We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Regulatory News (POW)

Share Price Information for Power Metal (POW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 15.00
Bid: 14.50
Ask: 15.50
Change: 0.00 (0.00%)
Spread: 1.00 (6.897%)
Open: 15.00
High: 15.00
Low: 15.00
Prev. Close: 15.00
POW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ditau Project Botswana - Drilling Commences

19 Apr 2022 07:00

RNS Number : 5045I
Power Metal Resources PLC
19 April 2022
 

19 April 2022

Power Metal Resources PLC

("Power Metal" or the "Company")

Ditau Project Botswana - Drilling Commences

Diamond Drilling Commences at the i10 Target - Seeking Rare-Earth Element Carbonatite Intrusives

 

Power Metal Resources PLC (LON:POW) the London listed exploration company seeking large-scale metal discoveries across its global project portfolio announces that diamond drilling has now commenced at the i10 Target ("i10" or the "Target") located within the Ditau Camp Project ("Ditau"), southwestern Botswana.

The i10 Target is marked by a discrete, circular, geophysical anomaly that is 2.2km in diameter and under an estimated 120m of sand cover. Kanye's primary objective is to retrieve diamond core to establish whether the Target's geophysical anomaly is caused by a carbonatite intrusive. Carbonatites are the world's primary source of rare-earth elements ("REEs") and other strategic/industrial metals including copper.

The Ditau Camp Project is held by Botswana based Kanye Resources Pty Limited ("Kanye"), which is a 50/50 joint-venture partnership with Kavango Resources plc (LSE:KAV) ("Kavango") - who are the operators.

Highlights

- Drill motivation

- The i10 Target is highlighted by a discrete circular magnetic anomaly, measuring 2.2km in diameter

- The Target is interpreted to lie at a shallow depth, below an estimated 120m of Kalahari sand cover - based on Audio-Magnetotelluric ("AMT") data obtained over i10.

- Kanye has successfully completed aeromagnetic and AMT inversions over the Target.

- The Target has been independently verified to conform to an idealised model for carbonatite intrusives, based on its aeromagnetic signature.

- Idealised Ore Deposit Model

- I10 is a carbonatite pipe intrusive target

- Based on the magnetic signature, the Target has concentric "ring-like" lithological zonation, which could relate to rare-earth element mineralised horizons

- Target lies near the margin of the Kaapvaal Craton, a tectonic context common to other carbonatites globally

- Drill operations

- Camp secured, road access and drill pads completed

- Water borehole successfully drilled and solar powered water pump installed

- First of two planned drillholes at i10, hole DITDD003, commenced drilling on 15 April 2022, which is targeting the core of the magnetic high and has a target depth of 400m

- Drilling is being conducted by Mindea Exploration & Drilling Services (Pty) ("Mindea")

- The plan is to drill up to six ~400m deep diamond drillholes at Ditau, including 2 drillholes at three separate magnetic anomlies, including i10.

Paul Johnson, Chief Executive Officer of Power Metal Resources plc, commented:

"I have talked previously about the confidence we hold in the geological prospectivity across our projects in Botswana. That confidence means within an 18 month period, with Molopo, Tati and now Ditau, we have launched three drill programmes.

The Molopo drill programme successfully confirmed the presence of nickel, Tati confirmed the presence of gold and now we seek confirmation of rare earth elements at Ditau. 

To say we are excited about the prospects for our interests in Botswana is an understatement. Let's see what this drill programme delivers."

 

Background Targeting

The Ditau Camp Project is centred around 12 unique geophysical anomalies (targets i1 through i12), which Kanye believes could be caused by possible carbonatites and/or intrusive complexes that may host rare-earth element mineralisation.

Targets i1 - i12 are seperated into two main target types:

1) Discrete kilometre-scale carbonatite pipe targets, and

2) Larger, multi-kilometre scale intrusive complex targets that may also be host to carbonatites and/or mafic intrusive bodies prospective for base-metal mineralisation.

The 12 Ditau geophysical targets are not known to have been drill tested for either REEs or base-metal mineralisation historically. Kanye originally identified these targets, which range in size from 1km to 20km in diameter, using interpretation of airborne magnetic data. To date, Kanye has used combined airborne- and ground-magnetic, and AMT surveys in the exploration at Ditau.

Target i10

Kanye believes the i10 Target anomaly could be caused by a discrete, 2.2km wide carbonatite pipe. The Target is interpreted as a simple, single phase carbonatite pipe with a possible outer ring indicated by a weak magnetic low ringing the main magnetic high feature.

A 3D inversion of the aeromagnetic data with an AMT section overlay of the I10 Target can be found at Kavango's website at the link below:

https://www.kavangoresources.com/media-library/news-release-media/rns19april2022

Based on analysis of the AMT data over i10, the Kalahari sand cover is estimated to be roughly 120m thick. The magnetic inversion results confirm that the primary target zone lies just underneath this sand cover.

To confirm the current geophysical interpretation of the i10 Target, Kanye is currently planning to drill two diamond drillholes into i10. The first drillhole, which is currently underway, will target the core of the magnetic high, while the second hole is designed to test the edge of the geophysical anomaly.

Target i10 Idealised Ore Deposit Model

In the analysis of geophysical data over i10, Kavango has used the rare-earth element bearing Kangankunde carbonatite pipe ("Kangankunde") located in Malawi as a model.

Kangankunde is one of the largest carbonatites within the Chilwa Alkaline Province ("Chilwa") at ~1.5km in diameter. Chilwa is a roughly 300km in diameter, and is comprised of Late Jurassic-Early Cretaceous alkaline rocks with clusters of carbonatite pipes - including Kangankunde.

At the surface, Kangankunde forms a low hill, which rises approximately 200m above the surrounding plains, with lower slopes composed of fenitised and locally fractured (brecciated) rocks with the upper slopes predominantly of carbonatite intrusive rocks.

Although the i10 target is buried under roughly 120m of Kalahari sand cover, Kanye's geological team believe that the geophysical signatures are comparable to that of Kangankunde. The highlight the various similarities, a geological map of Kangankunde can be found on Kavango's website at the link below:

https://www.kavangoresources.com/media-library/news-release-media/rns19april2022

Carbonatites can exhibit significant lithological and structural variation, both between and within individual pipes. As such, to maximise the chances of exploration success in exploring for carbonatite hosted REE deposits, it is common practice to drill multiple boreholes along a fence pattern into a single target. The geological map of Kangankunde illustrates its concentric geological complexity and therefore the necessity for drilling multiple drillholes within i10 to elucidate the geology and locate potential indicators of REE or base-metal mineralisation.

Ongoing Drilling Operations

The drill camp has been constructed. All supporting equipment and key personnel are currently located on site.

Kanye has successfully drilled a 180m deep water borehole, which should yield enough water to support ongoing drilling operations. A solar powered pump has been installed and is currently operational.

Road access between the drill camp, drill collar locations and water sources is also complete.

Drilling operations successfully commenced on Friday 15 April 2022. In total, Kanye expects to drill up to 6 diamond drillholes as part of the current campaign (totalling ~2,400m). Each hole has an anticipated target depth of 400m, and Kanye aims to test 3 of the 12 geophysical targets as part of the ongoing drilling campaign.

Kanye and its contractors have designed the current Ditau drill campaign to be flexible and guided by ongoing visual results. Kanye will release field and laboratory results on the current planned 6-hole drill campaign once all data has been received, processed and verified.

Contingent on results from the ongoing drilling campaign, Kanye has identified a further 17 drill collar locations for future drill testing across all 12 geophysical targets/structures at Ditau.

Regional Geological Setting

Carbonatite intrusives often occur in swarms or clusters, oriented along favourable and clearly defined deep continental scale geological and structural trends. The 12 geophysical structures at Ditau occur within a southwest-northeast oriented corridor, part of the same corridor that host the Mabuasehube and Kokong kimberlites. Desktop analysis of regional geological and geophysical data by Kanye's geologists suggest that this trend is sub-parallel to other corridors that host other kimberlite groups in Botswana and northwest Angola. In the latter, these trends are known to host both kimberlite and carbonatite intrusives, meaning that the presence of one is a strong indicator for the other.

In addition to the known presence of kimberlites within the geological corridor where Ditau is located, and further enhancing the prospectivity for Carbonitites on the Project, there is a small known cluster of carbonatite intrusives including KW2, Definite, KS12 and KS36 (the "Falconbridge Carbonatites") which are located near to the Project. The Falconbridge Carbonatites were drilled by Falconbridge Exploration Botswana (Pty) Ltd in the late 1970s and early 1980s, to the immediate north of and 30km along strike to the northeast of the Ditau Project.

 

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

 

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

 

 

SP Angel Corporate Finance (Nomad and Joint Broker)

 

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

 

 

SI Capital Limited (Joint Broker)

 

Nick Emerson

+44 (0) 1483 413 500

 

 

First Equity Limited (Joint Broker)

 

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

 

NOTES TO EDITORS

Power Metal Resources plc - Background

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration company which finances and manages global resource projects and is seeking large scale metal discoveries.

The Company has a principal focus on opportunities offering district scale potential across a global portfolio including precious, base and strategic metal exploration in North America, Africa and Australia.

Project interests range from early-stage greenfield exploration to later-stage prospects currently subject to drill programmes.

Power Metal will develop projects internally or through strategic joint ventures until a project becomes ready for disposal through outright sale or separate listing on a recognised stock exchange thereby crystallising the value generated from our internal exploration and development work.

Value generated through disposals will be deployed internally to drive the Company's growth or may be returned to shareholders through share buy backs, dividends or in-specie distributions of assets.

 

Power Metal Exploration Programmes Underway/Results Awaited

Power Metal has exploration programmes completed or underway, with results awaited, as outlined below:

Project

Location

POW %

Work Completed or Underway

Results Awaited

 

 

 

 

 

Alamo Gold Project

USA

Earn-in to 75%

Excavation of multiple test pits and mapping & sampling.

Field and assay results from on-site work programme.

Athabasca Uranium

Canada

100%

Data compilation across uranium properties

Interpretation results from all Properties complete. Next steps upcoming.

Authier North Lithium

Canada

Earn-in to 100%

Soil & rock sampling completed

Technical Review of exploration results & define next exploration steps.

Ditau Project

Botswana

50%

Drill programme focused on key targets notably drilling of potential carbonatites and targeting rare-earth elements.

Field updates and receipt & review of laboratory assay results.

Kalahari Copper Belt

Botswana

50%

Exploration programme underway across the South Ghanzi Project and further exploration at the more recently acquired South Ghanzi Extension and Mamuno licence areas

Field programme findings and defined drill targets for near term drilling.

Molopo Farms

Botswana

53%

Review of recent exploration findings.

Determine next exploration steps and action plan.

Haneti Project

Tanzania

35%

Diamond drill programme completed

Receipt & review of laboratory assay results.

Victoria Goldfields

Australia

49.9%

Diamond drill programme underway

 

Field updates and receipt & review of laboratory assay results.

Paterson Projects

Australia

83.33%

Wallal passive seismic and 2D seismic processing work programme completed.

Review of historical data and target generation for Ripon Hills & Braeside West projects.

 

 

Findings from multiple work programmes including final approvals and preparations for planned deep diamond drilling.

Selta Project

Australia

83.33%

Field reconnaissance work now underway, including mapping and sampling.

Field updates.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBVLLFLZLEBBK
Date   Source Headline
10th Apr 20247:00 amRNSAdmission to trading on OTCQB Market
8th Apr 20244:30 pmRNSHolding(s) in Company
28th Mar 20244:30 pmRNSTotal Voting Rights
26th Mar 202412:00 pmRNSResult of General Meeting
26th Mar 202411:51 amRNSResults of Annual General Meeting
26th Mar 20247:00 amRNSBinding Earn-in Agreement Signed with RIWAQ
25th Mar 20247:00 amRNSUranium Energy Exploration Update
13th Mar 20247:00 amRNSDisposal of Victoria Goldfields JV Interest
12th Mar 20247:00 amRNSPower Arabia Limited (“Power Arabia”) Update
1st Mar 20247:00 amRNSShare Consolidation and Notice of General Meeting
29th Feb 20244:30 pmRNSTotal Voting Rights
29th Feb 202412:44 pmRNSAcquisition of 75% Interest in GSA (Environmental)
21st Feb 20247:00 amRNSAudited Financial Results
15th Feb 20247:00 amRNSAthabasca Basin, Strategic Uranium Property Staked
9th Feb 20246:24 pmRNSHolding(s) in Company
7th Feb 20242:08 pmRNSMolopo Farms Complex – Drilling Commences
6th Feb 20247:00 amRNSTati Project - Sampling Confirms Extensive Gold
1st Feb 20247:00 amRNSStrategic Financing Raising £1.3 million
31st Jan 20247:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
30th Jan 20245:08 pmRNSHolding(s) in Company
16th Jan 20247:00 amRNSDirectorate Change
12th Jan 202410:36 amRNSReplacement: MoU Signed at Future Minerals Forum
12th Jan 202410:06 amRNSMoU Signed at Future Minerals Forum
9th Jan 20247:00 amRNSFuture Minerals Forum Attendance
18th Dec 20237:00 amRNSAthabasca – Additional Priority Uranium Targets
15th Dec 20239:50 amRNSRelease of Research Note
14th Dec 20237:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
13th Dec 20239:45 amRNSUranium Energy Exploration Update
7th Dec 202310:24 amRNSFirst Development Resources Selta Project Update
6th Dec 20237:00 amRNSMolopo Farms Complex Botswana – Operational Update
20th Nov 20237:00 amRNSExploration Update – Significant Uranium Targets
10th Nov 20235:04 pmRNSHolding(s) in Company
6th Nov 20237:00 amRNSDisposal of Kavango Resources Shares for Cash
3rd Nov 20236:24 pmRNSHolding(s) in Company
31st Oct 20234:30 pmRNSTotal Voting Rights
31st Oct 20237:00 amRNSAttendance at New Orleans Investment Conference
25th Oct 20237:00 amRNSBusiness Update
11th Oct 20237:00 amRNSSignificant Uranium Targets Identified at Projects
6th Oct 20237:00 amRNSMolopo Farms Complex, Botswana, Exploration Update
5th Oct 202310:20 amRNSTati Gold Project – Gold Anomaly Exploration
3rd Oct 20236:11 pmRNSIssue of Equity
26th Sep 20232:23 pmRNSBadger Lake Uranium Project Update
20th Sep 20237:00 amRNSExpansion of Perch River Uranium Project
15th Sep 20237:00 amRNSTati Gold - Two Significant Anomalies Identified
8th Sep 20237:00 amRNSHelium Anomaly Discovered on Perch River
31st Aug 20237:00 amRNSExploration & Project Development Update
21st Aug 20231:13 pmRNSDirector Dealings
10th Aug 20237:00 amRNSIon Battery Resources-Lithium Exploration Underway
2nd Aug 20235:48 pmRNSIssue of new shares in lieu of fees
2nd Aug 20239:50 amRNSGrant of Director, Management and Staff Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.