The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRGM.L Regulatory News (RGM)

  • There is currently no data for RGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

8 Sep 2009 07:00

RNS Number : 6671Y
Regency Mines PLC
08 September 2009
 



REGENCY MINES PLC

Botue-Mambare Nickel Exploration Project: Drilling Report

Dated: 8 September 2009

Further to the announcement made on 10 August 2009, Regency Mines plc ("the Company") the mining exploration and mineral investment company with interests in copper and nickel in Papua New Guinea ("PNG"), Western Australia, and Queensland, presents further results from its drill programme at the Botue-Mambare Nickel Laterite Project, Papua New Guinea.

All of the sample results from the drilled cores over the Mambare Plateau have now been received. Figure 1 shows the location of all 331 holes and the distribution of these holes over the 15 lines (9021600N to 9026000N). The holes labeled with an ID number are holes from which average Ni grades of greater than 0.90% have been recovered, in either the limonite or saprolite (or both) layers, and the remaining, unlabelled holes have average Ni grades of relative locations of drilled holes for high grade Limonite and Saprolite respectively with average Ni and Co (Cobalt) grades for each of the high grade holes, as well as the thickness. 

Referring to figures 2 and 3, the limonite zone southeast of the Arumu River (which flows SW, parallel to the walking track between the 2 camps) averages at 1.08% Ni and 0.11% Co over an average thickness of 8.10m. The saprolite body averages at 1.36% Ni and 0.04% Co over 5.25m. The area to the northwest of the Arumu River shows average limonite grades of 1.05% Ni and 0.11% Co over 8.07m thickness and the underlying saprolite averages at 1.25% Ni and 0.04% Co over an average of 2.60m. These results suggest that there are 2 ore bodies (one on each side of the river); however detailed resource modeling and 3D imaging is required in order to determine the dimensions of the ore bodies and is currently underway. 

The development of high grade limonite and saprolite profiles tend to occur across areas of shallow gradient over ridge tops, and along the base of ridges and valley floors. Bedrock type is an additional control on the laterite formation. Generation of a resource model has commenced which should further test the relationship between topography, bedrock and laterite development. 

The first phase of exploration at Mambare, consisting of testing the more accessible incised slopes on the south west edge of the plateau, is now complete. This drilling programme, completed at the end of last year, produced 4000m of drilled core. More drilling is anticipated over the wider area of the main plateau (targeting the shallower gradients), as well as infill drilling (between the completed lines), which will allow the extent of the high grade zones to be further constrained. There is potential to increase the thickness of the saprolite zones, as some holes in the recently completed programme may not have tested the full saprolite profile due to drill penetration issues. Future drilling activities will need to persist to greater average depth than encountered during this drill programme.

These results are regarded as highly encouraging, and as justifying an acceleration in the pace of exploration of the property. Further announcements will be made as information becomes available.

Click on, or paste the following link into your web browser, to view the associated PDF document:

Figure 1: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_-2009-9-7.pdf

Figure 2: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_1-2009-9-7.pdf

Figure 3: http://www.rns-pdf.londonstockexchange.com/rns/6671Y_2-2009-9-7.pdf

The technical information in this announcement has been prepared by Kamini Manick, MEarthSci, and reviewed and approved by Helen Salmon, BSc(Hons), both geologists working for the Company. Helen Salmon is a Fellow of the Geological Society and a Member of the Mineralogical Society, and a qualified person as defined in the Note for Mining and Oil & Gas Companies, June 2009, of the London Stock Exchange..

Enquiries:

Andrew Bell

0207 402 4580

or

07766 474849

Regency Mines plc

Chairman

Peter Trevelyan-Clark/

Ben Jeynes

020 7489 4500

Blomfield Corporate Finance Ltd

Nominated Adviser

Nick Emerson

01483 413500

Simple Investments Ltd

Broker

Ron Marshman/

John Greenhalgh

020 7011 9411

Lothbury Financial Limited

Public Relations

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLCKOKNFBKDQCK
Date   Source Headline
16th Sep 20169:28 amRNSReview of remuneration structure, issue of options
7th Sep 20167:00 amRNSReview of Motzfeldt Centre Project, Greenland
1st Sep 201611:41 amRNSHolding(s) in Company
30th Aug 201612:16 pmRNSIssue of Equity and TVR
19th Jul 20167:00 amRNSHorse Hill Update - Upgrade to Portland OIP
15th Jul 20167:00 amRNSUpdate on Mambare Nickel Project
5th Jul 20167:00 amRNSHorse Hill Licenses Update
28th Jun 20167:00 amRNSOperations and Investment Update
14th Jun 201612:59 pmRNSCancellation and re-issue of options
14th Jun 20167:00 amRNSUpdate
7th Jun 20165:38 pmRNSDirector/PDMR Shareholding
26th May 20167:00 amRNSInvestment
9th May 20167:00 amRNSParticipation in auction to acquire oil assets
4th May 201612:41 pmRNSTotal Voting Rights
3rd May 20164:40 pmRNSSecond Price Monitoring Extn
3rd May 20164:35 pmRNSPrice Monitoring Extension
7th Apr 20167:00 amRNSIssue of Shares and Directors' Dealings
31st Mar 20167:00 amRNSUnaudited half-yearly results period ended 31 Dec
23rd Mar 20164:40 pmRNSSecond Price Monitoring Extn
23rd Mar 20164:35 pmRNSPrice Monitoring Extension
21st Mar 20164:40 pmRNSSecond Price Monitoring Extn
21st Mar 20164:35 pmRNSPrice Monitoring Extension
21st Mar 20168:00 amRNSHorse Hill-1 Aggregate Flow Rate
10th Mar 20161:32 pmRNSPlacement of Shares and TVR
9th Mar 20167:00 amRNSHorse Hill-1 Flow Test Portland Zone
2nd Mar 20167:00 amRNSFurther update on Horse Hill-1 Flow Test
1st Mar 20167:00 amRNSHorse Hill-1 Flow Test
29th Feb 20165:52 pmRNSTotal Voting Rights
23rd Feb 20167:00 amRNSUpdate- Acquisition of 5% Interest in Oil Prospect
22nd Feb 20167:00 amRNSAgreement to acquire interest in oil prospect
2nd Feb 20167:00 amRNSGrant of Options and Directors' Shareholdings
1st Feb 20161:29 pmRNSTotal Voting Rights
12th Jan 20162:17 pmRNSShare Incentive Plan and Directors' Dealings
31st Dec 201510:20 amRNSTotal Voting Rights
23rd Dec 20152:49 pmRNSResult of AGM, Capital Reorganisation and TVR
18th Dec 20153:59 pmRNSDirector/PDMR Shareholding
17th Dec 20155:10 pmRNSIssue of Equity, Proposed Capital re-organisation
15th Dec 20152:42 pmRNSDirector/PDMR Shareholding
11th Dec 20154:39 pmRNSHolding(s) in Company
25th Nov 20152:24 pmRNSDisposal of Investment - Update
23rd Nov 20157:00 amRNSFinal Results for the Year Ended 30 June 2015
16th Nov 20157:00 amRNSOil and Gas Cooperation Agreement
22nd Oct 20152:31 pmRNSSale of interest
1st Oct 20152:21 pmRNSHolding(s) in Company
1st Oct 20157:00 amRNSBoard Change and Restructuring
21st Sep 20154:40 pmRNSSecond Price Monitoring Extn
21st Sep 20154:35 pmRNSPrice Monitoring Extension
15th Sep 20153:11 pmRNSDirectorate Change
14th Sep 20153:14 pmRNSHolding(s) in Company
2nd Sep 20157:00 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.