Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPhoenix Copper. Regulatory News (PXC)

Share Price Information for Phoenix Copper. (PXC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.00
Bid: 11.50
Ask: 12.50
Change: 0.00 (0.00%)
Spread: 1.00 (8.696%)
Open: 12.00
High: 12.00
Low: 12.00
Prev. Close: 12.00
PXC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Update for the Empire Open Pit Mine

4 May 2020 07:00

RNS Number : 7265L
Phoenix Copper Limited
04 May 2020
 

Phoenix Copper Limited / Ticker: PXC / Sector: Mining 

4 May 2020

 

Phoenix Copper Limited

("Phoenix" or the "Company")

 

NI 43-101 Compliant Resource Update for the Empire Open Pit Mine shows substantial increase in gold, silver, copper, and zinc

 

Phoenix Copper Ltd (AIM: PXC, OTCQX: PXCLF), the AIM quoted North American focused base and precious metals company, is pleased to announce an updated NI 43-101 compliant resource for its Empire Open Pit Mine in Idaho, USA. The results of the Empire Mine work programme, to date, were published throughout the period 2017 to present, and can be found on the Company's website at www.phoenixcopperlimited.com.

 

Highlights

 

· New NI 43-101 compliant resource reported at the Empire Mine oxide open pit based on future recovery of copper, zinc, gold and silver increases Measured & Indicated resources by 27%

 

· Measured & Indicated open pit resource using a combined metal cut-off grade of 0.36% copper equivalent, compared with the previously reported May 2019 resource using a copper-only cut-off of 0.184%, has increased as follows:

 

Metal

Measured & Indicated resource

 

Including Inferred resources

May 2020

May 2019

Increase

Copper (tonnes)

81,948

73,872

11%

129,932

Zinc (tonnes)

37,650

29,813

26%

50,549

Silver (ounces)

6,824,460

6,038,000

13%

9,502,495

Gold (ounces)

217,500

139,000

56%

342,249

Measured & Indicated Tonnes

19,302,000

15,169,000

27%

 

 

 

 

· The next step is to continue metallurgical evaluation of process designs for the polymetallic ore with the objective of maximising the recovery of copper, zinc, gold and silver, in comparison to the processing of only oxide-copper ore and taking the other metals simply as by-products from the oxide copper processing

 

· An updated Preliminary Economic Assessment for the Empire Mine open pit project based on this updated resource and revised processing methods will follow in due course

 

 

Ryan McDermott, Chief Executive Officer, commented: "I am pleased to report this significant increase to our Empire polymetallic open pit resource. As we stated throughout 2019 and early 2020, our team has continued work on the main Empire orebody at the same time as we are moving forward at the Red Star project.

 

"After a detailed review of all of the geochemical and geological data available for the Empire open pit project, it was noted that much of the gold and silver in the deposit was not being included as part of the oxide copper resource because the gold and silver mineralisation was not always spatially associated with copper grades meeting the cut-off criteria. We believe this is perhaps due to a gold and silver mineralising event that occurred later than the primary copper mineralising event and occurred on a trend with a different orientation than the primary copper mineralisation.

 

"In this updated resource estimation Hard Rock Consulting ("HRC") modelled the various mineralised trends separately so that substantial gold and silver grades could stand on their own and not be subjected solely to the surrounding copper values. This has resulted in a larger overall pit shell that is inclusive of significantly more metal. The next step for the Phoenix team will be to continue with the metallurgical evaluation of process designs for the polymetallic ore with the objective of maximising the recovery of copper, zinc, gold and silver, versus the processing of oxide-copper ore and taking the other metals simply as by-products from the oxide copper processing.

 

"Including the inferred resources, we now have 129,923 tonnes of copper, 50,549 tonnes of zinc, 9,502,495 ounces of silver and 342,249 ounces of gold.

 

"Also, I look forward to keeping you up-to-date on our open pit project, as well as reporting the results of our second phase of drilling at Red Star, which commenced on 27 April."

 

Empire Mine - 2020 Resource Update

 

In May 2019 an NI 43-101 compliant resource on the oxide copper deposit at Empire was generated for a heap leach SX/EW open pit to recover copper. This heap leach operation would not recover gold and silver unless a separate heap leach precious metals operation was built on completion of the copper leaching operation. With an agitation leach plant to recover copper and zinc followed by a gold/silver Merrill Crowe recovery circuit as an alternative to the heap leach operation it was decided to evaluate the resources based on the recovery of copper, zinc, gold and silver. With the gold price performance since the 2019 resource calculation this has been an increasingly attractive alternative to the heap leach option.

 

Based on the examination of the distribution of gold, silver, and zinc values, and independent of copper values, from the assays used in the May 2019 Empire oxide resource, HRC estimated this updated NI 43-101 compliant resource using the value of all gold, silver, copper and zinc in the deposit using a combined metal cut-off grade of 0.36% copper equivalent. The Measured & Indicated Empire Mine open pit resource based on a combined metal cut-off grade of 0.36% copper equivalent, compared with the May 2019 resource at a copper-only cut-off of 0.184%, is tabulated as follows: -

 

 

Mineral Resource Statement for Empire Mine, after Hard Rock Consulting May 2020

 

CLASS

Tonnes

Cu Equiv %

Average Grade

Metal Content

Cu

Zn

Ag

Au

Cu

Zn

Ag

Au

Cu Equiv

%

%

g/t

g/t

tonnes

tonnes

ozs

ozs

Tonnes

Measured

6,389,000

0.82

0.46

0.22

11.8

0.315

 29,134

14,184

2,423,810

64,703

52,408

Indicated

 12,913,000

0.79

0.41

0.18

10.6

0.368

52,814

23,502

4,400,649

152,797

102,094

M+I

 19,302,000

0.80

0.42

0.20

11.0

0.351

 81,948

37,685

6,824,460

217,500

154,502

Inferred

 10,544,000

0.81

0.46

0.12

7.9

0.368

 47,975

12,864

2,678,035

124,749

85,043

 

 

Mineral Resource Statement for Empire Mine, after Hard Rock Consulting May 2019

CLASS

Tonnes

Average Grade

Metal Content

Cu

Zn

Ag

Au

Cu

Zn

Ag

Au

%

%

g/t

g/t

tonnes

tonnes

ozs

ozs

Measured

6,176,000

0.49

0.21

12.2

0.26

30,419

12,864

2,419,000

51,000

Indicated

8,993,000

0.48

0.19

12.5

0.30

43,453

16,949

3,618,000

88,000

M+I

15,169,000

0.49

0.20

12.4

0.28

73,872

29,813

6,038,000

139,000

Inferred

4,271,000

0.44

0.13

9.8

0.32

18,993

5,449

1,340,000

44,000

 

 

It should be noted that HRC utilised the same assay data to tabulate the current resource estimate that was used for the May 2019 resource. The method of estimation for the resource presented above included the calculation of a copper equivalent cut-off grade of 0.36% so as not to exclude gold, silver and zinc occurring at resource grades in areas where the copper grade alone did not meet the cut-off criteria. This resource estimation did not utilise any new drilling data.

 

The HRC report entitled "2020 Resource Updated for the Empire Mine Project" by HRC for Konnex Resources (80% Phoenix US subsidiary) will be available for review on the Company's website at www.phoenixcopperlimited.com within 45 days of the issuance of this news release. This report is in imperial units (1 US short ton = 2,000 lbs, 1 metric tonne = 2,204.6 lbs). HRC estimated the mineral resource for the Project based on drill hole data constrained by geologic boundaries with an Ordinary Krige algorithm. Leapfrog Geo V4.4.2 software was used to complete the resource estimate.

 

The mineral resources for the Project have been estimated in a manner consistent with the NI 43-101 Committee of Mineral Reserves International Reporting Standards ("CRIRSCO") of which both the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") and Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") are members.

 

An updated Preliminary Economic Assessment for the Empire Mine open pit project based on this updated resource and revised processing methods will follow in due course.

 

Qualified Person

 

The information in this announcement has been reviewed by Roger Turner A.C.S.M., M.Sc., M.I.M.M.M., C.Eng., Chief Technical Officer and Director of the Company. Mr Turner is a graduate mining engineer from the Camborne School of Mines with an MSc in Economic Geology from Leicester University with more than 40 years' experience in mine development, construction and operation and is a qualified person under the AIM Rules. Mr Turner consents to the inclusion of the information in the form and context in which they appear.

 

Environmental, Social, and Corporate Governance

Phoenix is committed to meeting and exceeding the environmental standards required by law as a core value of the Company. The baseline environmental data collected to date will be used for furthering the permitting process, but as importantly, will be used as the building blocks for the Company's future Environmental, Social, and Corporate Governance (ESG) platform.

 Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Contacts

For further information please visit www.phoenixcopperlimited.com or contact:

Phoenix Copper Limited

Ryan McDermott

Dennis Thomas

Richard Wilkins

Tel: +1 208 954 7039

Tel: +44 7827 290 849

Tel: +44 7590 216 657

 

SP Angel

(Nominated Adviser)

 

David Hignell / Caroline Rowe

Tel: +44 20 3470 0470

Brandon Hill Capital (Joint Broker)

Jonathan Evans / Oliver Stansfield

 

Tel: +44 20 3463 5000

WH Ireland (Joint Broker)

Harry Ansell / Adam Pollock / Katy Mitchell

Tel: +44 207 2201666

Blytheweigh

(Financial PR)

Tim Blythe / Camilla Horsfall / Megan Ray

Tel: +44 20 7138 3204

 

 

Notes

 

Phoenix Copper Limited is a North American focused, base and precious metal explorer and developer, which has carried out a drilling programme and generated a copper, gold, silver and zinc resource on which it is carrying out a feasibility study to bring the historically producing Empire Mine in Idaho, USA, back into production. It is also evaluating the silver and gold resources around three other past producing mines within the 23 km2 Empire claims block as well as cobalt in two claims blocks north of Empire in Idaho.

Phoenix's primary operations are focused near Mackay, Idaho in the Alder Creek mining district. This district includes the historical Empire, Horseshoe, White Knob and Blue Bird Mines, past producers of copper, gold, silver, zinc, lead and tungsten from underground mines in the first half of the twentieth century. Additionally, the district includes Navarre Creek a Carlin-trend gold discovery which hosts a 6.1 km gold strike length within a 9.8 km² area.

Phoenix acquired an 80% interest in the historical Empire Mine property in 2017 and, based on a total of 320 drill holes, an oxide resource was completed in late 2017. A NI 43-101 compliant PEA (preliminary economic assessment) for an open pit heap leach solvent extraction and electrowinning ("SX-EW") mine was completed in April 2018. In 2018 a further 8,600 metres in 93 holes was completed to upgrade the oxide resources, provide samples for ongoing metallurgical test work, geotechnical and hydrological studies and condemnation drilling for the heap leach pad site, waste dump and plant site. An updated NI 43-101 compliant resource was completed in early May 2019.

Since acquiring the Empire project, Phoenix has increased the claim area from 818 acres to 5,717 acres, mainly to the northwest and west, and in so doing has increased the potential for additional oxide and sulphide copper resources, as well as the potential for stand-alone gold and silver resources, along a strike length of approximately 5.4 km towards the other brownfield mines of the Horseshoe, White Knob and Blue Bird Mines now within the property boundary. In particular, a new discovery at Red Star, 330 metres north west of the Empire Mine proposed open pit, has revealed sulphide ore and from three shallow exploration drill holes a NI 43-101 compliant maiden resource of 1.6 million silver equivalent ounces was reported.

At Empire, it is estimated that less than 1% of the potential ore system has been explored to date and, accordingly, there is significant opportunity to increase the resource through phased exploration.

More details on the Company, its assets and its objectives can be found on PXC's website at www.phoenixcopperlimited.com.

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLKKDBDABKDKPK
Date   Source Headline
8th Apr 202412:25 pmRNSBlock Listing Six Monthly Return
27th Mar 20247:00 amRNSExtension of Warrants
19th Mar 20247:00 amRNSPurchase of Empire Processing Equipment Finalised
4th Mar 20247:00 amRNSRefinancing of Short-Term Loan Facility
19th Feb 20247:00 amRNSUpdate: Purchase of Equipment and Debt Refinancing
31st Jan 20246:15 pmRNSResult of Retail Offer and Additional Subscription
26th Jan 202412:10 pmRNSResult of Placing and Subscription
26th Jan 20249:25 amRNSClose of Accelerated Bookbuild
26th Jan 20247:01 amRNSRetail Offer
26th Jan 20247:00 amRNSProposed Placing, Subscription and Retail Offer
18th Jan 20247:00 amRNSOperational Update
5th Jan 20247:00 amRNSCorporate copper bonds and loan facility update
11th Dec 20237:00 amRNSExtension of Loan Facility
20th Nov 20237:00 amRNSExtension of Loan Facility
24th Oct 20237:00 amRNSUpdate for Navarre Creek Exploratory Drilling
10th Oct 20235:02 pmRNSBlock Listing Six Monthly Return
28th Sep 20237:00 amRNSInterim Results
4th Sep 20237:00 amRNSResults of Metallurgical Testing at Empire Mine
17th Jul 20237:00 amRNSCommencement of Navarre Creek Drilling Programme
23rd Jun 20237:00 amRNSExtension of Loan Facility
8th Jun 202312:33 pmRNSResult of Annual General Meeting
6th Jun 20237:00 amRNSPreliminary Results of Metallurgical Testing
25th May 20237:00 amRNSFinal results for the year ended 31 December 2022
12th Apr 20237:00 amRNSExploration Drilling Results at the Empire Mine
6th Apr 20237:00 amRNSBlock Listing Six Monthly Return
29th Mar 20239:05 amRNSSecond Price Monitoring Extn
29th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20239:05 amRNSSecond Price Monitoring Extn
24th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSCorporate Update
16th Mar 20237:00 amRNSFurther Results of Metallurgical Core Drilling
12th Jan 20237:00 amRNSFurther Results of Metallurgical Core Drilling
5th Jan 20237:00 amRNSPhoenix Subsidiary Welcomes New General Manager
4th Jan 20237:00 amRNSAdditional Results of Metallurgical Core Drilling
9th Dec 202211:00 amRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSInitial Results of Metallurgical Core Drilling
6th Oct 20227:00 amRNSBlock Listing Six Monthly Return
29th Sep 202211:05 amRNSSecond Price Monitoring Extn
29th Sep 202211:00 amRNSPrice Monitoring Extension
29th Sep 20227:00 amRNSInterim Results
23rd Sep 20229:06 amRNSSecond Price Monitoring Extn
23rd Sep 20229:00 amRNSPrice Monitoring Extension
20th Sep 20221:47 pmRNSTR-1: Notification of major holdings
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20222:05 pmRNSSecond Price Monitoring Extn
13th Sep 20222:00 pmRNSPrice Monitoring Extension
8th Sep 20227:00 amRNSOperational & Financing Update
12th Jul 20227:00 amRNS2022 Drilling Programme Underway at Empire
5th Jul 20224:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.