Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Resources PLC Regulatory News (POW)

Share Price Information for Power Metal Resources PLC (POW)

Share Price is delayed by 15 minutes
Get Live Data
13.75    -0.25 (-1.79%)
Bid:
13.50
Ask:
14.00
Spread: 0.50 (3.704%)
Market Cap: £15.53m
POW Live PriceLast checked at - London Stock Exchange

Intraday Power Metal Resources PLC Share Chart

Ferensola Gold - Drill Programme Completion

8 May 2017 07:00

RNS Number : 3972E
Sula Iron & Gold PLC
08 May 2017
 

Sula Iron & Gold plc / Index: AIM / Epic: SULA / Sector: Natural Resources

8 May 2017

Sula Iron & Gold plc

("Sula" or the "Company")

 

Ferensola Gold - Drill Programme Completion

 

Sula (AIM: SULA), the gold exploration company focused on Sierra Leone, is pleased to announce the completion of the current diamond drilling campaign with a total of 14 drillholes for 3,788.5m from select locations across the Company's 100% owned, flagship Ferensola Gold Project.

 

Highlights:

 

· 14 drillholes completed for a total of 3,788.5m against a planned 10 holes for 2,400m;

· The programme resulted in four drillholes across the Sanama Hill (TZ0) target, seven drillholes across the TZ2 (Eastern Target) IP anomaly target and two drillholes on the TZ4 IP anomaly target;

· An additional "step out" hole was completed that targeted the underlying geological formation at the Kuwait artisanal mining area that lies to the west of the TZ2 anomaly; and

· A second and final batch of samples will be dispatched from camp on or around the 10th May, 2017.

 

Roger Murphy, Sula's CEO, commented:

"It is very pleasing to report not only the completion of this phase of drilling at Ferensola, but also to note that an additional 4 holes, representing almost 1,400m, were successfully completed against the original plan. This of course increases our understanding of this very interesting orebody and was possible because of the Equity Drilling deal structure and the ongoing analysis of the drilling by our technical experts that enabled siting of further holes. The Kuwait hole is particularly interesting as it targets an area that was not part of our original planning for this phase and may point to an entirely new target. We look forward to reporting assay values from samples already in the labs and those en route as they are received."

 

In total, Sula completed 3,788.5m of diamond drilling from 14 drillholes across the Sanama Hill (TZ0), TZ2, TZ4 and Kuwait artisanal anomalies. The extra metres drilled were utilised to extend the depth of numerous drillholes and to add additional holes to the programme based on the progressive geological understanding of the project and underlying controls on mineralisation. This included the addition of the Kuwait hole due to a review of the geophysical data and proximity to the extensive artisanal workings.

 

Logging and sampling of the final drillholes is currently in progress with Sula anticipating the dispatch from site to ALS laboratories in Ireland later this week.

 

**ENDS**

 

For further information please contact:

 

 

Sula Iron & Gold plc

 

Roger Murphy (CEO)

+44 (0) 20 7583 8304

 

 

WH Ireland Limited (Nominated Adviser and Broker)

Paul Shackleton

+44 (0) 20 7220 1756

VSA Capital Limited (Broker)

 

Andrew Raca

+44 (0) 20 3005 5000

Ongeza Mining (Financial and Technical Adviser)

 

Iain Macpherson / Ilja Graulich

 

+27 (0) 11 469 0629

 

 

 

Notes:

Sula Iron & Gold plc is a multi-commodity exploration company focused on West Africa. The Company's main objective is to explore and advance its 153km2 Ferensola Project in Northern Sierra Leone, which is highly prospective for gold, iron ore and coltan. In December 2014, the Company achieved a corporate milestone in delivering its JORC MRE for the BIF 1 iron ore project. A total resource of 514.5Mt @ 31.8% Fe was identified and total oxide resource of 55.5Mt @ 45.39% Fe. In June 2015, the Company defined a JORC Exploration Target on its Ferensola Gold Project. The Exploration Target centres on Sanama Hill, with a tonnage range of between 5 and 7 million tonnes ("Mt"), grading at between 4 and 8 g/t Au, which equates to between 0.8 and 1.5 million ounces ("Moz") Au. The Exploration Target was restricted to a 2km strike length segment of the regional fold belt that is believed to extend for over 10km.

 

The information in this release that relates to Exploration Results has been reviewed by Mr Howard Baker, Non-Executive Technical Director of Sula Iron and Gold plc. Mr Baker is a Chartered Professional Fellow of the Australasian Institute of Mining and Metallurgy (Membership Number 224239) and a Competent Person as defined by the rules of International Reporting Codes that are aligned with CRIRSCO.

 

Howard Baker has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also known as the JORC Code. The JORC code is a national reporting organisation that is aligned with CRIRSCO. Howard Baker consents to the inclusion in the announcement of the matters based on his information in the form and context in which they appear.

 

 

** Ends **

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSWFUWFWSELI
Date   Source Headline
26th Jul 202211:24 amRNSUranium Acquisitions - Athabasca Basin Canada
22nd Jul 202210:39 amRNSUK Government Critical Minerals Strategy Paper
21st Jul 20225:02 pmRNSExercise of Warrants & Warrant Update
19th Jul 20226:01 pmRNSExercise of Warrants
19th Jul 20222:30 pmRNSGolden Metal Resources - Company Update
18th Jul 20225:25 pmRNSExercise of Warrants
18th Jul 20227:00 amRNSTati Project, Botswana - Exploration Update
14th Jul 20225:24 pmRNSExercise of Warrants
12th Jul 20223:18 pmRNSUranium Targets Confirmed – Athabasca Basin Canada
12th Jul 202210:35 amRNSCanadian Lithium Projects – Earn-In Update
8th Jul 202210:30 amRNSConditional Disposal of Kanye Resources Interests
8th Jul 20227:00 amRNSKanye Resources JV – Botswana - Operational Update
6th Jul 20222:00 pmRNSAcquisition of Historic Berringa Gold Mine
4th Jul 20221:22 pmRNSTotal Voting Rights
27th Jun 20223:51 pmRNSInterim Results
24th Jun 20222:06 pmRNSSecond Price Monitoring Extn
24th Jun 20222:00 pmRNSPrice Monitoring Extension
22nd Jun 20223:09 pmRNSUranium Business Update and Togo Agreement
21st Jun 20226:02 pmRNSExercise of Warrants
17th Jun 20222:55 pmRNSInsider Warrant Extension
15th Jun 20227:00 amRNSDitau Project - Drilling and Geophysics Update
13th Jun 20222:30 pmRNSVictorian Goldfields – Exploration Update
13th Jun 20227:00 amRNSFirst Development Resources - Selta Lithium Update
1st Jun 20227:00 amRNSFirst Development Resources - Pre-IPO Financing
31st May 20226:08 pmRNSExercise of Warrants
31st May 20224:30 pmRNSTotal Voting Rights
31st May 20223:00 pmRNSHaneti Project, Tanzania – Exploration Update
24th May 20225:33 pmRNSExercise of Warrants
24th May 20227:00 amRNSVictorian Gold Fields - Grant of Key Licences
20th May 20221:30 pmRNSFirst Development Resources – Selta Project Update
20th May 20227:00 amRNSCompany Option Pool Expansion
18th May 20224:18 pmRNSKalahari Key Botswana – Acquisition
18th May 20227:00 amRNSDitau Camp Project - Drilling Programme Update
17th May 20227:00 amRNSExtension of Insider Options
16th May 20224:12 pmRNSFirst Class Metals Update
11th May 20223:02 pmRNSFDR Australia – Corporate Update
5th May 20229:30 amRNSDitau Project - Exploration Programme Expansion
4th May 20224:52 pmRNSMarketing and Communications Update
29th Apr 20224:41 pmRNSDitau Camp Project Botswana – Drilling Update
28th Apr 20225:33 pmRNSExercise of Warrants
22nd Apr 20221:38 pmRNSTati Project, Botswana – New Licence Granted
19th Apr 20227:00 amRNSDitau Project Botswana - Drilling Commences
12th Apr 20222:00 pmRNSGold Exploration Update - Victoria Goldfields
11th Apr 20227:00 amRNSFirst Development Resources - Australia site visit
8th Apr 20227:00 amRNSUranium Portfolio Update – Athabasca Basin
6th Apr 20221:07 pmRNSQuarterly Business Operational Update
4th Apr 20227:00 amRNSTati Project Botswana – Drill Programme Results
1st Apr 20223:40 pmRNSIssue of Non-executive Director Options
31st Mar 20227:00 amRNSSoaring Bay Uranium Property Update - Canada
30th Mar 20222:48 pmRNSResult of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.