The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

2 Sep 2016 07:00

RNS Number : 7654I
President Energy PLC
02 September 2016
 

02 September 2016

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

OPERATIONAL UPDATE

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its operations.

Highlights

Argentina

· Drilling operations ongoing at DP1002 S/T Puesto Guardian Concession, Argentina

· Subject to successful execution, the well is targeted to be hooked up and in full production during first part of October adding, as a base case, 500 bopd, which would double existing production from the Concession

· Current production at Puesto Guardian Concession of 510 bopd with July average of 440 bopd

· Coiled Tubing campaign to commence mid-September on four old and currently shut in wells at Puesto Guardian to add incremental new production and expand producing well stock

· President engaged with fellow E&P Company in cost sharing and procurement

Louisiana

· Net production expected to return to 250 bopd by end September after two wells come on-stream

Well DP1002 S/T, Dos Puntitos Field, Puesto Guardian Concession, Argentina

Drilling operations are ongoing, albeit with certain delays. Five days of non-productive time ("NPT") were lost due to electro-mechanical issues relating to the Drilling Rig. This is substantially at zero cost to President and after the issues were solved the Rig has delivered to date drilling rates of penetration ahead of the Company's expectations.

The well reached 3,475m (true vertical depth ("TVD") of 3,078m) before, what the Company currently considers a material metal failure in a drill pipe of the Drilling Contractor, caused loss of the Bottom Hole Assembly ("BHA"), for which loss President has in place insurance cover. A cement plug is now being set and the well will continue to be drilled out from 2,920m (TVD 2,896m). The material failure is being investigated by the Company.

Up to the date of failure the well was being drilled on plan (subject to the NPT) with oil based mud and with no material surprises in the geological formations encountered.

The side track out from 2,920m will be drilled to the casing point at the start of the Yacoraite section being at 3,850m (TVD 3,111m). On casing, the horizontal leg will be drilled, the well tested and then hooked up with full production, subject to successful execution, targeted for the first half of October.

Subject thereto, management considers a base case initial projected production for this well of 500 bopd, which would double the existing production levels from the Concession.

Production in Puesto Guardian Concession, Argentina

Current daily production from the Concession is now at 510 bopd having had an average of 440 bopd in July.

Taking advantage of the current market conditions, with greater cost effective availability of services and equipment, a workover of four old shut in wells will commence during September utilising for the first time in the Concession a coiled tubing unit with nitrogen lift capability. The workovers are designed to achieve a helpful increment to overall production as well as to expand the Company's inventory of producing wells to give more stabilised field production rates.

Co-operation with fellow E & P Company deepens

Petro AP is an E&P subsidiary of the Chinese conglomerate TCL (turnover 2015‎ US$16.2 bln - CNY105 Bln) which is a fellow operator in the North West basin of Argentina. In particular Petro AP has the Pizzaro Licence bordering the Puesto Guardian Concession and will be drilling an exploration well there with the same H&P Flex 3 Rig that President is currently using after the first two wells being drilled by the Company.

Petro AP and President have entered into a Cooperation Agreement under which the mobilisation and demobilisation costs of the H&P drilling rig is shared equally. This has been expanded to sharing costs of other aspects of services including inspections, drilling mud and supervision. The Companies having generated mutual respect continue to engage to discuss further opportunities for cooperation and cost savings including but not limited to joint equipment purchases and procurement.

Louisiana

Having suffered from well declines and shut-ins in the year to date, Louisiana production is projected to be back to in the region of 200-250 boepd by the end of September as a result of two wells coming on stream. Louisiana continues to generate free operating cash flow,despite the prevailing low oil price.

 

Peter Levine, Chairman, commented:

 "Whilst the new well DP1002 ST, a first horizontal at our Puesto Guardian Concession, has experienced certain unforeseen issues to date, drilling is ongoing and the management is focussed on delivering a successful well and achieving the production potential.

The current production level at Puesto Guardian is pleasing and our continued efforts aim to enhance and stabilise production levels of which the forthcoming work-over programme of old shut-in wells is an example.

Finally, in Louisiana, after a period of lower production we are working towards achieving the previous level of 250 boepd by the end of September."

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

Miles Biggins, BSc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets

Neil Haycock, Tom Rider

and Jeremy Low

 

 +44 (0) 207 236 1010

 

Bell Pottinger

Gavin Davis, Henry Lerwill and Charles Stewart

 

+44 (0) 203 772 2500

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUAUBUPQPUG
Date   Source Headline
24th Mar 201510:20 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
20th Mar 201510:56 amRNSResult of General Meeting and Placing
11th Mar 20157:00 amRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
9th Mar 20157:00 amRNSParaguay Regulatory Update
4th Mar 20157:00 amRNSOperational Update
4th Mar 20157:00 amRNSFundraising
3rd Mar 20154:23 pmRNSParaquay Update
27th Feb 20154:09 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
26th Feb 201511:52 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
4th Feb 20157:00 amRNSDirector Appointment
15th Jan 20157:00 amRNSManagement Changes
8th Jan 20157:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
8th Jan 20157:00 amRNSLouisiana Update
29th Dec 20147:00 amRNSPARAGUAY UPDATE
11th Dec 20147:00 amRNSArgentina Update
10th Dec 20147:00 amRNSHydrocarbons Present in the Santa Rosa Formation
1st Dec 20147:00 amRNSChange of Registered Office
1st Dec 20147:00 amRNSCorporate Update
17th Nov 20147:00 amRNSLapacho Well Update
6th Nov 20147:00 amRNSInvestor Presentation
27th Oct 201411:13 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Oct 20147:00 amRNSTR-1:Notification of Major Interest in Shares
20th Oct 20147:00 amRNSOil Discovery in Paraguayan Chaco
1st Oct 20147:00 amRNSDrilling Update
18th Sep 20144:40 pmRNSSecond Price Monitoring Extn
18th Sep 20144:35 pmRNSPrice Monitoring Extension
12th Sep 20147:00 amRNSInterim Results
11th Sep 20147:00 amRNSProduction Update & New Successful Discovery Well
4th Sep 20147:00 amRNSLapacho Well Spuds & Jacaranda well evaluation
14th Aug 20147:00 amRNSPresident Farms into Hernandarias Block, Paraguay
13th Aug 20147:00 amRNSJacaranda Well Update
30th Jul 20147:00 amRNSPuesto Guardian Acquisition
11th Jul 20144:40 pmRNSSecond Price Monitoring Extn
11th Jul 20144:35 pmRNSPrice Monitoring Extension
3rd Jul 20147:00 amRNSAward of Options
23rd Jun 20144:07 pmRNSAPPLICATION FOR ADMISSION OF NEW SHARES
16th Jun 201412:25 pmRNSResult of AGM
16th Jun 20147:00 amRNSResults of Audit of New Prospective Resources
16th Jun 20147:00 amRNSJacaranda Well Spud
10th Jun 20147:00 amRNSAcquisition
29th May 20147:00 amRNSParaguay Update
21st May 20147:00 amRNSDirector Dealings
16th May 20147:00 amRNSNotice of AGM
30th Apr 20147:00 amRNSResults for the year ended 31 December 2013
30th Apr 20147:00 amRNSNew Independent Experts Report- Australian Update
24th Mar 20147:00 amRNSContracting and Mobilisation of Drilling Rig
20th Mar 20147:00 amRNSPresentation at Proactive Investor Forum
28th Feb 20149:03 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Feb 20147:02 amRNSDirector Dealing
27th Feb 201412:30 pmRNSTR-1: Notification of Major Interest in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.