3rd Qtr Production Results & Exploration Update

2 Nov 2017 07:00

RNS Number : 3623V
Rambler Metals & Mining PLC
02 November 2017
 

2 November 2017

Rambler Releases Third Quarter Production Results & Exploration Update

Mill Currently Averaging 1,150 mtpd; Targeting 1,250 mtpd in November 2017

 

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer today provides production results for the third quarter ended 30 September 2017 ('Q3/17').

Q3/17 Production Summary

· Copper feed grade for the quarter was 1.38% with a gold grade of 0.66 g/t. Total mill throughput for the period ending 30 September 2017 was 79,300 dry metric tonnes ('dmt'), a 9% decrease over the previous quarter; 14% increase over the same quarter F2016.

· During the period the copper milling facility averaged 920 metric tonnes per day ('mtpd') during operational hours. This is a decrease over the previous quarter as a result of a secondary crusher issue early in July. Primary crushing was available at a reduced rate during repairs however the monthly average was only 814 mtpd. The mill is currently averaging approximately 1,150 mtpd.

· Underground development into the Lower Footwall Zone continued at pace during the quarter and the Company is targeting production at 1,250 mtpd in November 2017. The mill itself has completed all known bottleneck modifications and now awaits a steady 1,250 mtpd ore feed from the mine to confirm that the modifications were successful. The Company has revised its annual production guidance to account for the delay in underground development.

· Average recoveries to concentrate for the quarter were: copper 95.38% and gold 61.68% with a concentrate grade of 28.9% and 9.0 g/t for copper and gold respectively.

o The mill produced 3,614 dmt of concentrate, a 17% decrease over Q2/17, containing saleable metal of 1,004 tonnes of copper and 930 ounces of gold. This represents a 10% and 1% decrease respectively over the previous quarter.

EXPLORATIoN UPDATE

· The second exploration surface hole, RM17-25b, has now been completed to a depth of 1,685 meters.

· RM17-25b has extended the LFZ zone an additional 200 meters with a third hole in progress aiming to add another 300 meters of plunge length.

· The goal of the surface exploration program is to add approximately 1 kilometer to the mineralized plunge length of the LFZ and MMS presently being mined up dip.

· Assays for the new hole are pending and will be released over the coming weeks.

 

Norman Williams, President and CEO, commented:

"While the quarter started off with unplanned secondary crusher repairs, by quarter end the operation was pushing over 1,100 mtpd. Our maximum throughput year to date has been 1,230 mtpd with more tonnes now being delivered to surface from additional Lower Footwall Zone headings. The operation is working towards maintaining 1,250 mtpd throughout November then a temporary step back to 1,150 mtpd to allow for commissioning of the new ventilation system for the mine.

"The mineralized intersections reported from the first exploration surface drill hole were encouraging and stepped out nearly 300 meters from the closest drill hole. We have now completed a second hole and have extended the LFZ an additional 200 meters with a third hole underway targeting another ~300 meters of plunge length. Continued drilling is proving to be successful in expanding the LFZ mineralization as we work towards our Phase III engineering studies."

 

Q3 2017 Production Summary

 

The table below summarizes the production results for second quarter ending 30 September 2017.

 

Table 1 - Quarter over Quarter Results Comparison 

(see Note 1 below)

PRODUCTION

Q2/17

Q3/17

Q3/16

Q3/17

Dry Tonnes Milled

86,895

79,300

-9%

69,426

79,300

14%

Copper Recovery

94.2

95.4

1%

96.0

95.4

-1%

Gold Recovery

56.5

61.7

9%

63.4

61.7

-3%

Copper Head Grade (%)

1.41

1.38

-2%

1.84

1.38

-25%

Gold Head Grade (g/t)

0.67

0.66

-1%

1.24

0.66

-46%

 

CONCENTRATE

 

Copper (%)

26.6

28.9

9%

27.2

28.9

6%

Gold (g/t)

7.7

9.0

17%

13.4

9.0

-33%

Dry Tonnes Produced

4,359

3,614

-17%

4,215

3,614

-14%

 

SALEABLE METAL

 

Copper Metal (tonnes)

1,112

1,004

-10%

1,101

1,004

-9%

Gold (ounces)

939

930

-1%

1,681

930

-45%

 

During the period the copper milling facility processed 79,300 mtpd of ore at an average of 930 metric tonnes per day ('mtpd'), during operational hours. All known bottleneck modifications have been made to the mill and it awaits sustained ore feed of 1,250 mtpd from the mine. Copper feed grade for the quarter was 1.38% with a gold grade of 0.66 g/t, both in line with guidance.

Recovery to concentrate for copper was 95.4% and gold 61.7% with a concentrate grade of 28.9% and 9.0 g/t for copper and gold respectively. The mill produced 3,614 dmt of copper concentrate with saleable metal of 1,004 tonnes of copper and 930 ounces of gold. The mill produced at a reduced rated for a portion of July due to secondary crusher repairs however is currently averaging 1,150 mtpd and has run at consecutive days above 1,200 mtpd.

With more LFZ stopes now in production ore being delivered from the mine is nearing its 1,250 mtpd target. The ventilation improvements at the mine will allow for faster cycling in the post pillar cut and fill areas and allow sustained 1,250 mtpd production from the mine.

The Company has revised its guidance forecast for the remainder of the fiscal year to better reflect the slippage in underground development.

 

Table 2 - Q3/17 and YTD Production Results with 2017 Revised Guidance

(See Note 1 below)

 

PRODUCTION

Q1

2017

Q2

2017

Q3

2017

YTD

2017

Revised

F2017 Guidance

Previous

F2017 Guidance

Dry Tonnes Milled

75,438

86,895

79,300

241,634

330,000 - 360,000

350,000 - 400,000

Copper Recovery (%)

96.6

94.2

95.4

95.3

94 - 96

94 - 96

Gold Recovery (%)

64.0

56.5

61.7

60.6

60 - 65

60 - 65

Copper Head Grade (%)

1.13

1.41

1.38

1.32

1.3 - 1.6

1.3 - 1.6

Gold Head Grade (g/t)

0.3

0.67

0.66

0.55

0.5 - 1.0

0.5 - 1.0

 

CONCENTRATE

 

Copper grade (%)

28.2

26.6

28.9

27.9

26 - 28

26 - 28

Gold grade (g/t)

5.2

7.7

9.0

7.3

4.0 - 8.0

4.0 - 8.0

Dry Tonnes Produced

2,930

4,359

3,614

10,903

14,000 - 16,000

16,000 - 18,000

 

SALEABLE METAL

 

Copper (tonnes)

794

1,112

1,004

2,910

3,800 - 4,200

4,200 - 4,900

Gold (ounces)

391

939

930

2,260

3,400 - 3,900

3,900 - 4,700

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its mining and milling processes as well as stockpile inventories, following which past results may be adjusted to reflect any changes.

 

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's ongoing Phase II plans are to increase mine and mill production to 1,250 mtpd by the fall 2017. This initial expansion has been fully funded through CEII's investment. Rambler will also continue advancing Phase III engineering studies with a view to further increase production to 2,000 mtpd at the Ming Mine.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

 

Norman Williams, CPA,CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

 

Nominated Advisor (NOMAD)

 

Investor Relations

David Porter

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Nicole Marchand Investor Relations

Tel No: 416- 428-3533

Nicole@nm-ir.com

 

 

Website: www.ramblermines.com 

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDMMMGMVZRGNZG
Date   Source Headline
27th Apr 20237:00 amRNSBlock Listing Six Monthly Return
21st Apr 20237:00 amRNSUpdate – Creditors Voluntary Liquidation
17th Apr 20237:00 amRNSSale and Investment Solicitation Process
12th Apr 20231:53 pmRNSCompany Website Update
11th Apr 20235:45 pmRNSRambler Metals & Mining
11th Apr 20237:00 amRNSCreditors Voluntary Arrangement and Cancellation
6th Apr 20234:27 pmRNSMaterials publicly filed in the CCAA Proceedings
4th Apr 20232:42 pmRNSCompany Website
30th Mar 20238:33 amRNSOperational Update
24th Mar 20232:33 pmRNSGrant and Vesting of Restricted Share Units
17th Mar 20231:54 pmRNSMaterials publicly filed in the CCAA Proceedings
16th Mar 20233:58 pmRNSCCAA Proceedings
14th Mar 20239:12 amRNSMaterials publicly filed in the CCAA Proceedings
8th Mar 20237:00 amRNSMaterials publicly filed in the CCAA Proceedings
7th Mar 20237:00 amRNSCorrection: Materials publicly filed
6th Mar 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20237:00 amRNSRambler Announces Strategic Process
27th Feb 20237:00 amRNSApplication for Initial Order for CCAA Protection
20th Feb 20237:00 amRNSUpdate on Gold Stream Repurchase Agreement
17th Feb 20237:00 amRNSUpdate on Financing and Operations
10th Feb 20237:00 amRNSUpdate on Gold Streaming Agreement
18th Jan 20237:00 amRNSQ4 2022 Operational Results
5th Dec 20223:49 pmRNSForward Sale on Copper Production
15th Nov 20227:00 amRNSForward Sale on Copper Production
10th Nov 20229:28 amRNSRambler Provides an Operational Update
1st Nov 20227:00 amRNSRambler Provides an Update on Financial Position
27th Oct 20227:30 amRNSSuspension - Rambler Metals & Mining PLC
27th Oct 20227:01 amRNSBlock Listing Six Monthly Return
27th Oct 20227:00 amRNSRambler Provides an Update on Financial Position
21st Oct 20227:00 amRNSQ3 2022 Operational Results
3rd Oct 20229:05 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
30th Sep 20222:06 pmRNSSecond Price Monitoring Extn
30th Sep 20222:00 pmRNSPrice Monitoring Extension
28th Sep 20224:41 pmRNSSecond Price Monitoring Extn
28th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20224:40 pmRNSSecond Price Monitoring Extn
27th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20222:00 pmRNSPrice Monitoring Extension
26th Sep 20224:32 pmRNSFinancial Results Half Year Ended 30 June 2022
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20224:41 pmRNSSecond Price Monitoring Extn
13th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 20224:40 pmRNSSecond Price Monitoring Extn
9th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 202212:19 pmRNSRambler Provides a Corporate Update
1st Sep 20227:00 amRNSSignificance of Stope In-fill Drilling Program
23rd Aug 20227:00 amRNSRambler Updates 2022 Diamond Drilling Program

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.