Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.21    0.00 (0.00%)
Bid:
0.20
Ask:
0.22
Spread: 0.02 (10.00%)
Market Cap: £10.76m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Completion of G3-UHt Testing Program

6 Sep 2016 07:00

POWERHOUSE ENERGY GROUP PLC - Completion of G3-UHt Testing Program

POWERHOUSE ENERGY GROUP PLC - Completion of G3-UHt Testing Program

PR Newswire

London, September 5

PowerHouse Energy Group plc

(“PowerHouse” or the “Company”)

Completion of G3-UHt Testing Program

PowerHouse Energy Group, plc is pleased to announce the completion of its system-wide testing program for the G3-UHt Unit in Brisbane, Australia.

“This is a significant milestone for the Company, “ said Keith Allaun, Executive Chairman of PowerHouse. “We’ve been stress-testing all components of the G3, in a discrete and focused manner, over the past several months. Based upon our most recent operation of the complete system, we’ve reached the point that we can declare the successful conclusion of our formal testing program.”

The PowerHouse Energy Group ultra-high temperature gasification reactor testing program has utilized feedstock which has included both shredded plastic and tyre crumble, and has successfully cycled the system repeatedly. The nominal 1-3 tonne per day (TPD) G3 unit has continued to operate as designed; gasifying the feedstock at temperatures above 1100 degrees Centigrade, generating synthesis gas (syngas), and cleaning and cooling the syngas, which can then be used for electrical generation or other fuel creation.

Concurrent with the testing of the G3, the company has completed the initial design and engineering plans of 100 TPD gasification modules, allowing for the easy bundling of the modules into 400 TPD systems. Designed to operate in-line with each other, expansion of the systems is a linear step-function that enables the PowerHouse technology to be rolled-out into existing commercial Transfer Station and Land-Fill operations. This modular design can substantially expand the commercial opportunities for PowerHouse.

“The rigorous process that the team has just completed, coupled with the engineering data that has been captured, has put us in a position to begin progressing commercial discussions with a number of parties over the next several months,” stated Allaun.

The new G3 system will be permanently housed in a transportable container for shipment to sites throughout the world for on-site operation, demonstration, and data collection purposes. Once installed into its in-situ operational container, and prior to shipment to prospective sites, additional third-party engineering validation will occur, and other feedstocks will be tested.

As earlier announced, the Company is beginning recruitment efforts to expand its commercial team in both the UK and in Australia.

Contacts:

PowerHouse Energy Group plc+1 352 359 0911
Keith Allaun, Executive Chairman
WH Ireland Limited (Nominated Adviser)+44 (0) 207 220 1666
James Joyce / James Bavister
Vicarage Capital Limited (Joint Broker)+44 (0) 203 651 2910
Jeremy Woodgate
Date   Source Headline
10th Jul 20199:15 amRNSEndorsement from Japanese Ministry of Economy
5th Jul 20199:03 amRNSDMG® ready to solve exported plastic waste crisis
28th Jun 20194:15 pmPRNIssue of Equity and Director/PDMR Shareholding
27th Jun 20197:00 amRNSFinal Results
11th Jun 20197:00 amRNSDMG® ready to solve exported plastic waste crisis
9th May 20197:00 amPRNDeveloper W2T Sign Power Agreement
17th Apr 20197:00 amPRNFirst Revenue Contract for PowerHouse Energy
10th Apr 20197:00 amPRNLease agreed for hydrogen development site
9th Apr 201911:35 amPRNAmendment: Issue of Equity & Director/PDMR Shareholding
27th Mar 20197:00 amPRNIssue of Equity and Director/PDMR Shareholding
15th Feb 20197:00 amPRNOperational Update
1st Feb 20197:00 amPRNChange of Directorate
31st Dec 201811:37 amRNSAmended:Waste2Tricity Report in The Sunday Express
31st Dec 20187:38 amPRNWaste2Tricity Report in The Sunday Examiner
18th Dec 20185:44 pmPRNHolding in Company
3rd Dec 20187:00 amPRNPlacing and Issue of Equity
26th Nov 201811:05 amRNSSecond Price Monitoring Extn
26th Nov 201811:00 amRNSPrice Monitoring Extension
26th Nov 20187:00 amPRNDiscussions with Toyota Tsusho Corporation
20th Nov 20187:30 amRNSAlign Research Updates Coverage on PowerHouse
18th Oct 20189:10 amPRNOperational Update
18th Oct 20187:00 amPRNDirector/PDMR Shareholding
17th Oct 20182:36 pmPRNDirector/PDMR Shareholding and Issue of Equity
17th Oct 20187:00 amPRNSuccessful independent technology assessment by DNV GL
15th Oct 20184:20 pmPRNIssue of Equity
28th Sep 201810:06 amPRNInterim Results
19th Sep 20187:30 amRNSResponse to BBC Presentation
9th Aug 20187:00 amPRNDirector/PDMR Shareholding
8th Aug 201811:10 amPRNIssue of Equity
6th Aug 20187:00 amPRNHolding(s) in Company
3rd Aug 201811:40 amPRNShares in Issue
1st Aug 20182:05 pmRNSSecond Price Monitoring Extn
1st Aug 20182:00 pmRNSPrice Monitoring Extension
27th Jul 201812:39 pmPRNResult of AGM
27th Jul 201810:55 amPRNAGM Statement
6th Jul 201810:39 amPRNCorrection: Placing and Issue of Equity
6th Jul 20189:45 amPRNReplacement : Placing and Issue of Equity
6th Jul 20187:30 amPRNPlacing and Issue of Equity
4th Jul 20182:09 pmPRNNotice of AGM
2nd Jul 20182:49 pmPRNStatement re press comments
29th Jun 20189:45 amPRNAudited results for the year ended 31 December 2017
19th Jun 20187:00 amPRNPowerHouse connects to microgrid
11th Jun 20187:00 amRNSPowerHouse CEO on The Future of Plastic
8th Jun 20184:35 pmRNSPrice Monitoring Extension
6th Jun 20182:49 pmPRNClarification regarding Thornton Science Park
18th May 20187:00 amPRNIssue of Equity
26th Apr 20185:20 pmPRNHolding(s) in Company
23rd Apr 201812:37 pmPRNClarification - Equity Placings
23rd Apr 201811:00 amRNSPrice Monitoring Extension
18th Apr 201812:10 pmPRNEquity Placings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.