Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

2 Sep 2016 07:00

RNS Number : 7654I
President Energy PLC
02 September 2016
 

02 September 2016

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

OPERATIONAL UPDATE

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its operations.

Highlights

Argentina

· Drilling operations ongoing at DP1002 S/T Puesto Guardian Concession, Argentina

· Subject to successful execution, the well is targeted to be hooked up and in full production during first part of October adding, as a base case, 500 bopd, which would double existing production from the Concession

· Current production at Puesto Guardian Concession of 510 bopd with July average of 440 bopd

· Coiled Tubing campaign to commence mid-September on four old and currently shut in wells at Puesto Guardian to add incremental new production and expand producing well stock

· President engaged with fellow E&P Company in cost sharing and procurement

Louisiana

· Net production expected to return to 250 bopd by end September after two wells come on-stream

Well DP1002 S/T, Dos Puntitos Field, Puesto Guardian Concession, Argentina

Drilling operations are ongoing, albeit with certain delays. Five days of non-productive time ("NPT") were lost due to electro-mechanical issues relating to the Drilling Rig. This is substantially at zero cost to President and after the issues were solved the Rig has delivered to date drilling rates of penetration ahead of the Company's expectations.

The well reached 3,475m (true vertical depth ("TVD") of 3,078m) before, what the Company currently considers a material metal failure in a drill pipe of the Drilling Contractor, caused loss of the Bottom Hole Assembly ("BHA"), for which loss President has in place insurance cover. A cement plug is now being set and the well will continue to be drilled out from 2,920m (TVD 2,896m). The material failure is being investigated by the Company.

Up to the date of failure the well was being drilled on plan (subject to the NPT) with oil based mud and with no material surprises in the geological formations encountered.

The side track out from 2,920m will be drilled to the casing point at the start of the Yacoraite section being at 3,850m (TVD 3,111m). On casing, the horizontal leg will be drilled, the well tested and then hooked up with full production, subject to successful execution, targeted for the first half of October.

Subject thereto, management considers a base case initial projected production for this well of 500 bopd, which would double the existing production levels from the Concession.

Production in Puesto Guardian Concession, Argentina

Current daily production from the Concession is now at 510 bopd having had an average of 440 bopd in July.

Taking advantage of the current market conditions, with greater cost effective availability of services and equipment, a workover of four old shut in wells will commence during September utilising for the first time in the Concession a coiled tubing unit with nitrogen lift capability. The workovers are designed to achieve a helpful increment to overall production as well as to expand the Company's inventory of producing wells to give more stabilised field production rates.

Co-operation with fellow E & P Company deepens

Petro AP is an E&P subsidiary of the Chinese conglomerate TCL (turnover 2015‎ US$16.2 bln - CNY105 Bln) which is a fellow operator in the North West basin of Argentina. In particular Petro AP has the Pizzaro Licence bordering the Puesto Guardian Concession and will be drilling an exploration well there with the same H&P Flex 3 Rig that President is currently using after the first two wells being drilled by the Company.

Petro AP and President have entered into a Cooperation Agreement under which the mobilisation and demobilisation costs of the H&P drilling rig is shared equally. This has been expanded to sharing costs of other aspects of services including inspections, drilling mud and supervision. The Companies having generated mutual respect continue to engage to discuss further opportunities for cooperation and cost savings including but not limited to joint equipment purchases and procurement.

Louisiana

Having suffered from well declines and shut-ins in the year to date, Louisiana production is projected to be back to in the region of 200-250 boepd by the end of September as a result of two wells coming on stream. Louisiana continues to generate free operating cash flow,despite the prevailing low oil price.

 

Peter Levine, Chairman, commented:

 "Whilst the new well DP1002 ST, a first horizontal at our Puesto Guardian Concession, has experienced certain unforeseen issues to date, drilling is ongoing and the management is focussed on delivering a successful well and achieving the production potential.

The current production level at Puesto Guardian is pleasing and our continued efforts aim to enhance and stabilise production levels of which the forthcoming work-over programme of old shut-in wells is an example.

Finally, in Louisiana, after a period of lower production we are working towards achieving the previous level of 250 boepd by the end of September."

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

Miles Biggins, BSc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets

Neil Haycock, Tom Rider

and Jeremy Low

 

 +44 (0) 207 236 1010

 

Bell Pottinger

Gavin Davis, Henry Lerwill and Charles Stewart

 

+44 (0) 203 772 2500

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUAUBUPQPUG
Date   Source Headline
20th Mar 20097:00 amRNSOperations Update
16th Feb 200912:41 pmRNSMichigan road restrictions
30th Jan 20097:00 amRNSTrading Update
22nd Dec 20087:00 amRNSOperational Update
12th Nov 20087:00 amRNSOperations Update
3rd Nov 200812:03 pmRNSHolding(s) in Company
23rd Oct 20085:14 pmRNSResult of EGM
23rd Oct 20087:00 amRNS3D Seismic Contract Signed for Australian Licence
21st Oct 20087:00 amRNSProduction and Reserves Update
25th Sep 20087:00 amRNSShare Consolidation
25th Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSOperations Update
11th Aug 20083:28 pmRNSNotice of Results
5th Aug 20087:00 amRNSOperations Update
15th Jul 200812:52 pmRNSDirector/PDMR Shareholding
10th Jul 200811:16 amRNSUpdate on Shareholder Registe
4th Jul 20087:00 amRNSProduction Update
1st Jul 20082:50 pmRNSCompletion of Acquisition
23rd Jun 20084:54 pmRNSNotification of Interest
20th Jun 20083:12 pmRNSNotification of Interest
19th Jun 20089:10 amRNSAIM Censure
19th Jun 20089:00 amRNSAIM Disciplinary Notice
16th Jun 20083:42 pmRNSDirector/PDMR Shareholding
13th Jun 20084:17 pmRNSGrant of Options
12th Jun 20083:10 pmRNSHolding(s) in Company
12th Jun 20087:00 amRNSAcquisition and Debt Facility
12th Jun 20087:00 amRNSOperations Update
11th Jun 20084:17 pmRNSHolding(s) in Company
5th Jun 20087:00 amRNSRe. Share Register
29th May 200812:39 pmRNSUpdate on Australian Licences
29th May 20087:00 amRNSIncreased allowable productio
20th May 20082:12 pmRNSNotification of interest
19th May 20082:06 pmRNSAnnual Report and Accounts
14th May 20086:30 pmRNSNotification of Interest
13th May 20089:08 amRNSNew daily production record a
6th May 200810:38 amRNSProduction Update
23rd Apr 20083:01 pmRNSOperations Update
17th Apr 20086:06 pmRNSNotification of Interest
17th Apr 20086:02 pmRNSNotification of Interest
16th Apr 20087:00 amRNSPreliminary Results
11th Apr 20083:57 pmRNSNotification of Interest
26th Mar 20088:46 amRNSEPT - Meridian Petroleum
25th Mar 20081:08 pmRNSUpdate on Offer & Operations
25th Mar 200810:42 amRNSEPT - Meridan Petroleum
20th Mar 20088:40 amRNSEPT - Meridian Petroleum
19th Mar 20089:34 amRNSEPT - Meridian Petroleum
18th Mar 20088:56 amRNSEPT - Meridian Petroleum
14th Mar 200810:43 amRNSEPT - Meridian Petroleum PLC
12th Mar 20082:35 pmRNSHolding(s) in Company
10th Mar 200811:56 amRNSEPT - Meridian Petroleum

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.