focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.925
Bid: 0.90
Ask: 0.95
Change: 0.025 (2.78%)
Spread: 0.05 (5.556%)
Open: 0.96
High: 0.96
Low: 0.90
Prev. Close: 0.90
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Successful Production of Syngas

31 Jul 2017 07:00

POWERHOUSE ENERGY GROUP PLC - Successful Production of Syngas

POWERHOUSE ENERGY GROUP PLC - Successful Production of Syngas

PR Newswire

London, July 31

31 July 2017

PowerHouse Energy Group plc(“PowerHouse” or “the Company”)

Successful Production of Syngas

PowerHouse Energy Group Plc (AIM: PHE), the company focused on ultra high temperature gasification waste-to-hydrogen, waste-to-energy, and the creator of Distributed Modular Gasification© (DMG) systems, is pleased to announce that the Company recorded a maximum peak flow rate of over 50 m3 per hour of synthesis gas (“syngas”) having successfully completed the rebuilding and enhancement of the Company’s G3-UHt gasification reactor at the Thornton Science Park. This is the second successful phase in the operation of the G3-UHt unit in the UK and the first at the Thornton Science Park.

Since the re-siting of the unit at Thornton in early May, the technical team have been working on integrating the G3-UHt system into the Energy Centre facility at Thornton, as well as aligning the system and the utilities to take best advantage of the research facilities available. Through this period a number of improvements and modifications to the G3-UHt system have been made, ahead of the scaling up necessary for commercial deployment. These have included the enhancement of the gas systems, refurbishment of the feed and steam generation systems, the complete redesign and introduction of programmable safety and control systems designed in line with UK Health, Safety, & Environment (“HSE”) legislation.

This latest commissioning, the positive engagement of senior planning and permitting personnel from the local Council, and the completion of a rigorous third party review to allow insurance cover to be put in place now positions the G3-UHt to begin full-scale, and on-going, operation, testing, and demonstration at the Thornton site. 

Following an extensive pre-commissioning programme, the 24 hour commission testing this weekend used tyre crumb as the input feedstock and produced a robust stream of syngas which was safely flared to the atmosphere. Subsequent testing will allow for a thorough analysis of the syngas produced, however, in-line, real-time analysis indicated that the quality of the gas produced met the Company’s initial quality objectives and there was full combustion of the syngas at the flare. The system was taken through cool-down and the team undertook post-operational review .

The demonstration unit at Thornton is critical to the next stage of modelling and process design. The conceptual design for the commercial modules will continue to be augmented by the operational input from the G3-UHt demonstrator. It is expected that the next few months should bring a number of industry players to Thornton, as well as potential commercial partners and interested shareholders. It is intended that the Company will host one or more demonstration visits for investors at the Thornton Science Park in September and full details will be announced in due course.

Pursuant to the announcement of 5 June 2017 the successful re-commissioning and operation of the G3-UHt at Thornton has released the first £100,000 tranche of a potential £500,000 from a UK partner dedicated to the planning and permitting of the Company’s first commercial sites. 

David Ryan, Powerhouse Executive Director of Programme Development said: “The PowerHouse team were superbly supported by our design consultants Engsolve, the service company, Roseberry and IDM. All have worked extremely hard and to a tight timescale to achieve this milestone. We were aided and supported at each stage by the staff of the University of Chester and by the support staff at the Thornton Energy Centre. The sight and sound of gas production at the flare was a great manifestation of all the hard work.

“This extended operation at high temperature was an excellent result and we look forward to the planned commercialisation programme with enthusiasm.”

Commenting, Keith Allaun, Executive Chairman of PowerHouse, said: “This is a hugely important milestone for the Company and one that our long-standing shareholders have been waiting for. With the successful initiation of our programme at Thornton, we can now begin to aggressively pursue our commercial agenda. The ability to regularly operate, demonstrate, and test the G3-UHt at Thornton allows us to begin the 25 tonne per day design engineering. The active engagement of the University of Chester faculty, the Ph.D program we’re co-sponsoring in ultra-high temperature gasification, coupled with our talented engineering team and programme leadership ensures that PowerHouse will lead the market in the deployment of distributed waste-to-hydrogen and waste-to-energy solutions. Distributed Modular Gasification© has only begun to make its mark and disrupt the industry. The opportunities ahead of us appear unlimited.”

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Executive ChairmanTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / James BavisterTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Joint Broker) Ben Turner / James PopeTel: +44 (0) 203 621 4120
Smaller Company Capital Limited (Joint Broker) Jeremy WoodgateTel: +44 (0) 203 651 2910
IFC Advisory (Financial PR & IR) Tim Metcalfe / Miles NolanTel: +44 (0) 203 053 8671

About PowerHouse Energy

PowerHouse is the holding company of the G3-UHt Ultra High Temperature Gasification Waste-to-Energy system, and the creator of Distributed Modular Gasification©.

The Company is focused on technologies to enable energy recovery from municipal waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create syngas for power generation, high-quality hydrogen, or potentially reformed into liquid fuels for transportation. Distributed Modular Gasification© allows for easy, economical, deployment and scaling of an environmentally sound solution to the growing challenges of waste elimination, electricity demand, and distributed hydrogen production. Distributed Modular Gasification and DMG are copyrights of Powerhouse Energy Group plc.

PowerHouse is quoted on the London Stock Exchange's AIM Market. The Company is incorporated in the United Kingdom.

For more information see www.powerhouseenenergy.net. PowerHouse may also be followed on Vox Markets at www.voxmarkets.co.uk/company/PHE.

Date   Source Headline
23rd Apr 20209:17 amPRNHolding(s) in Company
23rd Apr 20209:14 amPRNHolding(s) in Company
17th Apr 20203:18 pmPRNIssue of Equity
17th Apr 20203:14 pmPRNHolding(s) in Company
9th Apr 202011:39 amPRNIssue of Equity
2nd Apr 20207:00 amPRNIssue of Equity
23rd Mar 202011:00 amRNSPrice Monitoring Extension
19th Mar 20207:00 amRNSDirectorate Change
17th Mar 20204:42 pmRNSSecond Price Monitoring Extn
17th Mar 20204:36 pmRNSPrice Monitoring Extension
17th Mar 20202:06 pmRNSSecond Price Monitoring Extn
17th Mar 20202:01 pmRNSPrice Monitoring Extension
12th Mar 20205:31 pmPRNIssue of Equity
12th Mar 20204:38 pmRNSPrice Monitoring Extension
9th Mar 202012:07 pmPRNCorrection - DMG® Development Option Agreement with Peel
9th Mar 20207:00 amPRNDMG® Development Option Agreement with Peel
4th Mar 20207:00 amPRNPlanning Permission Granted for DMG® at Protos Site
28th Feb 202011:05 amRNSSecond Price Monitoring Extn
28th Feb 202011:00 amRNSPrice Monitoring Extension
27th Feb 20202:06 pmRNSSecond Price Monitoring Extn
27th Feb 20202:00 pmRNSPrice Monitoring Extension
26th Feb 20205:48 pmPRNIssue of Equity
26th Feb 20209:05 amRNSSecond Price Monitoring Extn
26th Feb 20209:00 amRNSPrice Monitoring Extension
13th Feb 202011:05 amRNSSecond Price Monitoring Extn
13th Feb 202011:00 amRNSPrice Monitoring Extension
13th Feb 20209:05 amRNSSecond Price Monitoring Extn
13th Feb 20209:00 amRNSPrice Monitoring Extension
12th Feb 20204:35 pmRNSPrice Monitoring Extension
12th Feb 202011:00 amRNSPrice Monitoring Extension
11th Feb 20207:00 amPRNSupplemental agreement with Peel Environmental
24th Jan 20207:00 amPRNIssue of Equity
6th Jan 20207:00 amPRNGrant for DMG Hydrogen from Waste Development at Protos
23rd Dec 20197:00 amPRNPowerHouse in Negotiations to Acquire W2T Limited
19th Dec 20197:00 amPRNProtos Development Funding
17th Dec 20194:41 pmRNSSecond Price Monitoring Extn
17th Dec 20194:36 pmRNSPrice Monitoring Extension
16th Dec 20194:40 pmRNSSecond Price Monitoring Extn
16th Dec 20194:35 pmRNSPrice Monitoring Extension
15th Nov 201910:47 amPRNIssue of Equity
27th Sep 20197:00 amRNSHalf-year Report
14th Aug 20192:23 pmPRNResult of AGM
14th Aug 201910:04 amPRNAGM Statement
14th Aug 20199:22 amPRNAGM
12th Aug 20197:00 amPRNCollaboration Contract
25th Jul 201911:48 amPRNDirector's Dealing
10th Jul 20199:15 amRNSEndorsement from Japanese Ministry of Economy
5th Jul 20199:03 amRNSDMG® ready to solve exported plastic waste crisis
28th Jun 20194:15 pmPRNIssue of Equity and Director/PDMR Shareholding
27th Jun 20197:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.