Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksReabold Resources Regulatory News (RBD)

Share Price Information for Reabold Resources (RBD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.075
Bid: 0.07
Ask: 0.08
Change: 0.0075 (11.11%)
Spread: 0.01 (14.286%)
Open: 0.0675
High: 0.075
Low: 0.0675
Prev. Close: 0.0675
RBD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Romania Well Flow Test Operations

2 Jul 2020 07:00

RNS Number : 7842R
Reabold Resources PLC
02 July 2020
 

2 July 2020 

Reabold Resources plc

("Reabold" or the "Company")

Update on Romania Well Flow Test Operations

 

Reabold, the AIM investing company which focuses on investments in upstream oil and gas projects, is pleased to provide an update on well flow test operations at the Iecea Mica-1 ("IMIC-1") well in Romania as part of the 2020 work programme (the "Work Programme").

 

The Work Programme is being carried out by Danube Petroleum Limited ("Danube"), which has a 100 per cent. interest in the Parta Sole Risk Area and will, on completion of the farmout to Tamaska Oil & Gas (see Reabold's announcement of 8 April 2019) have a 50 per cent. interest in the Parta Exploration Licence.

 

Reabold holds a 50.8 per cent. equity interest in Danube. ADX Energy Ltd ("ADX") is the operator of IMIC-1.

 

Highlights:

· Well production equipment has been run into the IMIC-1 well which has been perforated to initiate flow from the Lower Pannonian Pa IV gas reservoir

o The PaV and Pa III potential gas reservoirs were not perforated during the current operations

· Mud filtrate build-up around the well bore has potentially occurred; following further diagnostic work, acidization of the well may be implemented to enhance flow

o Reservoir acidization may be required to break down mud filter cake which builds up around the well bore and is relatively common practice in the region

o Cuttings from IMIC-1 drilling analysis together with modern petrophysical analysis of the newly acquired IMIC-1 logs indicated good Pa IV gas reservoir permeability

· The programme will be ongoing over the coming weeks including down hole pressure measurement, fluid sampling and future stimulation or further testing programmes

· Further down hole pressure measurement and sampling of reservoir fluids work will be undertaken utilising low-cost wire line equipment following rig demobilisation

 

As announced on 9 September 2019, the IMIC-1 well encountered gas across three zones with a 20 BCF 2C contingent resources estimate. The well was suspended for future completion as a producer following testing. Testing had been deferred until down hole well production equipment was manufactured so that the well could be optimally completed utilising underbalanced perforation with a view to maximising well productivity.

 

The production equipment required to flow test the well has been run into the well and the well has been perforated to initiate flow from the Pa IV gas reservoir. While some inflow from the well is evident from wellhead pressure manifold data, gas flow from the well to surface has not yet been achieved following perforation and nitrogen treatment to minimise the pressure against the Pa IV gas reservoir. The well has been checked utilising electric line logging equipment which confirmed the perforation guns have indeed been fired across the PA IV reservoir.

 

The results to date suggest the presence of mud filtrate build up around the well bore given that the IMIC-1 well encountered good reservoir porosity (20% within the net pay gas zone) and gas saturations in the Pa IV sandstone reservoir based on electric wireline logs and gas shows (gas inflow to the drilling mud) while drilling late last year. In addition, well test results from the nearby historic well drilled in the mid-1980s flowed at up to 1 MMSCFPD and subsequent cuttings from IMIC-1 drilling analysis together with modern petrophysical analysis of the newly acquired IMIC-1 logs indicated good Pa IV gas reservoir permeability.

 

The workover rig used to run the well production equipment prior to testing is being demobilised as it is no longer required for ongoing flow assessment work. Further down hole pressure measurement and sampling of reservoir fluids work will be undertaken utilising low-cost wire line equipment following rig demobilisation.

 

Mud filtrate build-up around the well bore has potentially occurred resulting in reservoir fluids being blocked due to mud ingress into the reservoir and the build-up of non-permeable filtrate from drilling mud. This damage can be overcome with acidization, which is a routine practice within these reservoirs in the Pannonian basin where carbonate cement between the matrix porosity containing movable hydrocarbons is common. Modern rock typing work has established the presence of carbonate cement (Siderite) within the Pa IV reservoir. A nearby oil well (2.5 km to the north) required acidization prior to initial commercial flow. ADX will assess the potential for stimulation and clean up using acidization to initiate commercial well flows following the ongoing down hole pressure and sampling work mentioned above.

 

Further flow testing results will be provided to shareholders over the coming weeks including the analysis of down hole pressure measurement and fluid sampling as well as the results of any future clean up stimulation or testing programs.

 

ENDS

 

For further information please contact:

Reabold Resources plc

Stephen Williams

Sachin Oza

c/o Camarco

+44 (0) 20 3757 4980

Strand Hanson Limited (Nominated and Financial Adviser)

James Spinney

Rory Murphy

James Dance

 

+44 (0)20 7409 3494

Stifel Nicolaus Europe Limited - Joint Broker

Callum Stewart 

Simon Mensley

Ashton Clanfield

 

Whitman Howard Limited - Joint Broker

Hugh Rich

Nick Lovering

+44 (0) 20 7710 7600

 

 

 

 

+44 (0) 20 7659 1234

 

Camarco

James Crothers

Ollie Head

Billy Clegg

+44 (0) 20 3757 4980

 

 

 

Notes to Editors

 

Reabold Resources plc is an investing company investing in the exploration and production ("E&P") sector. The Company's investing policy is to acquire direct and indirect interests in exploration and producing projects and assets in the natural resources sector, and consideration is currently given to investment opportunities anywhere in the world.

 

As an investor in upstream oil & gas projects, Reabold aims to create value from each project by investing in undervalued, low-risk, near-term upstream oil & gas projects and by identifying a clear exit plan prior to investment.

 

Reabold's long term strategy is to re-invest capital made through its investments into larger projects in order to grow the Company. Reabold aims to gain exposure to assets with limited downside and high potential upside, capitalising on the value created between the entry stage and exit point of its projects. The Company invests in projects that have limited correlation to the oil price.

 

Reabold has a highly-experienced management team, who possess the necessary background, knowledge and contacts to carry out the Company's strategy.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUAUARRRUBRUR
Date   Source Headline
17th Oct 20221:00 pmRNSPurported Requisition of General Meeting
5th Oct 20223:30 pmRNSSPA for Sale of Corallian to Shell for £32 million
30th Sep 20227:00 amRNSUnaudited HY Results for 6 months ended 30/06/22
29th Sep 20227:02 amRNSPublication of PEDL183 CPR by RPS Energy
28th Sep 20227:00 amRNSConditional Acquisition of Simwell Resources
23rd Sep 20227:00 amRNSWest Newton Community Update on Planned Activity
23rd Sep 20227:00 amRNSWest Newton Community Update on Planned Activity
15th Sep 20227:00 amRNSAcquisition of North Sea Assets from Corallian
14th Sep 20227:00 amRNSAgreed Terms of Conditional Sale of Corallian
9th Sep 20224:40 pmRNSSecond Price Monitoring Extn
9th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 20227:00 amRNSResponse to Governmental Energy Plan
1st Sep 20227:00 amRNSUpdate on Corallian and acquisition of licences
14th Jul 20221:56 pmRNSHolding(s) in Company
1st Jul 20227:00 amRNSBoard Change
29th Jun 20224:31 pmRNSResults of Annual General Meeting
23rd Jun 20227:00 amRNSInvestor Presentation
21st Jun 20227:00 amRNSWest Newton Conceptual Development Plan
7th Jun 202211:53 amRNSNotice of AGM – correction of typographical error
1st Jun 202210:06 amRNSNotice of Annual General Meeting
27th May 20227:00 amRNSFull Year Results for the year ended 31 Dec 2021
26th May 20227:00 amRNSCompletion of Equity Exchange Agreement
24th May 20227:00 amRNSReabold North Sea – Presentation on New Licences
23rd May 20227:00 amRNSShareholder Approval Received for Equity Exchange
13th May 20227:00 amRNSAppointment of Chief Financial Officer
4th May 20227:00 amRNSOffer for Corallian and acquisition of licences
3rd May 20227:00 amRNSUpdate on Equity Exchange with Daybreak Oil & Gas
17th Mar 202212:21 pmRNSPlanning Application Approval for Next Phase
25th Feb 20227:00 amRNSInvestor Presentation
25th Feb 20227:00 amRNSUpdate on Equity Exchange with Daybreak Oil & Gas
24th Feb 20224:42 pmRNSSecond Price Monitoring Extn
24th Feb 20224:37 pmRNSPrice Monitoring Extension
17th Feb 202212:38 pmRNSAmendment of Existing Option Terms
25th Jan 20229:05 amRNSSecond Price Monitoring Extn
25th Jan 20229:00 amRNSPrice Monitoring Extension
17th Jan 20224:41 pmRNSSecond Price Monitoring Extn
17th Jan 20224:35 pmRNSPrice Monitoring Extension
17th Jan 20227:00 amRNSWest Newton Flow Rate Update
23rd Dec 20217:00 amRNSVictory – Submission of Draft FDP
2nd Dec 20212:00 pmRNSPrice Monitoring Extension
26th Nov 20217:00 amRNSWest Newton – Rathlin’s Update to Residents
22nd Oct 20217:00 amRNSDirectors’ Dealings
21st Oct 20217:00 amRNSCreation of Enhanced California E&P Company
20th Oct 202111:05 amRNSSecond Price Monitoring Extn
20th Oct 202111:00 amRNSPrice Monitoring Extension
20th Oct 20217:00 amRNSVictory CPR and Corallian Strategic Review
13th Oct 20217:00 amRNSWest Newton Well Test Operations Update
4th Oct 202111:00 amRNSPrice Monitoring Extension
1st Oct 20217:00 amRNSWest Newton A Site Planning Decision
30th Sep 20214:05 pmRNSUnaudited Interim Results 6months ended 30 June 21

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.