Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockpool Acqui Regulatory News (ROC)

  • This share is currently suspended. It was suspended at a price of 2.85

Share Price Information for Rockpool Acqui (ROC)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £362.66k
ROC Live PriceLast checked at - London Stock Exchange

Intraday Rockpool Acqui Share Chart

Drilling Activity Update

23 Feb 2005 07:02

Roc Oil Company Limited23 February 2005 23 February 2005 ROC OIL COMPANY LIMITED ("ROC") STOCK EXCHANGE RELEASE DRILLING ACTIVITY UPDATE KEY POINT β€’ Cliff Head-5 ("CH-5"), an appraisal well in the Cliff Head Oil Field, offshore Western Australia, has encountered the top of the anticipated reservoir substantially low to prognosis. Roc Oil (WA) Pty Ltd, as Operator of the WA-286-P Joint Venture (the "JointVenture"), advises that the CH-5 appraisal well has encountered the top of theanticipated reservoir approximately 50 metres low to prognosis just above thefield wide oil-water contact and as of 0600 hours on Wednesday 23 February(Australian Western Standard Time) was drilling ahead at 1,492 metres tobasement. CH-5 is a vertical "pathfinder" well located about 1 km southeast of the CH-1discovery well (Attachment 1*). The pre-drill plan for CH-5 was that it beplugged and abandoned because its primary purpose was to determine the natureand extent of the reservoir in the East Ridge portion of the Cliff Headstructure so as to better define the location of a horizontal development well. It is currently not understood whether CH-5 has come in low to prognosis due toadverse seismic velocity variations which would have an adverse impact on fieldreserves, or due to drilling inadvertently on the wrong side of a nearby fault,which would probably have a less severe impact on field reserves. The Joint Venture is actively reviewing the data obtained to date and willintegrate that information with the results of the logging programme over thenext 48 hours. At the moment, it is too early to comment definitively as towhether or not CH-5 was optimally located in relation to a nearby fault. If thefull data set indicates that the CH-5 location was less than structurallyoptimal, the Joint Venture may consider sidetracking the well. Regardless of the outcome of CH-5, upon completion of well operations the rigwill move to drill the CH-6 development well location in the main horst part ofthe Cliff Head structure. Commenting on preliminary results from CH-5, Dr John Doran, ROC's ChiefExecutive Officer, stated that: "With the results we have seen so far from CH-5 it is pretty clear why wedescribed the well as a 'pathfinder'. If we have ended up on the 'wrong side' ofthe fault, then the situation may possibly be rectified by a sidetrack to theeast. If, however, we are on the 'right' side of the fault, the fact that thetop reservoir has been encountered substantially lower than prognosed means thatwe need to greatly improve our understanding of the East Ridge portion of theCliff Head structure and this will impact on the details and timing of the FinalInvestment Decision for the development of the field." The WA-286-P Joint Venture comprises: Equity Roc Oil (WA) Pty Ltd (Operator).....................37.5% AWE Oil (Western Australia) Pty Ltd ................27.5% Wandoo Petroleum Pty Ltd ...........................24.0% Voyager (PB) Limited ................................6.0% CIECO Exploration and Production (Australia) Pty Ltd .................................5.0% *For Attachment 1 see copy of this release on ROC's website(http://www.rocoil.com.au/Pages/ASX_Releases/2005_Releases/February-2005.html) Bruce Clement For further information please contact:Chief Operating Officer Dr John Doran on Tel: +61-2-8356-2000 Fax: +61-2-9380-2635 Email: jdoran@rocoil.com.au Or visit ROC's website: www.rocoil.com.au Dr Kevin Hird General Manager Business Development Tel: +44 (0)207 586 7935 Fax: +44 (0)207 722 3919 Email: khird@rocoil.com.au Nick Lambert Bell Pottinger Corporate & Financial Tel: +44 (0)207 861 3232 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
22nd Jun 20057:01 amRNSMauritania Drilling Update
15th Jun 20057:00 amRNSActivity Update: China
3rd Jun 20057:00 amRNSArdmore Re-development Update
11th May 20057:02 amRNSResult of AGM
11th May 20057:02 amRNSCEO & Chairmans AGM Addresses
11th May 20057:02 amRNSFarmin to Jacala, WA
29th Apr 20057:01 amRNS1st Quarter Activities Report
14th Apr 20057:01 amRNSActivity Update - Angola
14th Apr 20057:01 amRNSPresentation to Shareholders
13th Apr 20057:01 amRNSAnnual Report and Accounts
13th Apr 20057:01 amRNSNotice of AGM
12th Apr 20057:01 amRNSRoc acquires Option
29th Mar 20057:01 amRNSDrilling Report
24th Mar 20057:02 amRNSDrilling Update: Hadda-1, WA
21st Mar 20057:03 amRNSBlock Admission Return
21st Mar 20057:03 amRNSOpen Briefing
17th Mar 20057:04 amRNSHadda-1 Commences Drilling
14th Mar 20057:01 amRNSDrilling Update: Cliff Head-6
14th Mar 20057:01 amRNSCliff Head Development
10th Mar 20057:01 amRNSDrilling Update: Cliff Head-6
7th Mar 20057:02 amRNSDrilling Update: Cliff Head-6
1st Mar 20057:03 amRNSMauritania Drilling Update
28th Feb 20057:03 amRNSROC's 2004 Financial Results
28th Feb 20057:03 amRNSDrilling Update: Cliff Head-6
25th Feb 20057:01 amRNSDrilling Update: Cliff Head-5
23rd Feb 20057:02 amRNSDrilling Activity Update
22nd Feb 20057:02 amRNSWeekly Progress Report
22nd Feb 20057:02 amRNSMauritania Drilling Update
21st Feb 20057:01 amRNSCliffHead 5 Drilling Commence
18th Feb 20057:02 amRNSSubstantial Shareholders
15th Feb 20057:01 amRNSMauritania Drilling Update
14th Feb 20057:01 amRNS2005 A$50M Drilling Programme
8th Feb 20057:02 amRNSMauritania Drilling Update
1st Feb 20057:01 amRNSMauritania Drilling Update
31st Jan 20057:01 amRNSQuarterly Report to 31 Dec 04
31st Jan 20057:01 amRNSUK Onshore Drilling Update
28th Jan 20057:01 amRNSROC places approx 10 shares
24th Jan 20057:00 amRNSSale of Saltfleetby Gas Field
24th Jan 20057:00 amRNSUK Onshore Drilling Update
24th Jan 20057:00 amRNSROC places approx 10M shares
20th Jan 20057:01 amRNSUpdate on Operations
18th Jan 20057:00 amRNSMauritania Offshore Drilling
17th Jan 20057:00 amRNSUK Onshore Drilling Update
13th Jan 20057:01 amRNSMauritania Offshore Update
11th Jan 20057:01 amRNSMauritania Offshore Update
11th Jan 20057:00 amRNSUK Onshore Drilling Report
4th Jan 20057:00 amRNSMauritania Offshore Drilling
4th Jan 20057:00 amRNSUK Onshore Drilling Update
4th Jan 20057:00 amRNSMauritania Drilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.