Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Resources PLC Regulatory News (POW)

Share Price Information for Power Metal Resources PLC (POW)

Share Price is delayed by 15 minutes
Get Live Data
13.75    -0.25 (-1.79%)
Bid:
13.50
Ask:
14.00
Spread: 0.50 (3.704%)
Market Cap: £15.53m
POW Live PriceLast checked at - London Stock Exchange

Intraday Power Metal Resources PLC Share Chart

Ferensola Gold - Drill Programme Completion

8 May 2017 07:00

RNS Number : 3972E
Sula Iron & Gold PLC
08 May 2017
 

Sula Iron & Gold plc / Index: AIM / Epic: SULA / Sector: Natural Resources

8 May 2017

Sula Iron & Gold plc

("Sula" or the "Company")

 

Ferensola Gold - Drill Programme Completion

 

Sula (AIM: SULA), the gold exploration company focused on Sierra Leone, is pleased to announce the completion of the current diamond drilling campaign with a total of 14 drillholes for 3,788.5m from select locations across the Company's 100% owned, flagship Ferensola Gold Project.

 

Highlights:

 

· 14 drillholes completed for a total of 3,788.5m against a planned 10 holes for 2,400m;

· The programme resulted in four drillholes across the Sanama Hill (TZ0) target, seven drillholes across the TZ2 (Eastern Target) IP anomaly target and two drillholes on the TZ4 IP anomaly target;

· An additional "step out" hole was completed that targeted the underlying geological formation at the Kuwait artisanal mining area that lies to the west of the TZ2 anomaly; and

· A second and final batch of samples will be dispatched from camp on or around the 10th May, 2017.

 

Roger Murphy, Sula's CEO, commented:

"It is very pleasing to report not only the completion of this phase of drilling at Ferensola, but also to note that an additional 4 holes, representing almost 1,400m, were successfully completed against the original plan. This of course increases our understanding of this very interesting orebody and was possible because of the Equity Drilling deal structure and the ongoing analysis of the drilling by our technical experts that enabled siting of further holes. The Kuwait hole is particularly interesting as it targets an area that was not part of our original planning for this phase and may point to an entirely new target. We look forward to reporting assay values from samples already in the labs and those en route as they are received."

 

In total, Sula completed 3,788.5m of diamond drilling from 14 drillholes across the Sanama Hill (TZ0), TZ2, TZ4 and Kuwait artisanal anomalies. The extra metres drilled were utilised to extend the depth of numerous drillholes and to add additional holes to the programme based on the progressive geological understanding of the project and underlying controls on mineralisation. This included the addition of the Kuwait hole due to a review of the geophysical data and proximity to the extensive artisanal workings.

 

Logging and sampling of the final drillholes is currently in progress with Sula anticipating the dispatch from site to ALS laboratories in Ireland later this week.

 

**ENDS**

 

For further information please contact:

 

 

Sula Iron & Gold plc

 

Roger Murphy (CEO)

+44 (0) 20 7583 8304

 

 

WH Ireland Limited (Nominated Adviser and Broker)

Paul Shackleton

+44 (0) 20 7220 1756

VSA Capital Limited (Broker)

 

Andrew Raca

+44 (0) 20 3005 5000

Ongeza Mining (Financial and Technical Adviser)

 

Iain Macpherson / Ilja Graulich

 

+27 (0) 11 469 0629

 

 

 

Notes:

Sula Iron & Gold plc is a multi-commodity exploration company focused on West Africa. The Company's main objective is to explore and advance its 153km2 Ferensola Project in Northern Sierra Leone, which is highly prospective for gold, iron ore and coltan. In December 2014, the Company achieved a corporate milestone in delivering its JORC MRE for the BIF 1 iron ore project. A total resource of 514.5Mt @ 31.8% Fe was identified and total oxide resource of 55.5Mt @ 45.39% Fe. In June 2015, the Company defined a JORC Exploration Target on its Ferensola Gold Project. The Exploration Target centres on Sanama Hill, with a tonnage range of between 5 and 7 million tonnes ("Mt"), grading at between 4 and 8 g/t Au, which equates to between 0.8 and 1.5 million ounces ("Moz") Au. The Exploration Target was restricted to a 2km strike length segment of the regional fold belt that is believed to extend for over 10km.

 

The information in this release that relates to Exploration Results has been reviewed by Mr Howard Baker, Non-Executive Technical Director of Sula Iron and Gold plc. Mr Baker is a Chartered Professional Fellow of the Australasian Institute of Mining and Metallurgy (Membership Number 224239) and a Competent Person as defined by the rules of International Reporting Codes that are aligned with CRIRSCO.

 

Howard Baker has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also known as the JORC Code. The JORC code is a national reporting organisation that is aligned with CRIRSCO. Howard Baker consents to the inclusion in the announcement of the matters based on his information in the form and context in which they appear.

 

 

** Ends **

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSWFUWFWSELI
Date   Source Headline
19th Aug 20257:00 amRNSDisposal of Remaining Holding in GMET
13th Aug 20254:43 pmRNSHolding(s) in Company
29th Jul 20257:10 amRNSFirst Development Resources First Day of Dealings
25th Jul 20252:02 pmRNSResults of Annual General Meeting
11th Jul 202512:10 pmRNSFirst Development Resources - IPO Update
30th Jun 20257:00 amRNSResults for the Period Ended 31 December 2024
23rd Jun 20257:00 amRNSBlock 8 Oman: Exploration Update - 7.8% Cu Sample
18th Jun 20257:00 amRNSUranium Joint Venture: Badger Lake Update
16th Jun 20257:00 amRNSBinding agreement with AMAK
11th Jun 20257:00 amRNSExploration Update on the Perch River Property
20th May 20254:58 pmRNSHolding(s) in Company
14th May 202511:11 amRNSDirector Dealings
1st May 202510:00 amRNSHolding(s) in Company
17th Apr 20257:00 amRNSBlock 8: Initial Ground Gravimetric Survey Results
31st Mar 20257:00 amRNSUranium JV: Drake Lake-Silas Property Update
27th Mar 20257:00 amRNSSilver Peak Project Interest Disposal
21st Mar 202510:38 amRNSHolding(s) in Company
21st Mar 20257:00 amRNSUranium JV: Reitenbach Exploration Update
18th Mar 20257:13 amRNSHaneti Project Review
10th Mar 20257:00 amRNSLetter of Intent with Al Masane Al Kobra Mining
21st Feb 20255:37 pmRNSHolding(s) in Company
20th Feb 202512:41 pmRNSPartial Disposal of GMET Holding
18th Feb 20257:00 amRNSAcquisition of the Fortin River Project
14th Feb 20257:00 amRNSUranium JV: Tait Hill Exploration Update
11th Feb 20257:00 amRNSPartial Disposal of GMET Holding
31st Jan 20257:00 amRNSTotal Voting Rights
30th Jan 20257:00 amRNSBlock 8 Oman: Exploration Update
13th Jan 20257:00 amRNSHolding(s) in Company
30th Dec 20247:00 amRNSInterim Results
24th Dec 20247:00 amRNSGSAe Agreement Update and Issue of Equity
11th Dec 20247:00 amRNSUpdate on RRR Agreement
11th Dec 20247:00 amRNSFermi Exploration: Acquisition of Pardoe
9th Dec 20241:58 pmRNSLetter of Intent signed with AMAK Update
2nd Dec 20247:00 amRNSUranium JV Renamed & Exploration Update
21st Nov 20247:00 amRNSTechnical Overview of Drake Lake–Silas Project
15th Nov 202412:45 pmRNSDirector Dealing
14th Nov 20242:54 pmRNSGrant of Director, Management and Staff Options
14th Nov 20247:00 amRNSPerch River – Significant Uranium Target Outlined
13th Nov 20247:00 amRNSUranium-Focused Joint Venture – Exploration Update
31st Oct 20244:30 pmRNSTotal Voting Rights
25th Oct 20247:00 amRNSAgreement with Alara Resources & Awtad Copper
24th Oct 20244:07 pmRNSTR-1: Notification of major holdings
8th Oct 20242:53 pmRNSAgreement with Alara Resources & Awtad Copper
7th Oct 20247:00 amRNSSuccessful Completion of Uranium-Focused JV
2nd Oct 20242:43 pmRNSChange of accounting reference date
30th Sep 20247:00 amRNSUpdate on Formation of Uranium-Focused JV
16th Sep 20247:00 amRNSUpdate on Proposed Formation of Uranium-Focused JV
11th Sep 20247:00 amRNSHoT with Alara Resources & Awtad Copper
10th Sep 20247:57 amRNSLetter of Intent signed with AMAK
6th Sep 20247:00 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.