Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

24 Sep 2013 07:00

RNS Number : 7002O
President Energy PLC
24 September 2013
 



24 September 2013

 

PRESIDENT ENERGY PLC

("President" or "the Company")

OPERATIONS UPDATE

 

Highlights

 

Paraguay

· Seismic shows undrilled giant* field potential

· Two proven play systems identified on seismic, Cretaceous and Paleozoic

· Identification of at least 20 structural prospects and leads

· Some individual structures could be in excess of 100 million barrels

· Full interpretation of seismic to be announced in December

· Drilling of three wells in Q2 2014 on track

 

Argentina

· Stimulation campaign deemed commercially successful

· Production generating solid operating profit

· New well stimulation programme being considered for 2014

 

Production

· Record group net oil production currently at over 540 bopd (575 boepd total production), excluding PE 8 well due shortly back on stream

 

 

Paraguay

 

President's Pirity Rift Basin- Undrilled Giant* Field Potential in Paraguay

 

President has almost completed the acquisition of 800 km of 2D seismic in addition to the 793 km2 of 3D seismic acquired earlier this year in its two very large Concessions (16,000 km2) in the Pirity Rift Basin of the Paraguayan Chaco. Early seismic processing and interpretation results are very positive and show the possibility for a significantly expanded resource potential compared to the basin estimate of 159 mmb of oil risked published in the CPR last year. At least two major structural play fairways have now been identified and although early in the interpretation, management believes the total resource potential of greater than 500 mmb oil risked could be a realistic possibility.

 

The new data show that both structural play fairways contain two proven petroleum systems. The first is the Cretaceous petroleum system, known from old 2D data and an extension of the Palmar Largo trend in Argentina. The second is a newly identified underlying Paleozoic petroleum system that has charged the giant* producing fields in neighbouring southern Bolivia and NW Argentina. Several of the Pirity Rift Basin prospects benefit from the possibility of receiving a double charge from both play systems, thereby reducing source risk. This double play system makes it possible for President's Pirity Rift Basin to develop into a large scale petroleum province.

 

Based on the new data, the Company has now identified more than 20 large structural prospects and leads. The largest prospects have closures greater than 50 km2 and several more are in the 30-40 km2 size range. This should be compared to the nearby Palmar Largo Field in Argentina which contains some 40 mmb of oil in a closure of less than 10 km2. In addition, it can already be seen from the seismic that both petroleum systems will offer significant additional unconventional resource potential, which supports the conclusions of the recent EIA unconventional report (May 2013) which quotes technically recoverable resources for just the unstructured Paleozoic areas of the Paraguayan Chaco as 67 tcf of gas and 3.2 billion barrels of oil. This could be considerably exceeded in a large scale conventional structural play fairway. In summary, the new data shows undrilled giant* field potential in the Company's Pirity Rift Basin of Paraguay.

 

President is working in partnership with our contractor Global Geophysical and will spend the next two months progressing the technical evaluation of the new data. President expects to release fully interpreted information in December, detailing both the expanded scope of basin potential and evaluation of prospects to be tested by the drill bit in 2014. No further announcements on prospectivity are expected before that time. Following the release of the fully interpreted seismic, a new CPR from DeGolyer & MacNaughton will be commissioned.

 

The Company is making preparations to drill a three well back to back campaign due to spud in Q2 2014. Negotiations are at advanced stages with rig providers and major international oil services companies for the provision of integrated project management services for the drilling operations. Further announcements on this will be made during Q4 2013. The intent is to drill and test three independent high impact prospects to evaluate the overall scale of the basin potential and establish the potential for commercial production.

 

 

Argentina

Summary of Well Stimulation Results at Puesto Guardian (PPC 50% Working Interest)

Dos Puntitas1001

After hydraulic stimulation of the carbonate and A6 intervals, an inflow test commenced on 22nd June with a Well Initial ("WI") of approximately 480-500 gross barrels of fluid per day and after five days of clean-up reached 70% oil.

After three months of production, the well has stabilised and is free flowing into the facility on a 9/16 inch choke with an average month three WI of 220 gross barrels of fluid per day, with 80% oil.

Pozo Escondido 7

After hydraulic stimulation of the carbonate interval, an inflow test was commenced on 19th July with a WI of approximately 230 gross barrels of fluid per day and after five days of clean-up reached 30% oil.

A workover was then carried out to open the A6 interval and a commingled inflow test commenced on 25th August with a WI of approximately 440-500 gross barrels of fluid per day and after three days of clean-up reached 50% oil.

After one month of production, the well is free flowing into the facility on a 45/64 inch choke with an average month one WI of 325 gross barrels of fluid per day, with 67% oil.

Pozo Escondido 8

After hydraulic stimulation of the carbonate interval, an inflow test was commenced with a WI of approximately 340 gross barrels of fluid per day and after three days of clean-up reached 15% oil.

A workover is now being carried out to open the A6 interval and a commingled inflow test will be commenced shortly. President expects results to be at least in line with Pozo Escondido 7.

Conclusions

As a result of the well stimulation campaign the gross field production has to date been increased from approximately 300 bopd to 600bopd with a further increase anticipated as contribution from Pozo Escondido 8 is added. These production levels have not been seen in the field for 5-6 years.

With the well performance data now observed, President is confident that the stimulation campaign has proven successful. With a current realised oil price of US$74/bbl and workover and stimulation costs at approximately US$1mln per well, the well initials and normal well declines observed on both the carbonate and A6 intervals in Dos Puntitas and Pozo Escondido are commercial. Furthermore, beam pumps will be installed to increase production as the wells decline.

Although more production history will be required before reserves can be booked, as a result of this campaign, President's preliminary estimate is that a gross 3-5 million barrels of new reserves can be converted from contingent resources.

President and its partner will now evaluate the twenty six additional shut in wells in the Concession for a new three to six well workover and stimulation campaign in 2014.

 

Louisiana

Production in Louisiana remains at recent highs at approximately 275 boepd net to President. Oil prices remain firm at approximately US$ 105 per barrel. Total current monthly net operating cash flow after tax to President is approximately US$ 750,000.

 

 

Peter Levine, Executive Chairman, President Energy said:

"I am extremely pleased with our positive and expeditious progress so far this year, with our three assets firing on all cylinders. Paraguay is potentially turning into a large scale hydrocarbon area, with a newly identified possible double play system emerging from our analysis to date. In Argentina, our proof of concept stimulation campaign has validated our technical assumptions, and opened up further opportunities for production and reserves in the carbonates which are prevalent on the Concession. Louisiana continues to grow steadily and is yielding strong operating cash flow to support our activities. Group oil production is at record levels. The balance of 2013 will be a very busy period for President, as we continue to analyse the expanding potential in Paraguay and prepare ourselves for the 2014 drilling campaign."

 

*[*]President defines Giant as greater than 100 million barrels of oil equivalent

 

Dr. Richard Hubbard, PhD Geology Stanford University, with 35 years of experience in the oil and gas sector, as President Chief Operating Officer, who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

 

Contact:

President Energy PLC

John Hamilton, CEO +44 (0) 207 016 7950

Ben Wilkinson, Finance Director +44 (0) 207 016 7950

 

RBC Capital Markets

Jeremy Low, Matthew Coakes, Daniel Conti +44 (0) 207 653 4000

 

Jefferies Hoare Govett

Simon Hardy, Max Jones +44 (0) 207 029 8316

 

Pelham Bell Pottinger +44 (0) 207 861 3232

Gavin Davis, Henry Lerwill

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGZLGFZGFZZ
Date   Source Headline
29th Sep 20222:04 pmRNSResult of General Meeting
27th Sep 202211:05 amRNSSecond Price Monitoring Extn
27th Sep 202211:00 amRNSPrice Monitoring Extension
27th Sep 20227:00 amRNSInterim Results
7th Sep 20227:00 amRNSCircular & Notice of General Meeting
12th Aug 20227:00 amRNSH1 Argentina Financial Results
11th Aug 20227:00 amRNSHSE Update on Puesto Flores Facility
28th Jul 20227:00 amRNSTrading and Corporate Update
25th Jul 20227:00 amRNSGreen House Capital and Argentina Update
22nd Jul 20221:58 pmRNSResult of AGM
30th Jun 20227:00 amRNSPosting of Annual Report and Notice of AGM
28th Jun 20227:00 amRNSFinal Results
16th Jun 20227:00 amRNSCorporate and Commercial Update
13th May 20227:00 amRNSQ1 Argentina Financial Results
20th Apr 20227:00 amRNSOperational and Strategy Update
15th Mar 20227:00 amRNSPositive Production Sales
14th Mar 20227:00 amRNSArgentine Minibond
1st Mar 20227:00 amRNSOperations and Management Update
14th Feb 20227:00 amRNS2021 Key Trading Highlights
7th Feb 20227:00 amRNSOperations Update
26th Jan 20227:00 amRNSArgentina Update
25th Jan 20227:00 amRNSOperational Update
13th Jan 20227:00 amRNSOperations Update
30th Dec 20217:00 amRNSAtome Energy PLC first day of dealings on AIM
24th Dec 20211:15 pmRNSPresident Energy
24th Dec 20217:00 amRNSDividend in specie in Atome Energy PLC
23rd Dec 20217:00 amRNSOperations Update
17th Dec 20217:00 amRNSSuccessful completion of fundraise by Atome Energy
16th Dec 20217:00 amRNSOperations Update
14th Dec 20217:00 amRNSInvestor Presentation - Atome Energy PLC
10th Dec 20212:05 pmRNSAtome Publishes AIM Schedule One
10th Dec 20217:00 amRNSProposed dividend in specie in Atome Energy PLC
9th Dec 20217:00 amRNSOperations Update
8th Dec 20217:00 amRNSPrimaryBid Information for President Shareholders
2nd Dec 202112:00 pmRNSExercise of Options
2nd Dec 20217:00 amRNSOperations Update
25th Nov 20217:00 amRNSCompletion of Paraguay Farm-out
24th Nov 20217:00 amRNSIssuance of Corporate Bond in Argentina
22nd Nov 20218:53 amRNSAMENDED: Operations and Corporate Update
22nd Nov 20217:00 amRNSOperations and Corporate Update
19th Nov 20217:00 amRNSPosting of Letter to Shareholders
18th Nov 202112:28 pmRNSResult of General Meeting
18th Nov 20217:00 amRNSAnnouncement made by Haldor Topsoe
17th Nov 20217:00 amRNSConfirmation of Reduction of Capital
5th Nov 20217:00 amRNSAnnouncement by Atome Energy PLC - MOU Signed
5th Nov 20217:00 amRNSOperations Update
2nd Nov 20217:00 amRNSAtome Posting and Notice Announcement
2nd Nov 20217:00 amRNSAnnouncement by Atome Energy PLC - CEO Appointment
25th Oct 20217:00 amRNSAnnouncement made by Atome Energy PLC
12th Oct 20217:00 amRNSOctober Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.