Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
346.00    -4.00 (-1.14%)
Bid:
348.00
Ask:
352.00
Spread: 4.00 (1.149%)
Market Cap: £3.42b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Drilling Report

18 Feb 2005 07:02

Vane Minerals PLC18 February 2005 VANE Minerals plc Initial Assay Results Show Strong Mineralisation At Mina Charay Property VANE Minerals ("VANE" or "the Company") announces encouraging assay results fromthe first phase of its drilling programme at the Mina Charay gold / silverproperty in Sinaloa, Mexico. Assays from the seven drill holes recentlycompleted indicate the presence of a high grade mineralised vein, with gradesranging as high as 36.82g of gold ("Au") per tonne and 706.2g of silver ("Ag")per tonne. VANE has followed up this programme with further geophysical work andintends to carry out further drilling. Mineralisation, alteration and metal values show a distinct increase along thevein moving from east to west. A VLF (Very Low Frequency geophysics) surveysuggests that the vein is offset to the north. Hole 6, intended to offset to thewest the strong mineralisation in hole 1, was inadvertently collared on thesouth side of the nearly vertical vein and consequently failed to intersect it.In addition, there is a large area of shallow cover located to the west fromwhich VANE has obtained gold values in shallow pits, suggestive of bulk grademineralisation. In order to allow time for the additional drilling, the Company has negotiatednew terms with the property owner, Minera PAFEX, S.A. de C.V., postponing theJanuary US$75,000 option payment until July 2005, with a US$20,000 payment duenow, a further US$10,000 in May and US$10,000 in June. The Company still retainsthe right to withdraw from the property at any stage with no further financialobligation. Full details of the original schedule of option payments can befound on VANE's website (http://www.vaneminerals.com). Half of the sawn drill core from the vein was bagged and shipped to JacobsLaboratories in Tucson, Arizona for analysis and the remainder of the core hasbeen stored on site. Core recovery during the current programme has beensatisfactory. Holes are numbered from 5 to 1 moving from east to west. Hole No.6, intended to offset Hole 1, is located west of Hole 1. Mina Charay Drilling Programme: Assay Results Hole Intersection From To Width Au g/t Au oz/t Ag g/t Ag oz/t (m) (m) (m)MCDDH 01_01_1 17.7 18.3 0.6 5.59 0.163 185.1 5.4MCDDH 01_A_1 25.6 26.5 0.9 36.82 1.074 706.2 20.6 01_A_2 26.5 27.5 1 13.3 0.388 130.3 3.8 01_A_3 27.5 28.5 1 25.88 0.755 75.4 2.2 01_A_4 39.7 40 0.3 0.31 0.009 24 0.7 MCDDH 02_01_1 6.2 7.2 1 8.5 0.248 29.1 0.85 02_01_2 7.2 8.2 1 2.4 0.07 39.4 1.15 02_01_3 26 26.7 0.7 9.26 0.27 29.1 0.85 02_01_4 26.7 27.4 0.7 10.94 0.319 32.6 0.95 MCDDH 03_01_1 34 35 1 0.51 0.015 5.1 0.15 03_01_2 51.3 52 0.7 0.48 0.014 17.1 0.5 03_01_3 52 52.75 0.75 3.7 0.108 49.7 1.45 03_01_4 52.75 53.5 0.75 1.51 0.044 20.6 0.6 MCDDH 04_01_1 30.2 30.7 0.5 2.02 0.059 106.3 3.1 04_01_2 31 31.6 0.6 13.09 0.382 140.5 4.1 04_01_3 31.6 32.8 1.2 1.44 0.042 32.6 0.95 04_01_4 32.8 34 1.2 8.95 0.251 37.7 1.1 MCDDH 05_01 Trace only MCDDH 06_01 Trace only Background: VANE entered into an option agreement to acquire Mina Charay in September 2004.The Company believes the prospect could be brought quickly into production andmay therefore offer the potential for generating rapid cash flow. This is inline with VANE's strategy when it acquired the high grade Diablito gold / silverproperty ("Diablito") in Nayarit, Mexico. If successful, cash flow fromproduction at Diablito and/or Mina Charay will enable the Company to expand itsexploration programme and will allow further expansion of its asset portfoliowithout over-extending its resources. Update: The Company also announces that it is in advanced stages of negotiation with amining contractor to develop Diablito and that it expects to be able to make afull announcement on this in the near future. The development plan has beencompleted and first production is expected to be ahead of schedule. At the Company's Guadalcazar property in San Luis Potosi, Mexico, a drilling rigis expected to arrive on site in late February 2005 and drilling is expected tocommence shortly thereafter. Eight drill targets have been initially identified,with a total of 22 holes budgeted. Michael Spriggs, Chairman of VANE, commented, "These encouraging latest drillingresults indicate that, at Mina Charay, Vane Minerals is developinganother potentially significant gold/silver deposit in Mexico. Coupled withthe progress at Diablito and its larger Guadalcazar project, these developmentsprovide further confirmation that the Company remains firmly on track to achievethe objectives set out at the time of its AIM flotation in June last year". Enquiries: VANE Minerals plc Seymour Pierce Limited Parkgreen CommunicationsMatthew Idiens Sarah Wharry Justine Howarth / Cathy Malins020 7667 6322 020 7107 8000 020 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st May 20185:00 pmRNSTotal Voting Rights
29th May 20185:11 pmRNSHolding(s) in Company
24th May 20184:22 pmRNSHolding(s) in Company
21st May 201811:28 amRNSResult of general meeting and Total Voting Rights
11th May 20183:33 pmRNSHolding(s) in Company
3rd May 201811:30 amRNSNotice of general meeting and posting of circular
3rd May 20189:15 amRNSCorporate presentation
2nd May 20187:16 amRNSIssue of Equity and proposed general meeting
19th Apr 201811:39 amRNSUpdate on operations in Paradox Basin, Utah U.S.A.
9th Apr 20182:20 pmRNSDirector/PDMR Shareholding
9th Apr 201811:35 amRNSDirector/PDMR Shareholding
9th Apr 20188:25 amRNSGrant of Options
4th Apr 20187:00 amRNSIncreased acreage in Paradox Basin, Utah, U.S.A
20th Mar 20181:03 pmRNSOperations update
29th Jan 20187:00 amRNSMultiple drilling targets identified by 3D seismic
18th Jan 20184:39 pmRNSNAPE Summit Global Business Conference 2018
22nd Dec 201711:07 amRNSDirector/PDMR Shareholding
4th Dec 20177:00 amRNSParadox Basin 3D Seismic and Operations Update
1st Dec 20177:00 amRNSCompletion of SDA Mill disposal
30th Nov 20174:05 pmRNSCorporate Presentation - Investor evening
16th Nov 201711:08 amRNSCorporate Presentation
9th Nov 20177:00 amRNSUpdate on SDA Mill disposal
7th Nov 20177:00 amRNSHolding(s) in Company
31st Oct 20175:00 pmRNSTotal Voting Rights
31st Oct 20173:52 pmRNSUpdate on SDA Mill disposal
25th Oct 20175:08 pmRNSHolding(s) in Company
24th Oct 20177:00 amRNSCompletion of 3D Seismic Shoot in Paradox Basin
12th Oct 20176:17 pmRNSHolding(s) in Company
10th Oct 20173:31 pmRNSHolding(s) in Company
9th Oct 201710:34 amRNSResult of General Meeting and Total Voting Rights
5th Oct 20177:00 amRNSCommencement of Recording at 3D Seismic Shoot
29th Sep 20175:00 pmRNSTotal Voting Rights
22nd Sep 201711:05 amRNSDirector/PDMR Shareholdings
22nd Sep 20177:00 amRNSIssue of equity to raise £3m, notice of GM and TVR
19th Sep 20177:00 amRNSPartnering agreement - mineral interests - Paradox
18th Sep 201711:31 amRNSResult of GM, ISIN change and total voting rights
18th Sep 20177:00 amRNSHalf-year Report
11th Sep 20177:00 amRNSSDA Mill disposal - SPA signed
1st Sep 20172:51 pmRNSProposed disposal, capital reorganisation & GM
31st Aug 20177:00 amRNSupdate re Seismic Shoot in the Paradox Basin
22nd Aug 20177:00 amRNSGrant of Permits for Paradox Basin Seismic survey
16th Aug 20177:00 amRNSUpdate re disposal of Mexican milling operations
1st Aug 20177:00 amRNSUpdate on the disposal of SDA Mill
24th Jul 201711:47 amRNSApproval for Paradox Basin Seismic survey
4th Jul 20177:00 amRNSUpdate re permitting process & directorate change
29th Jun 20179:57 amRNSResult of AGM
6th Jun 20177:00 amRNSFinal results & notice of AGM
1st Jun 20177:00 amRNSUpdate re disposal of Mexican milling operations
3rd May 20177:00 amRNSMexican IVA recovery update
2nd May 20177:00 amRNSUpdate on Paradox Basin permitting process

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.