Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Surface Exploration Update

14 Sep 2017 07:00

RNS Number : 6941Q
Rambler Metals & Mining PLC
14 September 2017
 

14 September 2017

 

Rambler's Surface Drill Program Intersects Copper Mineralization at Depth Returning 40 meters of 1.42% Cu

 

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer is pleased to announce that the first hole from its surface exploration program has been completed. The drill hole has confirmed the depth extension of the two ores zones presently being mined on the property, the Ming Massive Sulphide ('MMS') and the Lower Footwall Zone ('LFZ'). Mineralized intersections include 6.30 meters of 2.85% Copper ('Cu') with 2.99 g/t Gold ('Au') in the massive sulphides; and 40 meters of 1.42 % Cu in the LFZ, including 7.57 meters of 2.27% Cu. This exploration hole was successful in confirming continued mineralization at depth with improved grades and thicknesses.

Exploration Update

· The diamond drill hole was drilled from surface to a depth of 1771 meters, returning mineralized intersections in both the high grade massive sulphides and the Lower Footwall Zone.

· Highlights of the first planned drill hole include:

Ming Massive Sulphides ('MMS')

Upper lens 1.02 meters of 1.63% Cu and 1.23 g/t Au

Lower lens 6.30 meters of 2.85% Cu and 2.99 g/t Au

 

Lower Footwall Zone ('LFZ')

40.00 meters of 1.42% Cu

Including 6.00 meters of 2.51% Cu and 7.57 meters of 2.27 % Cu

 

· These drill intersections are approximately 290 meters from the nearest drill hole up-plunge. Five additional holes are planned to explore for new mineralization over an area of one kilometer below the current known reserves.

Norman Williams, President and CEO, commented:

"The mineralized intersections reported from this first surface drill hole are very encouraging. This drill hole is ~300 meters from the known reserves and supports our understanding that grades and thickness of the LFZ are improving at depth. Continued drilling throughout the fall will be targeted to further expand the LFZ mineralization as we work through our Phase III engineering studies.

 

"In addition to the LFZ, this surface diamond drill hole also intersected the high grade massive sulphide zone approximately 640 meters down plunge from an active mining front in the Ming South Zone. Confirmation of the depth extension of the parallel high grade massive sulphide zones, including the Ming North, Ming South, 1806 and the 1807 Zones, with further drilling could allow for the continuation of the blending strategy currently being deployed at the operation. "As the Company continues to work on a potential Phase III expansion scenario, with an optimized mine and mill production plan, further success from this exploration program will play an important role in confirming the potential beyond the known mineralized trend. The drill program is anticipated to continue over the remainder of the year and project updates will be provided as information becomes available."

Lower Footwall Zone Surface Exploration

A directional surface drilling program has been initiated to test the down plunge continuity of the Lower Footwall Zone and Ming South massive sulphide zone, up to one kilometer beyond the currently known mineralized trend. The drilling collared in and penetrated the Upper Pacquet Harbour mafic sequence to the 1326 meter depth where it intersected the hanging wall/ footwall horizon. This horizon defines the contact with the underlying Rambler rhyolite and is host to the deposit we are mining and the 5 other past producing ore bodies in the Rambler camp. The massive sulphide lenses discovered in the drill hole are interpreted to be down plunge of the Ming South Zone and down plunge of an area with ongoing development headings. The two sulphide lenses returned grades of 1.63% Cu and 1.23 g/t Au over 1.02 m, and 2.85% Cu and 2.99 g/t Au over 6.30 m. The Lower Footwall Zone was intersected below 1371 meters and was represented by increasing chlorite alteration in association with increasing chalcopyrite stringers, all cut by un-mineralized mafic dykes. The grades returned from the LFZ included, 5.72 m of 1.46% Cu, 40.0 m of 1.44% Cu, 3.74 m of 2.38% Cu and 10.0 m of 1.35% Cu.

 

Drill hole R17-25a was completed to a total depth of 1771 meters and is the first of the planned six hole surface exploration drilling program testing the depth extension of the deposit. The second hole, R17-25b, has been cut-off from the RM17-25a parent hole at a depth 890 m utilizing Devico directional drilling. This second hole will further test the Ming South in the MMS and LFZ an additional 200 meters down plunge of R17-025a. Please see Appendix I for a complete listing of all assays received to date for this diamond drill hole.

 

Table 1 - Highlighted Significant Assay Results from RM17-25a

(See Note 1 and Appendix I below for further details)

 

Drill Hole

ZONE

From(m)

To(m)

Length(m)

Copper(%)

Gold(g/t)

Silver(g/t)

Zinc(%)

RM17-25a

MMS

1325.11

1326.13

1.02

1.63

1.23

17.51

0.77

RM17-25a

MMS

1336.85

1343.15

6.30

2.85

2.99

21.13

0.84

RM17-25a

LFZ

1428.00

1433.72

5.72

1.46

0.08

1.25

0.01

RM17-25a

LFZ

1449.00

1489.00

40.00

1.42

0.06

1.18

0.01

including

LFZ

1454.00

1460.00

6.00

2.51

0.11

2.18

0.01

including

LFZ

1471.00

1477.47

6.47

1.84

0.06

1.48

0.01

including

LFZ

1481.43

1489.00

7.57

2.27

0.07

1.42

0.01

RM17-25a

LFZ

1562.80

1566.54

3.74

1.87

0.13

3.77

0.02

RM17-25a

LFZ

1581.00

1591.00

10.00

1.35

0.05

1.84

0.12

 

Figure 1 - 3D Isometric of the Ming Mine with 2017 Surface Drill Holes

 

Click on, or paste the following link into your web browser, to view the associated PDF document.

 

http://www.rns-pdf.londonstockexchange.com/rns/6941Q_1-2017-9-13.pdf 

 

 

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its processes following which past results may be adjusted to reflect any changes. Core lengths can vary depending on the angle the drill hole intersects the mineralized body. True widths are estimate to range between 90-95% of core lengths.

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Rambler maintains an ongoing quality assurance and quality control program ('QA/QC') to ensure that exploration data collected adheres to all compliance regulations and CIM best practices. Rambler maintains written field procedures and has had independent audit and verification geological database and all data related to drilling, surveying, sampling and assaying.

 

Rambler's QA/QC program includes insertion of blanks, duplicates and standard samples in regular intervals. Analytical control measures for the drilling program involve both internal and external laboratory check samples to ensure that data received and used are accurate and reliable. Rambler has integrated the database management program MX Deposit as an effective and efficient way to manage assay data as well as QA/QC tracking and reporting.

 

All core samples assayed and pertaining to this report were completed by Eastern Analytical Limited located at Springdale, Newfoundland. Eastern Analytical Limited is an ISO 17025 accredited laboratory and bears no relationship to the Rambler.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's ongoing Phase II plans are to increase mine and mill production to 1,250 mtpd by the fall 2017. This initial expansion has been fully funded through CEII Mining's investment. Rambler will also continue advancing Phase III engineering studies with a view to further increase production to 2,000 mtpd at the Ming Mine.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

 

For further information, please contact:

 

Norman Williams, CPA,CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

 

Nominated Advisor (NOMAD)

 

Investor Relations

David Porter

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Nicole Marchand Investor Relations

Tel No: 416- 428-3533

Nicole@nm-ir.com

 

Website: www.ramblermines.com 

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

APPENDIX I - Assay listing for RM17-25a

Drill Hole

Sample No

From(m)

To(m)

Length(m)

Copper(%)

Gold(g/t)

Silver(g/t)

Zinc(%)

R17-25a

13501

1323.66

1324.16

0.50

0.01

0.15

0.60

0.01

R17-25a

13502

1324.16

1324.40

0.24

0.08

1.71

42.60

0.03

R17-25a

13503

1324.40

1325.11

0.71

0.06

0.23

1.40

0.11

R17-25a

13504

1325.11

1325.63

0.52

2.28

1.41

25.30

1.29

R17-25a

13505

1325.63

1326.13

0.50

0.96

1.04

9.40

0.23

R17-25a

13506

1326.13

1327.00

0.87

0.01

0.01

0.10

0.07

R17-25a

13507

1327.00

1328.00

1.00

0.00

0.01

0.10

0.03

R17-25a

13508

1328.00

1329.00

1.00

0.00

0.01

0.20

0.05

R17-25a

13509

1329.00

1330.00

1.00

0.01

0.01

0.20

0.07

R17-25a

13511

1330.00

1331.00

1.00

0.00

0.01

0.10

0.03

R17-25a

13512

1331.00

1332.00

1.00

0.00

0.01

0.10

0.02

R17-25a

13513

1332.00

1333.00

1.00

0.00

0.01

0.10

0.04

R17-25a

13514

1333.00

1334.00

1.00

0.00

0.01

0.10

0.02

R17-25a

13515

1334.00

1335.00

1.00

0.00

0.01

0.20

0.04

R17-25a

13516

1335.00

1336.00

1.00

0.01

0.01

0.40

0.05

R17-25a

13517

1336.00

1336.85

0.85

0.04

0.04

0.20

0.04

R17-25a

13518

1336.85

1337.50

0.65

1.49

2.26

17.50

1.06

R17-25a

13555

1337.50

1338.00

0.50

2.13

1.54

18.10

1.59

R17-25a

13519

1338.00

1338.40

0.40

5.09

4.21

39.40

0.81

R17-25a

13521

1338.40

1339.40

1.00

8.59

8.04

53.60

1.55

R17-25a

13522

1339.40

1339.65

0.25

2.94

1.41

20.10

0.70

R17-25a

13523

1339.65

1340.66

1.01

0.05

0.07

0.20

0.04

R17-25a

13524

1340.66

1341.33

0.67

5.30

6.09

30.20

0.87

R17-25a

13525

1341.33

1341.90

0.57

0.64

0.49

2.90

0.12

R17-25a

13526

1341.90

1342.70

0.80

0.00

1.34

8.40

0.83

R17-25a

13527

1342.70

1342.88

0.18

0.59

0.78

4.20

0.29

R17-25a

13528

1342.88

1343.15

0.27

1.79

3.17

32.30

1.27

R17-25a

13529

1343.15

1344.00

0.85

0.17

0.58

9.90

0.92

R17-25a

13531

1344.00

1345.00

1.00

0.03

0.24

0.80

0.08

R17-25a

13532

1345.00

1346.00

1.00

0.10

0.62

1.90

0.03

R17-25a

13533

1346.00

1347.00

1.00

0.03

0.14

0.20

0.02

R17-25a

13534

1347.00

1348.00

1.00

0.02

0.08

0.30

0.05

R17-25a

13535

1348.00

1349.00

1.00

0.08

0.19

0.50

0.04

R17-25a

13536

1349.00

1350.00

1.00

0.02

0.10

0.10

0.02

R17-25a

13537

1350.00

1351.00

1.00

0.01

0.08

0.30

0.05

R17-25a

13538

1351.00

1352.00

1.00

0.03

0.09

0.30

0.07

R17-25a

13539

1352.00

1353.00

1.00

0.02

0.08

0.10

0.01

R17-25a

13541

1353.00

1354.00

1.00

0.01

0.05

0.40

0.01

R17-25a

13542

1354.00

1355.00

1.00

0.01

0.03

0.30

0.01

R17-25a

13543

1355.00

1355.80

0.80

0.01

0.04

0.10

0.02

R17-25a

13544

1355.80

1357.00

1.20

0.00

0.01

0.10

0.02

R17-25a

13545

1357.00

1358.00

1.00

0.01

0.01

0.10

0.04

R17-25a

13546

1358.00

1359.00

1.00

0.01

0.01

0.10

0.01

R17-25a

13547

1359.00

1360.00

1.00

0.00

0.01

0.10

0.01

R17-25a

13548

1360.00

1361.00

1.00

0.00

0.01

0.10

0.01

R17-25a

13549

1361.00

1362.00

1.00

0.00

0.01

0.10

0.01

R17-25a

13551

1362.00

1363.00

1.00

0.01

0.01

0.10

0.01

R17-25a

13552

1363.00

1364.00

1.00

0.01

0.01

0.10

0.01

R17-25a

13553

1364.00

1365.00

1.00

0.00

0.01

0.10

0.01

R17-25a

13554

1365.00

1366.00

1.00

0.00

0.01

0.10

0.01

R17-25a

13556

1366.00

1367.30

1.30

0.00

0.01

0.10

0.01

R17-25a

13557

1367.30

1368.03

0.73

0.03

0.02

0.10

0.02

R17-25a

13558

1368.03

1369.00

0.97

0.98

0.23

2.70

0.21

R17-25a

13559

1369.00

1370.00

1.00

0.60

0.16

1.40

0.05

R17-25a

13561

1370.00

1371.25

1.25

2.15

0.82

5.40

0.23

R17-25a

13562

1371.25

1371.73

0.48

0.01

0.01

0.10

0.02

R17-25a

13563

1372.45

1372.95

0.50

0.01

0.01

0.05

0.01

R17-25a

13564

1372.95

1374.00

1.05

0.15

0.12

0.20

0.00

R17-25a

13565

1374.00

1375.00

1.00

0.24

0.22

0.40

0.01

R17-25a

13566

1375.00

1375.60

0.60

0.59

0.32

0.90

0.01

R17-25a

13567

1375.60

1376.10

0.50

0.00

0.01

0.10

0.00

R17-25a

13568

1378.62

1379.12

0.50

0.00

0.01

0.10

0.00

R17-25a

13569

1379.12

1380.00

0.88

0.18

0.10

0.20

0.01

R17-25a

13571

1380.00

1381.00

1.00

0.11

0.09

0.10

0.01

R17-25a

13572

1381.00

1382.00

1.00

0.10

0.14

0.20

0.01

R17-25a

13573

1382.00

1383.00

1.00

0.09

0.11

0.10

0.00

R17-25a

13574

1383.00

1384.00

1.00

0.18

0.17

0.20

0.00

R17-25a

13575

1384.00

1385.00

1.00

0.07

0.09

0.10

0.00

R17-25a

13576

1385.00

1386.00

1.00

0.06

0.04

0.10

0.00

R17-25a

13577

1386.00

1386.77

0.77

0.04

0.04

0.10

0.00

R17-25a

13578

1386.77

1387.28

0.51

0.01

0.01

0.10

0.00

R17-25a

13579

1387.93

1388.43

0.50

0.00

0.01

0.10

0.00

R17-25a

13581

1388.43

1389.31

0.88

0.13

0.08

0.20

0.00

R17-25a

13582

1389.31

1391.00

1.69

0.43

0.10

0.80

0.02

R17-25a

13583

1391.00

1392.00

1.00

0.44

0.12

0.70

0.01

R17-25a

13584

1392.00

1392.66

0.66

0.49

0.13

0.90

0.01

R17-25a

13585

1392.66

1393.13

0.47

0.03

0.03

0.10

0.01

R17-25a

13586

1396.86

1397.35

0.49

0.01

0.01

0.20

0.01

R17-25a

13587

1397.35

1398.00

0.65

0.42

0.06

1.00

0.02

R17-25a

13588

1398.00

1399.00

1.00

0.35

0.04

0.40

0.04

R17-25a

13589

1399.00

1400.00

1.00

0.19

0.02

0.20

0.02

R17-25a

13591

1400.00

1401.00

1.00

0.75

0.06

0.80

0.07

R17-25a

13592

1401.00

1402.00

1.00

0.21

0.02

0.20

0.03

R17-25a

13593

1402.00

1403.60

1.60

0.50

0.11

1.00

0.07

R17-25a

13594

1403.60

1404.00

0.40

0.05

0.01

0.10

0.02

R17-25a

13595

1404.00

1404.55

0.55

0.75

0.06

0.80

0.02

R17-25a

13596

1407.62

1409.00

1.38

0.64

0.05

0.60

0.04

R17-25a

13597

1409.00

1410.00

1.00

0.50

0.09

1.50

0.12

R17-25a

13598

1410.00

1411.00

1.00

0.31

0.02

0.40

0.04

R17-25a

13599

1411.00

1412.00

1.00

0.09

0.02

0.20

0.01

R17-25a

13601

1412.00

1413.00

1.00

0.04

0.03

0.10

0.00

R17-25a

13602

1413.00

1414.00

1.00

0.17

0.05

0.10

0.00

R17-25a

13603

1414.00

1415.00

1.00

0.09

0.03

0.20

0.00

R17-25a

13604

1415.00

1416.00

1.00

0.08

0.10

0.10

0.00

R17-25a

13605

1416.00

1417.00

1.00

0.06

0.05

0.10

0.00

R17-25a

13606

1417.00

1418.00

1.00

0.51

0.08

0.40

0.02

R17-25a

13607

1418.00

1419.00

1.00

0.95

0.14

0.90

0.02

R17-25a

13608

1419.00

1420.00

1.00

0.04

0.04

0.10

0.01

R17-25a

13609

1420.00

1421.00

1.00

0.03

0.05

0.10

0.01

R17-25a

13611

1421.00

1422.00

1.00

0.04

0.02

0.30

0.00

R17-25a

13612

1422.00

1423.00

1.00

0.57

0.13

0.50

0.01

R17-25a

13613

1423.00

1424.00

1.00

0.14

0.07

0.20

0.01

R17-25a

13614

1424.00

1425.00

1.00

0.18

0.08

0.10

0.01

R17-25a

13615

1425.00

1426.00

1.00

0.05

0.02

0.10

0.01

R17-25a

13616

1426.00

1427.00

1.00

0.15

0.07

0.20

0.01

R17-25a

13617

1427.00

1428.00

1.00

0.54

0.05

0.40

0.01

R17-25a

13618

1428.00

1429.00

1.00

1.37

0.10

1.10

0.01

R17-25a

13619

1429.00

1430.00

1.00

0.32

0.02

0.20

0.00

R17-25a

13621

1430.00

1431.00

1.00

1.26

0.06

1.20

0.01

R17-25a

13622

1431.00

1432.00

1.00

3.27

0.12

2.80

0.02

R17-25a

13623

1432.00

1433.23

1.23

1.71

0.12

1.40

0.01

R17-25a

13624

1433.23

1433.72

0.49

0.05

0.01

0.30

0.00

R17-25a

13625

1449.00

1449.48

0.48

0.04

0.01

0.30

0.01

R17-25a

13626

1449.48

1450.00

0.52

1.09

0.08

1.00

0.01

R17-25a

13627

1450.00

1451.00

1.00

1.82

0.10

1.60

0.01

R17-25a

13628

1451.00

1452.00

1.00

0.95

0.07

0.80

0.01

R17-25a

13629

1452.00

1453.00

1.00

2.01

0.26

1.70

0.01

R17-25a

13631

1453.00

1454.00

1.00

0.48

0.02

0.40

0.01

R17-25a

13632

1454.00

1455.00

1.00

3.48

0.14

3.40

0.01

R17-25a

13633

1455.00

1456.00

1.00

2.71

0.14

2.10

0.01

R17-25a

13634

1456.00

1457.00

1.00

0.73

0.05

0.80

0.01

R17-25a

13635

1457.00

1458.00

1.00

1.98

0.12

1.80

0.01

R17-25a

13636

1458.00

1459.00

1.00

1.80

0.09

1.70

0.02

R17-25a

13637

1459.00

1460.00

1.00

4.39

0.11

3.30

0.04

R17-25a

13638

1460.00

1463.00

3.00

0.49

0.06

0.40

0.01

R17-25a

13639

1463.00

1464.00

1.00

0.66

0.04

0.70

0.01

R17-25a

13641

1464.00

1465.00

1.00

0.66

0.03

0.50

0.01

R17-25a

13642

1465.00

1466.00

1.00

0.86

0.06

0.90

0.01

R17-25a

13643

1466.00

1467.00

1.00

1.13

0.06

1.00

0.01

R17-25a

13644

1467.00

1468.00

1.00

0.18

0.02

0.30

0.01

R17-25a

13645

1468.00

1469.00

1.00

0.75

0.02

0.70

0.01

R17-25a

13646

1469.00

1470.00

1.00

0.39

0.06

0.50

0.01

R17-25a

13647

1470.00

1471.00

1.00

0.68

0.03

2.60

0.01

R17-25a

13648

1471.00

1472.00

1.00

1.69

0.09

1.10

0.01

R17-25a

13649

1472.00

1473.00

1.00

0.76

0.04

0.70

0.01

R17-25a

13651

1473.00

1474.00

1.00

1.30

0.04

1.10

0.01

R17-25a

13652

1474.00

1475.00

1.00

1.68

0.07

1.40

0.01

R17-25a

13653

1475.00

1476.00

1.00

2.71

0.08

2.30

0.01

R17-25a

13654

1476.00

1477.00

1.00

2.30

0.04

1.90

0.01

R17-25a

13655

1477.00

1477.47

0.47

3.11

0.10

2.30

0.01

R17-25a

13656

1477.47

1478.03

0.56

0.01

0.01

0.10

0.00

R17-25a

13657

1480.93

1481.43

0.50

0.13

0.01

0.10

0.01

R17-25a

13658

1481.43

1482.00

0.57

7.63

0.13

0.00

0.02

R17-25a

13659

1482.00

1483.00

1.00

3.76

0.22

3.30

0.01

R17-25a

13661

1483.00

1484.00

1.00

2.56

0.05

2.00

0.01

R17-25a

13662

1484.00

1485.00

1.00

1.24

0.02

1.00

0.01

R17-25a

13663

1485.00

1485.75

0.75

1.84

0.04

1.60

0.01

R17-25a

13664

1485.75

1486.84

1.09

0.02

0.01

0.10

0.01

R17-25a

13665

1486.84

1488.00

1.16

2.28

0.07

1.70

0.02

R17-25a

13666

1488.00

1489.00

1.00

1.23

0.02

1.20

0.01

R17-25a

13667

1489.00

1489.90

0.90

0.63

0.02

0.60

0.01

R17-25a

13668

1489.90

1490.95

1.05

0.02

0.01

0.10

0.00

R17-25a

13669

1490.95

1492.00

1.05

0.09

0.01

0.20

0.01

R17-25a

13671

1492.00

1493.00

1.00

0.03

0.01

0.20

0.01

R17-25a

13672

1493.00

1494.00

1.00

0.06

0.02

0.10

0.01

R17-25a

13673

1494.00

1495.00

1.00

0.03

0.01

0.10

0.01

R17-25a

13674

1495.00

1496.00

1.00

0.07

0.01

0.20

0.01

R17-25a

13675

1496.00

1497.00

1.00

0.08

0.01

0.10

0.01

R17-25a

13676

1497.00

1498.25

1.25

0.11

0.02

0.30

0.01

R17-25a

13677

1498.25

1498.75

0.50

0.01

0.01

0.10

0.01

R17-25a

13679

1545.68

1547.00

1.32

1.38

0.11

1.70

0.01

R17-25a

13681

1547.00

1548.00

1.00

0.39

0.03

0.50

0.01

R17-25a

13682

1548.00

1548.66

0.66

0.24

0.03

0.50

0.01

R17-25a

13683

1548.66

1549.15

0.49

0.01

0.01

0.10

0.01

R17-25a

13684

1549.15

1549.92

0.77

0.20

0.01

0.20

0.01

R17-25a

13685

1549.92

1550.89

0.97

0.32

0.03

1.80

0.01

R17-25a

13686

1550.89

1552.00

1.11

0.31

0.05

1.10

0.01

R17-25a

13687

1552.00

1553.00

1.00

0.07

0.02

0.10

0.01

R17-25a

13688

1553.00

1554.00

1.00

0.11

0.02

0.20

0.01

R17-25a

13689

1554.00

1555.00

1.00

0.13

0.03

0.40

0.01

R17-25a

13691

1555.00

1556.00

1.00

0.18

0.03

0.40

0.01

R17-25a

13692

1556.00

1557.00

1.00

0.12

0.05

0.30

0.01

R17-25a

13693

1557.00

1558.00

1.00

0.16

0.02

0.20

0.01

R17-25a

13694

1558.00

1558.73

0.73

0.06

0.01

0.20

0.01

R17-25a

13695

1558.73

1559.23

0.50

0.15

0.05

0.40

0.01

R17-25a

13696

1562.30

1562.80

0.50

0.07

0.01

0.10

0.01

R17-25a

13697

1562.80

1564.00

1.20

2.09

0.13

4.60

0.02

R17-25a

13698

1564.00

1565.00

1.00

1.64

0.14

3.10

0.01

R17-25a

13699

1565.00

1566.00

1.00

1.87

0.10

3.60

0.01

R17-25a

13701

1566.00

1566.54

0.54

1.81

0.19

3.50

0.01

R17-25a

13702

1566.54

1567.04

0.50

0.02

0.01

0.10

0.01

R17-25a

13703

1570.00

1570.50

0.50

0.01

0.01

0.10

0.01

R17-25a

13704

1570.50

1571.00

0.50

1.28

0.09

1.90

0.02

R17-25a

13705

1571.00

1572.00

1.00

0.65

0.02

0.90

0.01

R17-25a

13706

1572.00

1573.00

1.00

0.90

0.04

1.40

0.01

R17-25a

13707

1573.00

1573.83

0.83

0.12

0.01

0.20

0.01

R17-25a

13708

1573.83

1574.32

0.49

0.02

0.01

0.10

0.01

R17-25a

13709

1579.55

1580.05

0.50

0.06

0.01

0.20

0.01

R17-25a

13711

1580.05

1581.00

0.95

0.80

0.03

1.30

0.01

R17-25a

13712

1581.00

1582.00

1.00

1.98

0.09

3.00

0.02

R17-25a

13713

1582.00

1583.20

1.20

1.89

0.09

2.80

0.02

R17-25a

13714

1583.20

1583.70

0.50

0.09

0.01

0.20

0.01

R17-25a

13715

1584.13

1584.63

0.50

0.11

0.01

0.10

0.01

R17-25a

13716

1584.63

1586.00

1.37

0.66

0.01

0.70

0.01

R17-25a

13717

1586.00

1587.00

1.00

1.68

0.07

2.20

0.01

R17-25a

13718

1587.00

1588.00

1.00

1.28

0.02

1.70

0.01

R17-25a

13719

1588.00

1589.00

1.00

1.47

0.06

1.90

0.01

R17-25a

13721

1589.00

1590.00

1.00

1.96

0.07

2.60

0.01

R17-25a

13722

1590.00

1591.00

1.00

1.88

0.06

2.50

0.02

R17-25a

13723

1591.00

1592.00

1.00

0.09

0.01

0.20

0.01

R17-25a

13724

1592.00

1593.00

1.00

0.59

0.02

0.60

0.02

R17-25a

13725

1593.00

1594.00

1.00

0.41

0.01

0.20

0.01

R17-25a

13726

1594.00

1595.00

1.00

0.90

0.04

1.20

0.02

R17-25a

13727

1595.00

1596.00

1.00

0.57

0.04

0.70

0.02

R17-25a

13728

1596.00

1597.00

1.00

1.99

0.24

2.70

0.02

R17-25a

13729

1597.00

1597.87

0.87

0.63

0.06

0.70

0.01

R17-25a

13731

1597.87

1598.50

0.63

0.03

0.01

0.10

0.01

R17-25a

13732

1599.90

1600.35

0.45

0.09

0.02

0.20

0.01

R17-25a

13733

1600.35

1601.00

0.65

1.04

0.14

1.90

0.01

R17-25a

13734

1601.00

1602.00

1.00

0.67

0.09

0.90

0.01

R17-25a

13735

1602.00

1603.00

1.00

0.50

0.08

0.90

0.01

R17-25a

13736

1603.00

1603.80

0.80

1.59

0.20

2.80

0.01

R17-25a

13737

1603.80

1604.30

0.50

0.03

0.01

0.10

0.01

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBCGDCDUBBGRX
Date   Source Headline
7th Jan 20197:00 amRNSVoluntarily Delisting from TSX Venture Exchange
7th Dec 20188:37 amRNSConvertible Loan Note Financing Close
26th Nov 20187:00 amRNSConvertible Loan Note Financing
21st Nov 20187:00 amRNSQ3 2018 Financial Results
24th Oct 20187:00 amRNSQ3 Production Results
1st Oct 20187:00 amRNSDiamond Drill Update
29th Aug 20187:00 amRNSInterim results
31st Jul 20187:00 amRNSHalf Year Production Results
3rd Jul 20187:30 amRNSGrant of Options / PDMR Holding
20th Jun 201812:32 pmRNSResults of General Meeting
13th Jun 20183:48 pmRNSTR-1 - Notification of Major Holdings
13th Jun 20183:16 pmRNSClosing of Final Tranche of Private Placement
5th Jun 20187:00 amRNSTR1 - Aether
5th Jun 20187:00 amRNSTR1 - CEII
5th Jun 20187:00 amRNSFiling of Meeting Materials
1st Jun 20187:00 amRNSExercise of Warrants and Issue of Equity
30th May 20182:28 pmRNSFinancial Results Quarter Ended March 31, 2018
25th May 20184:29 pmRNSNews Release for Tranche 1
22nd May 20187:00 amRNSIssue of Equity
10th May 20187:00 amRNSSafety Award
30th Apr 20184:09 pmRNSYear End Financial Results
25th Apr 20187:00 amRNSNI43-101 Technical Report
5th Mar 20187:00 amRNSReserves Update
26th Feb 20187:00 amRNSRambler to attend Investor Conferences
12th Feb 20187:00 amRNSRecord Throughput for 2017
29th Dec 20177:34 amRNSPurchase Agreement with Off-take Ptnr Transamine
19th Dec 20177:00 amRNSRecord Throughput as it Transitions to 1,250 mtpd
27th Nov 20177:00 amRNSSurface Exploration Update
22nd Nov 20177:00 amRNSRambler appoints a new General Manager
20th Nov 20177:00 amRNSFinancial Results Quarter Ended September 30, 2017
9th Nov 20177:00 amRNSExercise of Options, Issue of Equity & TVR
2nd Nov 20177:00 amRNS3rd Qtr Production Results & Exploration Update
19th Oct 20177:00 amRNSLoan Transaction with CE Mining II Rambler Limited
14th Sep 20177:00 amRNSSurface Exploration Update
13th Sep 20177:00 amRNS7th Annual Precious Metals Summit in Colorado
21st Aug 20177:04 amRNSInterim Results
27th Jul 201711:55 amRNSHolding(s) in Company
27th Jul 20178:39 amRNS2nd Quarter Production Results & Updated Guidance
29th Jun 201712:14 pmRNSResults of Annual General and Special Meeting
27th Jun 20177:00 amRNSExploration Update
2nd Jun 20178:00 amRNSFiling of Meeting Materials
25th May 20177:04 amRNSFinancial Results Period Ended March 31, 2017
17th May 20178:00 amRNSNotification of Change of Auditor
9th May 20177:00 amRNSQ1 2017 Production Results & Development Update
4th Apr 20171:03 pmRNSHolding(s) in Company
4th Apr 20178:27 amRNSHolding(s) in Company
29th Mar 20178:23 amRNSTransition Year - Annual Financial Statements
2nd Mar 20172:00 pmRNSHammerdown PFS
23rd Feb 201711:06 amRNSUpcoming Conferences
6th Feb 20175:46 pmRNSExercise of Warrants and Issue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.