We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

2 Sep 2016 07:00

RNS Number : 7654I
President Energy PLC
02 September 2016
 

02 September 2016

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

OPERATIONAL UPDATE

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its operations.

Highlights

Argentina

· Drilling operations ongoing at DP1002 S/T Puesto Guardian Concession, Argentina

· Subject to successful execution, the well is targeted to be hooked up and in full production during first part of October adding, as a base case, 500 bopd, which would double existing production from the Concession

· Current production at Puesto Guardian Concession of 510 bopd with July average of 440 bopd

· Coiled Tubing campaign to commence mid-September on four old and currently shut in wells at Puesto Guardian to add incremental new production and expand producing well stock

· President engaged with fellow E&P Company in cost sharing and procurement

Louisiana

· Net production expected to return to 250 bopd by end September after two wells come on-stream

Well DP1002 S/T, Dos Puntitos Field, Puesto Guardian Concession, Argentina

Drilling operations are ongoing, albeit with certain delays. Five days of non-productive time ("NPT") were lost due to electro-mechanical issues relating to the Drilling Rig. This is substantially at zero cost to President and after the issues were solved the Rig has delivered to date drilling rates of penetration ahead of the Company's expectations.

The well reached 3,475m (true vertical depth ("TVD") of 3,078m) before, what the Company currently considers a material metal failure in a drill pipe of the Drilling Contractor, caused loss of the Bottom Hole Assembly ("BHA"), for which loss President has in place insurance cover. A cement plug is now being set and the well will continue to be drilled out from 2,920m (TVD 2,896m). The material failure is being investigated by the Company.

Up to the date of failure the well was being drilled on plan (subject to the NPT) with oil based mud and with no material surprises in the geological formations encountered.

The side track out from 2,920m will be drilled to the casing point at the start of the Yacoraite section being at 3,850m (TVD 3,111m). On casing, the horizontal leg will be drilled, the well tested and then hooked up with full production, subject to successful execution, targeted for the first half of October.

Subject thereto, management considers a base case initial projected production for this well of 500 bopd, which would double the existing production levels from the Concession.

Production in Puesto Guardian Concession, Argentina

Current daily production from the Concession is now at 510 bopd having had an average of 440 bopd in July.

Taking advantage of the current market conditions, with greater cost effective availability of services and equipment, a workover of four old shut in wells will commence during September utilising for the first time in the Concession a coiled tubing unit with nitrogen lift capability. The workovers are designed to achieve a helpful increment to overall production as well as to expand the Company's inventory of producing wells to give more stabilised field production rates.

Co-operation with fellow E & P Company deepens

Petro AP is an E&P subsidiary of the Chinese conglomerate TCL (turnover 2015‎ US$16.2 bln - CNY105 Bln) which is a fellow operator in the North West basin of Argentina. In particular Petro AP has the Pizzaro Licence bordering the Puesto Guardian Concession and will be drilling an exploration well there with the same H&P Flex 3 Rig that President is currently using after the first two wells being drilled by the Company.

Petro AP and President have entered into a Cooperation Agreement under which the mobilisation and demobilisation costs of the H&P drilling rig is shared equally. This has been expanded to sharing costs of other aspects of services including inspections, drilling mud and supervision. The Companies having generated mutual respect continue to engage to discuss further opportunities for cooperation and cost savings including but not limited to joint equipment purchases and procurement.

Louisiana

Having suffered from well declines and shut-ins in the year to date, Louisiana production is projected to be back to in the region of 200-250 boepd by the end of September as a result of two wells coming on stream. Louisiana continues to generate free operating cash flow,despite the prevailing low oil price.

 

Peter Levine, Chairman, commented:

 "Whilst the new well DP1002 ST, a first horizontal at our Puesto Guardian Concession, has experienced certain unforeseen issues to date, drilling is ongoing and the management is focussed on delivering a successful well and achieving the production potential.

The current production level at Puesto Guardian is pleasing and our continued efforts aim to enhance and stabilise production levels of which the forthcoming work-over programme of old shut-in wells is an example.

Finally, in Louisiana, after a period of lower production we are working towards achieving the previous level of 250 boepd by the end of September."

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

Miles Biggins, BSc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets

Neil Haycock, Tom Rider

and Jeremy Low

 

 +44 (0) 207 236 1010

 

Bell Pottinger

Gavin Davis, Henry Lerwill and Charles Stewart

 

+44 (0) 203 772 2500

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUAUBUPQPUG
Date   Source Headline
26th Feb 20147:00 amRNSDirector Dealings
24th Feb 201411:54 amRNSResult of General Meeting
24th Feb 20147:00 amRNSResult of Placing and Open Offer
7th Feb 20147:00 amRNSPosting of circular and details of open offer
6th Feb 20143:03 pmRNSResults of Placing
5th Feb 20145:22 pmRNSProposed Placing and Open Offer
28th Jan 20142:55 pmRNSTR-1: Notification of Major Interest in Shares
28th Jan 20142:51 pmRNSTR-1: Notification of Major Interest in Shares
24th Jan 20147:00 amRNSNew Independent Audit of Resources in Paraguay
10th Jan 20147:00 amRNSProposed New Farm-In
8th Jan 20147:00 amRNSOperational Update
20th Dec 20132:42 pmRNSTR-1: Notification of Major Interest in Shares
18th Dec 20137:00 amRNSCompletion of IFC Equity Subscription
5th Dec 20137:00 amRNSInternational Finance Corporation Equity
3rd Dec 20137:00 amRNSTR-1: Notification of Major Interest in Shares
26th Nov 20131:43 pmRNSTR-1: Notification of Major Interest in Shares
15th Nov 20137:00 amRNSExercise of Options
5th Nov 20137:00 amRNSAppointment of Broker
4th Nov 20137:00 amRNSContract with Schlumberger for Paraguay Drilling
1st Oct 20135:24 pmRNSTR-1: Notification Of Major Interest In Shares
27th Sep 20137:00 amRNSProposed Equity Investment by the IFC
24th Sep 20137:00 amRNSInterim Results
24th Sep 20137:00 amRNSOperations Update
17th Sep 20138:38 amRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
12th Sep 20137:00 amRNSInvestor Presentation
11th Sep 20134:35 pmRNSPrice Monitoring Extension
19th Aug 20135:17 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
5th Aug 20137:00 amRNSParaguay Update -Encouraging early seismic results
29th Jul 20137:00 amRNSArgentina Operational Update
16th Jul 20137:01 amRNSTR-1: Notification of Major Interest in Shares
12th Jul 20137:00 amRNSTR-1: Notification of Major Interest in Shares
12th Jul 20137:00 amRNSDirector Dealing
10th Jul 20137:00 amRNSOPERATIONAL UPDATE
27th Jun 20137:00 amRNSArgentina Operational Update
14th Jun 20131:45 pmRNSResult of AGM
14th Jun 20137:00 amRNSOperations Update
5th Jun 20133:39 pmRNSNotification of Major Interest in Shares
16th May 20137:00 amRNSAGM notice and mailing of Annual Report
9th May 20137:00 amRNSDirector Dealing
2nd May 20137:00 amRNSResults for the year ended 31 December 2012
18th Apr 20137:00 amRNSParaguay Update -Commencement of Seismic Programme
17th Apr 20134:35 pmRNSPrice Monitoring Extension
15th Apr 20137:00 amRNSFraccing Operations Commence
26th Mar 20137:00 amRNSLouisiana Update
20th Mar 20134:40 pmRNSSecond Price Monitoring Extn
20th Mar 20134:35 pmRNSPrice Monitoring Extension
7th Mar 20132:19 pmRNSNotification of Major Interest in Shares
6th Mar 20137:00 amRNSArgentina Update
18th Feb 20137:00 amRNSDirector Dealings
12th Feb 20131:57 pmRNSDirector Dealing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.