The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRGM.L Regulatory News (RGM)

  • There is currently no data for RGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

8 Sep 2009 07:00

RNS Number : 6671Y
Regency Mines PLC
08 September 2009
 



REGENCY MINES PLC

Botue-Mambare Nickel Exploration Project: Drilling Report

Dated: 8 September 2009

Further to the announcement made on 10 August 2009, Regency Mines plc ("the Company") the mining exploration and mineral investment company with interests in copper and nickel in Papua New Guinea ("PNG"), Western Australia, and Queensland, presents further results from its drill programme at the Botue-Mambare Nickel Laterite Project, Papua New Guinea.

All of the sample results from the drilled cores over the Mambare Plateau have now been received. Figure 1 shows the location of all 331 holes and the distribution of these holes over the 15 lines (9021600N to 9026000N). The holes labeled with an ID number are holes from which average Ni grades of greater than 0.90% have been recovered, in either the limonite or saprolite (or both) layers, and the remaining, unlabelled holes have average Ni grades of relative locations of drilled holes for high grade Limonite and Saprolite respectively with average Ni and Co (Cobalt) grades for each of the high grade holes, as well as the thickness. 

Referring to figures 2 and 3, the limonite zone southeast of the Arumu River (which flows SW, parallel to the walking track between the 2 camps) averages at 1.08% Ni and 0.11% Co over an average thickness of 8.10m. The saprolite body averages at 1.36% Ni and 0.04% Co over 5.25m. The area to the northwest of the Arumu River shows average limonite grades of 1.05% Ni and 0.11% Co over 8.07m thickness and the underlying saprolite averages at 1.25% Ni and 0.04% Co over an average of 2.60m. These results suggest that there are 2 ore bodies (one on each side of the river); however detailed resource modeling and 3D imaging is required in order to determine the dimensions of the ore bodies and is currently underway. 

The development of high grade limonite and saprolite profiles tend to occur across areas of shallow gradient over ridge tops, and along the base of ridges and valley floors. Bedrock type is an additional control on the laterite formation. Generation of a resource model has commenced which should further test the relationship between topography, bedrock and laterite development. 

The first phase of exploration at Mambare, consisting of testing the more accessible incised slopes on the south west edge of the plateau, is now complete. This drilling programme, completed at the end of last year, produced 4000m of drilled core. More drilling is anticipated over the wider area of the main plateau (targeting the shallower gradients), as well as infill drilling (between the completed lines), which will allow the extent of the high grade zones to be further constrained. There is potential to increase the thickness of the saprolite zones, as some holes in the recently completed programme may not have tested the full saprolite profile due to drill penetration issues. Future drilling activities will need to persist to greater average depth than encountered during this drill programme.

These results are regarded as highly encouraging, and as justifying an acceleration in the pace of exploration of the property. Further announcements will be made as information becomes available.

Click on, or paste the following link into your web browser, to view the associated PDF document:

Figure 1: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_-2009-9-7.pdf

Figure 2: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_1-2009-9-7.pdf

Figure 3: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_2-2009-9-7.pdf

The technical information in this announcement has been prepared by Kamini Manick, MEarthSci, and reviewed and approved by Helen Salmon, BSc(Hons), both geologists working for the Company. Helen Salmon is a Fellow of the Geological Society and a Member of the Mineralogical Society, and a qualified person as defined in the Note for Mining and Oil & Gas Companies, June 2009, of the London Stock Exchange..

Enquiries:

Andrew Bell

0207 402 4580

or

07766 474849

Regency Mines plc

Chairman

Peter Trevelyan-Clark/

Ben Jeynes

020 7489 4500

Blomfield Corporate Finance Ltd

Nominated Adviser

Nick Emerson

01483 413500

Simple Investments Ltd

Broker

Ron Marshman/

John Greenhalgh

020 7011 9411

Lothbury Financial Limited

Public Relations

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLCKOKNFBKDQCK
Date   Source Headline
1st Sep 201512:54 pmRNSHolding(s) in Company
20th Aug 20154:49 pmRNSPlacing and Total Voting Rights
27th Jul 20157:00 amRNSPotential Investment and Update
2nd Jul 20155:42 pmRNSHolding(s) in Company
2nd Jul 20157:00 amRNSIssue of Equity and TVR
17th Jun 20157:00 amRNSSudan Operational Update
15th Jun 20154:15 pmRNSHolding(s) in Company
9th Jun 20151:22 pmRNSHolding(s) in Company
3rd Jun 20157:00 amRNSUpdate on Investment
20th May 20157:00 amRNSMunglinup Graphite - Update
13th May 20155:33 pmRNSSudan Update
6th May 20154:40 pmRNSSecond Price Monitoring Extn
6th May 20154:35 pmRNSPrice Monitoring Extension
5th May 20154:40 pmRNSSecond Price Monitoring Extn
5th May 20154:35 pmRNSPrice Monitoring Extension
15th Apr 20154:26 pmRNSHolding(s) in Company
14th Apr 20154:13 pmRNSShare Incentive Plan and Directors' Dealings
14th Apr 20153:22 pmRNSAttendance at UK Investor Show
8th Apr 20152:30 pmRNSSale of Horse Hill Oil Interest
30th Mar 201510:34 amRNSHolding(s) in Company
27th Mar 201511:42 amRNSInterim Results
19th Mar 201510:19 amRNSHolding(s) in Company
18th Mar 20157:00 amRNSUpdate on Horse Hill Discovery
12th Mar 201512:30 pmRNSAgreement for Sale of Horse Hill Interest
4th Mar 20154:43 pmRNSHolding(s) in Company
2nd Mar 201512:27 pmRNSTotal Voting Rights
23rd Feb 20154:22 pmRNSHolding(s) in Company
23rd Feb 20157:00 amRNSIssuance of RAM Resource Shares
20th Feb 20156:22 pmRNSHolding(s) in Company
20th Feb 20151:46 pmRNSResult of General Meeting, Capital Reorganisation
10th Feb 20154:40 pmRNSSecond Price Monitoring Extn
10th Feb 20154:35 pmRNSPrice Monitoring Extension
3rd Feb 20156:31 pmRNSRe-organisation of share capital, General Meeting
31st Dec 201412:09 pmRNSTotal Voting Rights
23rd Dec 20144:14 pmRNSAGM Statement
17th Dec 20141:38 pmRNSHorse Hill-1 Oil Discovery Update
27th Nov 20145:32 pmRNSIssue of Equity and TVR
21st Nov 20142:44 pmRNSFinal Results
17th Nov 20141:30 pmRNSUpdate on Greenland and Sudan
5th Nov 20148:00 amRNSHorse Hill-1 Provisional Results at TD
24th Oct 20147:00 amRNSPortland Oil Discovery, Horse Hill-1
16th Oct 201411:30 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
15th Oct 20147:00 amRNSSudan Update - Mobilisation to Red Sea Block
6th Oct 20147:00 amRNSDrilling Report
3rd Oct 20148:06 amRNSTotal Voting Rights
29th Sep 201411:00 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
29th Sep 20147:00 amRNSIssue of Equity
24th Sep 20141:00 pmRNSDrilling Update, Horse Hill-1, Weald Basin UK
24th Sep 20149:40 amRNSWest Virginia Shallow-Oil Project
18th Sep 20142:00 pmRNSUpdate, Horse Hill-1, Weald Basin UK

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.