We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Regulatory News (POW)

Share Price Information for Power Metal (POW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 15.00
Bid: 14.50
Ask: 15.50
Change: 0.00 (0.00%)
Spread: 1.00 (6.897%)
Open: 15.00
High: 15.00
Low: 15.00
Prev. Close: 15.00
POW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Haneti Project - Drill Programme Finalised

27 Jul 2020 14:30

RNS Number : 2021U
Power Metal Resources PLC
27 July 2020
 

27 July 2020

Power Metal Resources plc ("Power Metal" or the "Company")

Haneti Project - Nickel Sulphide Drill Programme Finalised

Power Metal Resources plc (LON:POW) the AIM listed metals exploration and development company is pleased to announce details of the planned confirmatory drilling programme targeting nickel sulphides at the Haneti Nickel Project in Tanzania ("Haneti" or the "Project").

HIGHLIGHTS:

Haneti Project

The Haneti Nickel Project covers an area of approximately 5,000 km2 in central Tanzania and comprises tenements (prospecting licences, offers and applications) prospective for nickel, platinum-group-elements and gold.

The main prospective belt of rocks within the Haneti Project is the linear dyke-like, Haneti-Itiso Ultramafic Complex ("HIUC"), which sporadically crops out over a strike length of 80 km.

Exploration Rationale

The JV partners being Power Metal & Katoro Gold Plc ("Katoro") are to undertake a phased exploration programme to assess the potential for nickel sulphide mineralisation within the HIUC.

Confirmation of targeted geological structures and the discovery of a new nickel sulphide deposit or deposits would generate considerable commercial value for the JV partners.

Exploration work will align with and complement discussions with third parties, who have expressed interest in the Haneti Project.

Drill Programme

First stage exploration programme verifying and drill-testing potential chonolith-type nickel sulphide mineralisation within the HIUC.

A short shallow (100m) rotary air blast drill programme will seek to verify three near-surface targets ahead of a confirmatory deep (300m) diamond drilling programme.

Airborne geophysics over the wider project area will seek to delineate additional deep-seated targets.

Programme Funding

Based on the outlined drill programme the proposed Power Metal contribution is to be funded from existing working capital, and an amount covering this has already been allocated in the Company's USD account.

 

CHIEF EXECUTIVE OFFICER'S STATEMENT

Paul Johnson Chief Executive Officer of Power Metal Resources plc commented: "The Haneti story is one I have been following for many years and it was a great opportunity to take a project interest for Power Metal shareholders in 2019.

We have now moved the Haneti JV forward and prepared a nickel sulphide targeting drill programme, through which we aim to advance our understanding of the geological characteristics of the Project and, potentially, make a new nickel sulphide discovery.

We are being disciplined with a two-stage drill programme using shallow rotary air blast drilling to verify the proposed targets for a follow-on deeper diamond drill programme.

The next step is a practical one, as we make preparations for the launch of the drill programme, and we look forward to announcing mobilisation which will be an exciting point for both JV partners."

 

HANETI PROJECT OWNERSHIP STRUCTURE

Power Metal currently holds a 25% interest in the Project with a 75% interest held by JV partner Katoro Gold plc (LON:KAT).

Power Metal also holds an option to increase its interest in the Project from 25%% to 35% through a payment to Katoro Gold of £25,000 by 31 August 2020.

PROJECT OVERVIEW

The Haneti Nickel Project ("Haneti") covers an area of approximately 5,000 km2 in central Tanzania approximately 88 km north of the capital city Dodoma. It comprises tenements (prospecting licences, offers and applications) prospective for nickel, platinum-group-elements and gold.

One of the key exploration objectives for the JV partners at the Haneti Project is seeking to delineate the potential for economic nickel mineralisation in central Tanzania.

HANETI GEOLOGY AND NICKEL PROSPECTIVITY

The main prospective belt of rocks within the Haneti Project is the, linear dyke-like, Haneti-Itiso Ultramafic Complex ("HIUC") which sporadically crops out over a strike length of 80 km and mainly comprises serpentinites (metamorphosed ultrabasic rocks such as dunite and peridotite), with metabasic rocks such as metagabbro and metadolerite.

Geologically the Haneti tenements straddle the boundary between the Archaean Dodoman Craton to the south‐west and gneisses of the Palaeo‐Proterozoic Usagaran Orogenic Complex to the northeast.

Bordering the Haneti block to the west, a new greenstone belt, the Londoni Greenstone Belt has been recognised in recent years within the Archaean Dodoman System. This greenstone geology extends southeast into the Haneti project where work on third party mining claims that occur within the Haneti prospecting licence Offer area, PLA 1162, has reported positive results.

 

 

HISTORIC EXPLORATION

The Haneti area was first explored in 1931 by a private prospector who collected a Ni‐rich magnetite sample at Mihanza Hill. Later trenching uncovered a few discontinuous green‐stained veins rich in Ni‐silicates and containing several percent nickel.

In the early 1960s the Geological Survey of Tanzania carried out mapping, pitting, soil sampling, trenching and rock chip sampling of ultramafic outcrops on the Zoani, Mindii and Mihanza hills, within the HIUC belt.

Further geological mapping and sampling was undertaken in 2006, 2007 and in 2013.

An airborne electromagnetic ("AEM") geophysics survey was completed over the Mihanza and Mwaka Hill anomalies in 2012 with further geophysics flown in 2015.

A study commissioned with a consultant expert in ultramafic geochemistry in 2015 identified the nickel, copper, platinum, palladium anomaly at Mihanza Hill as a drill ready target. This report suggested that the Itiso‐Haneti Ultramafic body may fit the Chonolith-Type Nickel exploration model which would imply that the main ultramafic belt may have small discrete sulphide bodies associated with it.

In 2019 a number of soil samples, collected during the 2013 exploration programme, were sent for analysis and the results confirmed the existing knowledge base and also identified a new ultramafic subcrop.

PROPOSED EXPLORATION DRILL PROGRAMME

Three preliminary target areas have been selected for exploratory diamond drilling; Milhanza Hill; Mwaka Hill; and Igari Hill, based on the recommendations of the 2012 AEM survey, the detailed field programme undertaken in 2013 and further supplementary exploration findings.

In order to maximise the chances of intersecting mineralisation, the diamond drilling will be preceded by a 20 hole programme of confirmatory rotary air-blast ("RAB") drilling. This phase will consist of 2,000 metres of RAB drilling consisting of two drill fences, 10 x 100 metre spaced, 100 metre deep holes.

The RAB drilling will seek to verify the existence of near surface mineralisation whilst increasing the geological understanding such that the orientation and the meterage of the follow-up diamond drill holes can be optimised to confirm the scale of potential massive sulphide mineralisation.

All RAB drill samples will be subject to multi element and base metal analysis on three metre composites with select samples analysed for platinum group elements.

The exact number and meterage of diamond drill holes will be refined by the RAB drill studies however the initial plan is for a minimum of three, 300 metre deep diamond holes.

The diamond holes are planned to provide a full intersection through the ultramafic inclusion and to provide fresh rock samples for detailed geochemical, petrographic and isotope analysis.

The aim is to identify nickel sulphide mineralisation.

In addition, an airborne Versatile Time Domain Electromagnetic ("VTEM") geophysics survey with the capability to generate targets at a depth of several hundred metres, is planned, to provide coverage of a greater proportion of the Haneti Nickel Project.

 

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, MIMMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

 

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No.596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

SP Angel Corporate Finance (Nomad and Joint Broker)

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

SI Capital Limited (Joint Broker)

Nick Emerson

+44 (0) 1483 413 500

First Equity Limited (Joint Broker)

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

 

Notes to Editors:

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration and development company seeking a large scale metal discovery.

The Company has a global portfolio of project interests including gold exploration in North America and Australia together with base metal exploration in Africa. Project interests range from early stage greenfield exploration to later stage drill ready prospects.

The Board and its team of advisors have expertise in project generation, exploration and development and have identified an opportunity to utilise the Company's position to become a leader in the London market for investors wishing to gain exposure to proactive global metals exploration.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEIFEWESSEIW
Date   Source Headline
10th Apr 20247:00 amRNSAdmission to trading on OTCQB Market
8th Apr 20244:30 pmRNSHolding(s) in Company
28th Mar 20244:30 pmRNSTotal Voting Rights
26th Mar 202412:00 pmRNSResult of General Meeting
26th Mar 202411:51 amRNSResults of Annual General Meeting
26th Mar 20247:00 amRNSBinding Earn-in Agreement Signed with RIWAQ
25th Mar 20247:00 amRNSUranium Energy Exploration Update
13th Mar 20247:00 amRNSDisposal of Victoria Goldfields JV Interest
12th Mar 20247:00 amRNSPower Arabia Limited (“Power Arabia”) Update
1st Mar 20247:00 amRNSShare Consolidation and Notice of General Meeting
29th Feb 20244:30 pmRNSTotal Voting Rights
29th Feb 202412:44 pmRNSAcquisition of 75% Interest in GSA (Environmental)
21st Feb 20247:00 amRNSAudited Financial Results
15th Feb 20247:00 amRNSAthabasca Basin, Strategic Uranium Property Staked
9th Feb 20246:24 pmRNSHolding(s) in Company
7th Feb 20242:08 pmRNSMolopo Farms Complex – Drilling Commences
6th Feb 20247:00 amRNSTati Project - Sampling Confirms Extensive Gold
1st Feb 20247:00 amRNSStrategic Financing Raising £1.3 million
31st Jan 20247:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
30th Jan 20245:08 pmRNSHolding(s) in Company
16th Jan 20247:00 amRNSDirectorate Change
12th Jan 202410:36 amRNSReplacement: MoU Signed at Future Minerals Forum
12th Jan 202410:06 amRNSMoU Signed at Future Minerals Forum
9th Jan 20247:00 amRNSFuture Minerals Forum Attendance
18th Dec 20237:00 amRNSAthabasca – Additional Priority Uranium Targets
15th Dec 20239:50 amRNSRelease of Research Note
14th Dec 20237:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
13th Dec 20239:45 amRNSUranium Energy Exploration Update
7th Dec 202310:24 amRNSFirst Development Resources Selta Project Update
6th Dec 20237:00 amRNSMolopo Farms Complex Botswana – Operational Update
20th Nov 20237:00 amRNSExploration Update – Significant Uranium Targets
10th Nov 20235:04 pmRNSHolding(s) in Company
6th Nov 20237:00 amRNSDisposal of Kavango Resources Shares for Cash
3rd Nov 20236:24 pmRNSHolding(s) in Company
31st Oct 20234:30 pmRNSTotal Voting Rights
31st Oct 20237:00 amRNSAttendance at New Orleans Investment Conference
25th Oct 20237:00 amRNSBusiness Update
11th Oct 20237:00 amRNSSignificant Uranium Targets Identified at Projects
6th Oct 20237:00 amRNSMolopo Farms Complex, Botswana, Exploration Update
5th Oct 202310:20 amRNSTati Gold Project – Gold Anomaly Exploration
3rd Oct 20236:11 pmRNSIssue of Equity
26th Sep 20232:23 pmRNSBadger Lake Uranium Project Update
20th Sep 20237:00 amRNSExpansion of Perch River Uranium Project
15th Sep 20237:00 amRNSTati Gold - Two Significant Anomalies Identified
8th Sep 20237:00 amRNSHelium Anomaly Discovered on Perch River
31st Aug 20237:00 amRNSExploration & Project Development Update
21st Aug 20231:13 pmRNSDirector Dealings
10th Aug 20237:00 amRNSIon Battery Resources-Lithium Exploration Underway
2nd Aug 20235:48 pmRNSIssue of new shares in lieu of fees
2nd Aug 20239:50 amRNSGrant of Director, Management and Staff Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.