project is directlyfrom the Freeport-McMoRan Copper and Gold Co. Exploration Database that isavailable exclusively to the Company and therefore is subject to the agreementthe Company has with Freeport-McMoRan (details of which can be found at thecompany's website www.vaneminerals.com). The exploration licence covers an areaof over 20km(2). Within this large area, through geochemical and geophysicalsampling, the Company has identified drilling targets which the Company believesmay lead to a large gold deposit. VANE entered into an option agreement to acquire Mina Charay in September 2004.The Company believes the prospect could be fast tracked into production and maytherefore offer the potential for generating rapid cash flow. This is in linewith VANE's strategy when it acquired the high grade Diablito gold / silverproperty ("Diablito") in the state of Nayarit, Mexico. If successful, cash flowfrom production at Diablito and/or Mina Charay will enable the Company to expandits exploration programme and will allow further expansion of its assetportfolio without over-extending its resources. Enquiries: VANE Minerals plc Seymour Pierce Limited Parkgreen CommunicationsMatthew Idiens Jeremy Porter Justine Howarth / Cathy Malins020 7667 6322 020 7107 8000 020 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
22nd Dec 20147:00 amRNSProduction commences at Mexico mine
18th Dec 20147:00 amRNSGrant of Drilling Permit for State 1-34 Well
17th Dec 20147:00 amRNSInitiation of Completion on 16-42 Paradox Well
8th Dec 20147:00 amRNSCommencement of work at 1st Mancos well site
5th Dec 20141:23 pmRNSCompletion of Placing and Subscription
1st Dec 20147:00 amRNSFundraising by way of a conditional placing
27th Nov 20147:00 amRNSDrilling contractor agreement signed
24th Nov 20147:00 amRNSState Unit Approval
13th Nov 20143:20 pmRNSAppointment of KPMG LLP as Auditor
7th Nov 20147:00 amRNSUpdated Ryder Scott Mancos Resource Estimate
5th Nov 20147:00 amRNSStrategic decision to focus on Utah
3rd Nov 20147:00 amRNSAcquisition of additional acreage in Utah & TVR
31st Oct 20143:00 pmRNSAnalyst site visit
24th Oct 20149:09 amRNSShareholdings in Company and TVR
21st Oct 20147:00 amRNSIssue of equity under farm-in agreement
15th Oct 20147:00 amRNSUpdate re. TC copper project
10th Oct 20147:30 amRNSGrant of options
10th Oct 20147:05 amRNSU.S. oil and gas technical team appointment
10th Oct 20147:00 amRNSCompletion of strategic acquisition
30th Sep 20147:00 amRNSHalf Yearly Report
15th Sep 20147:00 amRNSOil & Gas operations update and Technical Team
11th Sep 20147:00 amRNS"Drill ready" copper and molybdenum porphyry & JV
8th Sep 20147:00 amRNSMexico high-grade mine joint venture agreement
2nd Sep 20147:00 amRNSUtah Team Update
8th Aug 20147:00 amRNSDirectorate Change
5th Aug 20147:00 amRNSUtah Operations Update
31st Jul 20145:37 pmRNSTotal Voting Rights
25th Jul 20145:00 pmRNSDirector/PDMR Shareholding
10th Jul 20148:30 amRNSHolding(s) in Company
4th Jul 20141:30 pmRNSIssue of Equity
3rd Jul 20144:51 pmRNSHolding(s) in Company
3rd Jul 20144:46 pmRNSDirector/PDMR Shareholding
27th Jun 201410:07 amRNSResults of AGM and Total voting rights
24th Jun 20141:00 pmRNSTR-1: Notification of Major Interest in Shares
20th Jun 20147:00 amRNSOversubscribed conditional placing to raise £6.5m
19th Jun 20141:30 pmRNSConvertible loan note - issue of equity
10th Jun 201410:28 amRNSEnerCom Conference Presentation
6th Jun 20149:10 amRNSConvertible Loan Note
3rd Jun 20147:01 amRNSFinal Results and notice of AGM
3rd Jun 20147:00 amRNSAppointment of joint broker
23rd May 20147:01 amRNSPublication of Economic Analysis
23rd May 20147:00 amRNSPublication of Reserve Report
16th May 20147:00 amRNSAdditional acreage in Utah
2nd May 20147:00 amRNSResults from MDU in the Paradox Basin
20th Mar 20147:06 amRNSQ4 2013 operational update
20th Mar 20147:00 amRNSNew Investor Presentation
17th Mar 20147:00 amRNSFarm-in agreement on significant US O&G project
12th Mar 20148:36 amRNSWeiden Basin hydrocarbon licence completed
4th Mar 20147:00 amRNSJoint venture agreement with Lowell Copper Ltd.
31st Jan 20147:01 amRNSBoard Changes

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.